United States Coast Guard (USCG) Yard Waterfront Improvements Project W912DR-26-R-1AO9
Summary
AI-generated · Sep 13, 2025Architectural-Engineering services are required for dredging the Curtis Creek channels and turning basin and for preparing a Design-Build Request for Proposal to upgrade waterfront infrastructure at the USCG Yard in Curtis Bay, Maryland. All dredging is considered new work. The contractor will perform engineering analyses of structures and utilities at risk or impacted by the dredging and will develop a Design-Build to Budget (DB2B) procurement package for waterfront improvements, including demolition and reconstruction of aging waterfront infrastructure critical to USCG operations.
The Architectural-Engineering Services are required for dredging of the Curtis Creek channels and turning basin and preparation of a Design-Build Request for Proposal (DB-RFP) to improve the waterfront infrastructure at the USCG Yard located in Curtis Bay, Maryland. All dredging is considered new work dredging. The selected Contractor will perform required engineering analysis on structures and utilities at risk and/or impacted by the dredging project. Additionally, the scope includes development of a Design-Build Request for Proposal (DB-RFP) utilizing a Design-Build to Budget (DB2B) construction acquisition strategy for waterfront improvements to include the demolition and reconstruction of aging waterfront infrastructure critical to USCG operations.
From Special Notice posted on Sep 11, 2025Notice history
1Details
Award Information
Not yet awarded