Urgent Bldg. 44 Warehouse Chiller 36C25725P0770
Summary
AI-generated · Aug 24, 2025Replace the current Warehouse Chiller at Building 44, Dallas VA Medical Center (Dallas, TX) due to an underground water leak causing erosion and foundation issues. Remove and dispose of the existing chiller and install a new 30-ton Daikin or Carrier chiller with 460V 3-phase 60 Hz power. The unit must be galvanized steel with a 500-hour salt spray rating, multiple scroll compressors on resilient rubber isolators, dual refrigerant circuits precharged with R-32, and across-the-line start. Include Victaulic evaporator connections, BACnet/MSTP controls, necessary transformer, totally enclosed condenser fan motors, factory run testing prior to shipment, and standard 1-year parts warranty.
Additional requirements include aluminum alloy microchannel condenser coils, louvered hail guards, BACnet Building Automation System interface, factory authorized start-up, and 1-year labor warranty on compressors (plus an additional 4-year parts warranty on compressors). The contractor must install the chiller and ensure it is operational, confirm pumps and internal systems function, program and verify proper operation, and clean up the work area. The site must be clearly marked and blocked off during work.
Urgent Building 44 Warehouse Chiller Dallas VA medical center 4500 S. Lancaster Rd, Dallas TX 75216. Underground water leak at Herzog site causing erosion and foundation issues at the location. . Remove and dispose of current Warehouse Chiller. . Provide and install Daikin or Carrier 30-ton chiller . Chiller shall be- Galvanized steel construction, 500-hr salt spray rating / Multiple scroll type compressors on resilient rubber isolators / Dual refrigerant circuits, factory charged with R-32 refrigerant / Across the line start / Victaulic evaporator connections / BACnet/MSTP / Controls / transformer / Totally enclosed condenser fan motors / Factory run tested prior to shipment / Standard 1st year parts only warranty. 460/3/60 / Aluminum alloy microchannel condenser coils / Louvered hail guards / BACnet Building Automation System Interface / Factory authorized start-up / 1st Year labor warranty on compressors only / Additional 4 years parts warranty on compressors . Ensure the Chiller is installed and operational. . Ensure pumps are and internal systems are functioning properly. . Set programing and ensure working properly. . Clean up work area. . The contractor shall ensure the work site is clearly marked and blocked off.
From Award Notice posted on Aug 04, 2025Notice history
1Details
Award Information
Award Notices
Posted: Aug 04, 2025
Urgent Building 44 Warehouse Chiller Dallas VA medical center 4500 S. Lancaster Rd, Dallas TX 75216. Underground water leak at Herzog site causing erosion and foundation issues at the location. . Remove and dispose of current Warehouse Chiller. . Provide and install Daikin or Carrier 30-ton chiller...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| BRAND CONSTRUCTION LLC | JN8RP53DJ577 | 7YYN4 | West, TX |
Contacts
Phone
Agency
Place of Performance
USA