UPS Maintenance N6471026Q0007
Summary
AI-generated · Apr 07, 2026Provide a full-service UPS maintenance and repair contract for three APC Symmetra PX UPS units at SWFPAC facilities on Naval Base Kitsap-Bangor, WA. The contractor will perform all-inclusive preventive maintenance, on-site emergency repair, and remote technical support, with 100% coverage of replacement parts, labor, travel, and related costs. Work must be performed by APC-certified or APC-authorized technicians using new OEM parts. Support is 24/7/365 via telephone and email; critical failures require on-site arrival within six hours, while non-critical failures must be addressed by the next business day, with an emphasis on preserving power redundancy and the protected load.
Deliverables include a Field Service Report within five business days after each PM visit or emergency repair and an Annual System Health Report at contract end. The Preventive Maintenance visit covers all three units and includes visual, environmental, cleaning, electrical and battery checks, calibration, firmware/software reviews and updates with SWFPAC approval, and a full functional test. Security and access requirements mandate APC-certified technicians, base access and escort procedures, and vehicle-pass controls. The presolicitation clarifies a brand-name APC requirement and a firm-fixed-price, supply-type contract; the detailed SOW expands the scope with explicit response times, maintenance tasks, and reporting obligations.
THIS IS A FIRM FIXED PRICE SUPPLY TYPE CONTRACT Strategic Weapons Facility Pacific will be soliciting on a Brand name basis for American Power Conversion in accordance with solicitation specifications. The anticipated posting date of the solicitation is on or about 6 April 2026 with a closing date on or about 13 April 2026. Requirement is being procured using FAR Part 12 and 13 Procedures. This solicitation and any subsequent amendments will be posted on the SAM.Gov Website: https://sam.gov. Interested persons may identify their interest and capability to respond to the requirement or submit proposals prior to offer due date, which will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. A determination not to compete this action based upon responses received to this notice is solely within the discretion of the Government. Prospective offerors are responsible for downloading their own copy of the solicitation from this website and for frequently monitoring that site for any amendments. The Government is not responsible for any inability of the offeror to access the posted documents. Prospective offerors should register themselves on the SAM.gov website. No telephone or FAX requests will be accepted, and no hard-copy solicitation/amendment will be mailed or FAXed. Offerors must also be registered in the System for Awards Management (SAM) in order to receive a Government Award in this procurement at https://www.sam.gov. All questions regarding this solicitation should be submitted to the Contracting Officer, Tabbatha Austin at Tabbatha.austin@swfpac.navy.mil or at spbcontracting@swfpac.navy.mil. ***DESCRIPTION OF ITEMS WILL BE POSTED AT THE TIME SOLICITATION IS POSTED***
From Presolicitation posted on Apr 06, 2026Statement Of Work UPS Maintenance and Repair BACKGROUND Strategic Weapons Facility Pacific (SWFPAC) requires comprehensive maintenance and repair service contract for three (3) Uninterruptible Power Supply (UPS) units located at SWFPAC facilities on Naval Base Kitsap-Bangor in Silverdale, WA. The purpose of this contract is to ensure the reliable operation of critical power infrastructure through proactive maintenance and timely emergency support. 2. Equipment Covered: Make Model Description Serial Number APC SYCF40KF Symmetra PX UPS 20kVA 40 and/or PDU QD1633340704 APC SYCF40KF Symmetra PX UPS 40kVA 40 and/or PDU QD1830240733 APC SYCF40KF Symmetra PX UPS 40kVA 40 and/or PDU QD1830240729 SCOPE: The contractor shall provide all-inclusive preventative maintenance, on-site emergency repair, and remote technical support for the UPS equipment listed in paragraph 2. To ensure the manufacturer's warranty remains valid, services must be delivered by an American Power Conversion (APC)-certified or authorized service provider. All components, parts, and consumables used for maintenance or repair must be new, genuine original equipment manufacturer parts that meet APC specifications. 3.1. Technical Support The contractor shall provide 24 hours a day, 7 days a week, 365 days a year (24/7/365) telephone and email access to a technical support center for troubleshooting and service dispatch. 3.2. On-Site Support Emergency On-Site Response: For any critical failure resulting in a loss of redundancy or an inability to support the protected load, a qualified technician must arrive on-site within six (6) hours of the service request being logged. This six (6) hour response shall be guaranteed 24/7/365. Standard On-Site Response: For non-critical failures where the UPS remains operational, a qualified technician must arrive on-site no later than the next business day. Parts & Labor: This contract shall cover 100% of the costs for all replacement parts, hardware, capacitors, fans, and any other components needed to restore the UPS units listed in paragraph 2 to full operational status. All associated labor, travel, and expenses for on-site visits shall be included. Equivalent Hardware: If a failed hardware component is no longer manufactured, it shall be replaced with an equivalent or superior component that is fully compatible. 3.3. Preventative Maintenance (PM) The contractor shall perform one (1) scheduled on-site preventative maintenance visit during the contract period. This visit shall include all UPS units listed in paragraph 2. The PM service must include, at a minimum, the following tasks for each UPS: Visual Inspection: Check for loose connections, overheating, component discoloration, and physical defects. Environmental Checks: Measure and record ambient temperature and humidity. Cleaning: Clean and remove dust/debris from the interior and exterior of the UPS. Electrical Checks: Perform thermal scans on electrical connections to identify potential failure points. Check and tighten all terminal connections as needed. Battery Maintenance: Conduct a full battery string inspection, including voltage checks, impedance testing, and a system load test to verify battery performance and runtime. System Calibration: Calibrate and verify all system alarms, setpoints, and transfer mechanisms. Firmware & Software: Review installed firmware and operating system software. Install any necessary updates, patches, or security fixes after receiving approval from SWFPAC personnel. Functional Test: Perform a full functional test to ensure the unit operates correctly in all modes (e.g., normal, battery, bypass). 4. DELIVERABLES The following deliverables are required: Field Service Report: After each preventative maintenance visit or emergency repair, the contractor shall provide a detailed electronic service report within five (5) business days. This report must document all work performed, tests conducted, parts replaced, and findings or recommendations. Annual System Health Report: At the conclusion of the contract period, the contractor shall provide a summary report detailing the overall health of the UPS fleet, a summary of service activities for the year, and recommendations for future maintenance or upgrades. 5. CONTRACTOR & PERSONNEL REQUIREMENTS Certification: All on-site technicians must be certified by APC to work on the specified UPS models. Proof of certification may be requested. Security & Access: The contractor and its personnel must comply with all SWFPAC security protocols, including requirements for background checks, site access, and safety procedures. The contractor will be escorted at all times unless prior arrangements are made. Base Access: Contractors must be able to gain access to SWFPAC on Naval Base Kitsap Bangor, WA. Base access may be granted using the Rapid Gate System, DBIDS System, or other approved base access system at the Contractor s expense. Once base access is granted, Contractors will be required to apply for a visitor badge (BAVR request) at https://www.bavr.cnic.navy.mil/. Coordination of the visitor badge will be through the Government Point of Contract. Vehicle Pass: In order to drive a non-Government vehicle to the work location, the contractor must submit a SWFPAC Vehicle Pass Request and required documents to the COR. The non-Government vehicle must be registered in the company s name and must have a clear logo displayed on the vehicle indicating the company it is registered to. When entering the base, the vehicle must have the approved vehicle pass displayed in the driver s side windshield at all times. No Bluetooth, telephonic, or electronic devices are allowed in secured locations on base.
From Solicitation posted on Apr 06, 2026Notice history
2-
-
Solicitation Posted Apr 06, 2026View changes (2)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA