Amendment 0001 - Union Slough Emergency Levee Rehab Equipment W912DW25Q8011
Summary
AI-generated · Aug 23, 2025Work on the Union Slough levee rehab project covers: installing silt fencing, repairing or replacing armor rock along the slopes, placing base course and topsoil, and hydroseeding all disturbed areas to stabilize the levee and control erosion after emergency conditions.
An amendment updates the period of performance to a late-summer through early-fall 2025 window, while the scope of work remains the same and it continues to be set aside for small businesses.
The project consists of installation of silt fencing, repairing and/or replacing armor rock along the slopes of the levee, placement of base course and topsoil, and hydroseeding all disturbed areas. This is a total small business set-aside.
From Solicitation posted on Jun 27, 2025Amendment 0001 - Change of Period of Performance to 14 August to 30 September 2025. The project consists of installation of silt fencing, repairing and/or replacing armor rock along the slopes of the levee, placement of base course and topsoil, and hydroseeding all disturbed areas. This is a total small business set-aside.
From Solicitation posted on Jul 22, 2025Notice history
2-
-
Solicitation LATEST Posted Jul 22, 2025View changes (3)
- Title: Union Slough Emergency Levee Rehab Equipment → Amendment 0001 - Union Slough Emergency Levee Rehab Equipment
- Description: Description was updated
- Response Deadline: Jul 07, 2025 → Jul 28, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA