Contacts, documents and full notice history are available with a subscription.
Special Notice NONE Expired 1 notice 2 documents

URGENT AND COMPELLING JUSTIFICATION, SINGLE SOURCE, FOR EMERGENCY SEAWATER CHILLER REPAIRS FD-2026-501

Solicitation FD-2026-501 Copied Notice ID 5f35190c5bc64c5899b23476498e3cf1 Copied COMMERCE, DEPARTMENT OF — DEPT OF COMMERCE NOAA
SAM.gov
Posted
Jul 13, 2026
Deadline
Jul 25, 2026
Set-aside
NONE
NAICS
238220
PSC
J041

Summary

AI-generated · Jul 14, 2026

Emergency order for the immediate repair of a malfunctioning 80-ton York-brand seawater chiller at the Manchester Research Station. The work required includes replacing three faulty compressors, recovering and recharging refrigerant, and verifying proper operation after restart. This service is urgent and precludes competition; no quotes or responses are requested.

The chiller provides the continuous supply of chilled seawater needed for thousands of marine fish, including sablefish broodstock, which must be kept at 5 degrees C or below to survive and mature. With the unit operating at about 50% capacity, it cannot reliably chill water during high summer temperatures, risking deadly conditions for the fish and potentially devastating impacts on the aquaculture research program and its staff, collaborations, and investments.

This is not a request for quotes and no responses are required. This is a special notice for public awareness that NOAA Fisheries is issuing an emergency order for the immediate repair of a malfunctioning 80-ton York brand chiller at the Manchester Research Station. Necessary repairs include replacing three faulty compressors, recovering and recharging refrigerant, and ensuring proper chiller operation after restarting the unit. The service listed on 143041-26-0168 (26-501) is urgent and competition requirements are precluded for reasons indicated below. If the service is not received by the Required Delivery Date (7/20/26), specific damages to NOAA will result. The NWFSC Manchester Research Station requires this work to provide a continuous supply of chilled seawater that supports the thousands of marine fish housed at the Research Station, including sablefish broodstock. Early life stages of sablefish require water temperatures of 5 degrees C or less in order to survive, grow, and mature normally. Fish will die at elevated temperatures (>15 degrees C) or during abrupt and dramatic temperature fluctuations. The recent chiller malfunction has resulted in a 50% reduction of chilling capacity. Operation at 50% capacity will not be adequate to chill seawater to the necessary temperatures during high summer temperatures. Any loss of sablefish broodstock will be devastating to on-going aquaculture research activities that depend on these fish producing viable gametes. Sablefish take several years to reach maturity, and loss of fish could affect the aquaculture research program for many years. The sablefish program at Manchester currently supports 6 FTEs, two contract staff, productive CRADA collaborations with the Jamestown S Klallam tribe and aquaculture industry, and a host of collaborative projects within and outside of NOAA. The total monetary value of the sablefish currently at the Station exceeds several million dollars, considering the investments of labor, supplies, feed and other costs. The Station is providing real-time information to the aquaculture industry to support a sustainable seafood supply.

From Special Notice posted on Jul 13, 2026

Notice history

1
  1. Special Notice LATEST Posted Jul 13, 2026 View

Details

Solicitation number FD-2026-501
Notice ID 5f35190c5bc64c5899b23476498e3cf1
Notice type Special Notice
Product / Service (PSC) J041
NAICS 238220
Set-aside No Set aside used
Place of performance Washington
Archive date Jul 26, 2026

Award Information

Not yet awarded

Contacts

primary
Suzanne Johnston

Email

Agency

COMMERCE, DEPARTMENT OF
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
DEPT OF COMMERCE NOAA

Place of Performance

Washington 98366
USA

Dates

Posted Jul 13, 2026 3 weeks ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 25, 2026 1 week ago