Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 2 notices 5 documents

Uninterruptible Power Systems (UPS) Maintenance and Repair W912KC26RA004

Solicitation W912KC26RA004 Copied Notice ID 5c517562b57247d98bc1a584ce0918bb Copied DEPT OF DEFENSE — W7NX USPFO ACTIVITY PA ARNG
SAM.gov
Posted
Apr 20, 2026
Deadline
Apr 23, 2026
Set-aside
SBA
NAICS
518210
PSC
J061

Summary

AI-generated · Apr 07, 2026

A blanket purchase agreement to provide end-to-end UPS service for MTC FTIG, including maintenance, repair, and replacement/upgrade of outdated parts. Expect 24/7/365 emergency repair with a qualified technician available by phone within 4 hours of an emergency call; if issues cannot be resolved remotely, on-site service within 24 hours. The contractor must diagnose failures and provide a cost estimate to restore the UPS to full operation, including labor and parts, and respond to corrective maintenance requests within 8 hours. A detailed report must be provided to the COR in PDF within one week after service, and any issues found must be reported immediately with proposed corrective actions. Two preventive maintenance visits per year are required, covering comprehensive visual, mechanical, and electrical inspections, system calibrations, and full functional testing of the UPS.

Battery maintenance is also required, including annual battery upkeep and semi-annual preventive maintenance inspections with measurements of cell voltages, cabinet voltages, ambient conditions, impedance and load testing, and system-wide functional checks. The contractor must perform battery testing and, for any battery that fails or shows signs of impending failure, provide a replacement quotation. The contractor will manage hazardous and non-hazardous waste disposal off Fort Indiantown Gap at no extra cost, conduct any necessary sampling, and ensure proper cleanup of spills at no cost. Work must comply with all applicable laws; the contractor must share pre-execution POC information (local and government) 15 days in advance. Hazard labeling and appropriate safety equipment must be provided as applicable.

This is a blanket purchase agreement. The period of performance is 1 May 2026 through 30 April 2031. General: This is a service contract to provide all necessary support to perform UPS service, maintenance, repairs and replacement/upgrade of outdated parts or equipment for the MTC FTIG. The contractor shall provide 24/7/365 emergency repair services to address any unscheduled system failures. The contractor shall provide a telephone response from a qualified technician within four (4) hours of receiving an emergency service call. If the issue cannot be resolved remotely, the contractor shall have a technician on-site within twenty-four (24) hours. The contractor shall diagnose the system failure and provide the cost estimated to restore the UPS to full operational status. This includes all necessary labor and the replacement of failed parts. The contractor shall respond to requests for corrective maintenance within 8 hours from the time the customer requests that service. The contractor shall diagnose the system failure and provide the cost estimated to restore the UPS to full operational status. This includes all necessary labor and the replacement of failed parts. The contractor is to furnish a detailed report to the COR in PDF format no later than 1 week after performing service. Any issues or deficiencies found during performance are to be immediately reported to the COR with proposed corrective action. The contractor shall provide two preventative maintenance services annually to be scheduled at the convenience of the Government. Preventative maintenance includes but is not limited to the following: Visual Inspection: inspect the UPS and battery cabinets for any signs of damage, overheating, fluid leakage, or loose connections. Verify that all air inlets and outlets are clean and free of obstructions to ensure proper ventilation. Check for and clean any accumulation of dust or debris on internal and external components. Mechanical and electrical checks: check all electrical connections, including internal wiring, breakers, and terminal blocks, to manufacturer-recommended specifications. Verify the integrity and functionality of all system components, including circuit breakers, fuses, and capacitors. Measure and record all critical AC and DC operational parameters (input/output voltage and current, frequency, battery voltage, and charge current). Rectifier: Record input/output voltages and currents. Verify proper float and equalize settings for installed battery plant. Verify tolerance on the filtered DC bus. Verify system alignments are within factory specifications. Inverter: Record input/output voltages and currents. Verify proper operation of inverter. Verify system alignments are within factory specifications. Verify DC currents on output of each inverter power stage. Static Switch: Record Inverter input voltage and currents to Static Switch. Record Bypass input voltage and currents to Static Switch. Record Static Switch output voltages and currents. Verify proper operation of the static switch. Verify system alignments are within factory specifications. Power Supplies: Verify proper output voltage of each internal power supply. Check for proper filtering of power supply output voltage. Confirm power supply redundancy if applicable. General: Check for proper fan operation. Inspect general overall condition of battery plant. Confirm acceptable environmental conditions exist for applicable parts coverage. Not all items are applicable to all systems. System functional tests: perform a full functional test of the UPS, including transferring the load from utility power to battery power and back to utility power to stimulate a power outage. Verify functionality of all system alarms, indicators, and communication interfaces. Calibrate the system as necessary to ensure all operational readings are within acceptable tolerances. The contractor will provide annual battery maintenance to be scheduled at the convenience of the Government. Battery maintenance includes but is not limited to the following: Review Customer battery maintenance logs and make entries into customer logs. Perform semi-annual preventive maintenance inspection as follows: Measure and record the voltage of each individual battery cell. Measure and record total voltage per cabinet / rack Measure and record ambient room temperature and humidity of the operating environment. Conduct an impedance test on each battery to assess its internal condition and ability to hold a charge. Perform a load test to verify the battery system can support the critical load for the specified runtime. Measure and record AC ripple current. Measure and record AC milli-volt per unit. Visual inspection: Check jar and cover for signs of leakage. Check for corrosion on terminal post or connector. Check for general appearance and cleanliness of battery room. Clean all battery terminals and posts. Apply protective coating to all terminals to prevent corrosion. Re-torque all battery connections to manufacturer specifications. The contractor shall provide a detailed report and quotation for the replacement of any battery that fails testing or shows signs of impending failure. Warning/hazard labels. Operational information and placards. Eye wash and deluge shower (if applicable). Goggles, gloves and aprons (if applicable). The contractor shall contain, collect, and dispose of hazardous and non-hazardous wastes and residues generated as a result of this contract, and dispose of all wastes off Fort Indiantown Gap, PA at disposal sites authorized by federal, state, and local laws and regulations for no additional cost. Contractor shall conduct any sampling necessary to properly characterize any waste prior to disposal and shall properly document all such waste determinations. Work shall be performed in accordance with all federal, state, and local laws and regulations. The contractor shall take responsibility for the cleanup for spills that may occur from their supplies or equipment during the operation, at no cost to the Government. The contractor will provide, in writing, to the POC the following information 15 days prior to the execution of this contract: Local Contractor POC Details. Name and location of the contractor. POC and contact information of the contractor. Hours of operation of the contractor. Government Responsibilities. The government will provide POC information, in writing, to the contractor with the following information 15 days prior to the execution of this contract: Name and location of the Government POC.

From Combined Synopsis/Solicitation posted on Apr 06, 2026

This is a blanket purchase agreement. The period of performance is 1 May 2026 through 30 April 2031. General: This is a service contract to provide all necessary support to perform UPS service, maintenance, repairs and replacement/upgrade of outdated parts or equipment for the MTC FTIG. The contractor shall provide 24/7/365 emergency repair services to address any unscheduled system failures. The contractor shall provide a telephone response from a qualified technician within four (4) hours of receiving an emergency service call. If the issue cannot be resolved remotely, the contractor shall have a technician on-site within twenty-four (24) hours. The contractor shall diagnose the system failure and provide the cost estimated to restore the UPS to full operational status. This includes all necessary labor and the replacement of failed parts. The contractor shall respond to requests for corrective maintenance within 8 hours from the time the customer requests that service. The contractor shall diagnose the system failure and provide the cost estimated to restore the UPS to full operational status. This includes all necessary labor and the replacement of failed parts. The contractor is to furnish a detailed report to the COR in PDF format no later than 1 week after performing service. Any issues or deficiencies found during performance are to be immediately reported to the COR with proposed corrective action. The contractor shall provide two preventative maintenance services annually to be scheduled at the convenience of the Government. Preventative maintenance includes but is not limited to the following: Visual Inspection: inspect the UPS and battery cabinets for any signs of damage, overheating, fluid leakage, or loose connections. Verify that all air inlets and outlets are clean and free of obstructions to ensure proper ventilation. Check for and clean any accumulation of dust or debris on internal and external components. Mechanical and electrical checks: check all electrical connections, including internal wiring, breakers, and terminal blocks, to manufacturer-recommended specifications. Verify the integrity and functionality of all system components, including circuit breakers, fuses, and capacitors. Measure and record all critical AC and DC operational parameters (input/output voltage and current, frequency, battery voltage, and charge current). Rectifier: Record input/output voltages and currents. Verify proper float and equalize settings for installed battery plant. Verify tolerance on the filtered DC bus. Verify system alignments are within factory specifications. Inverter: Record input/output voltages and currents. Verify proper operation of inverter. Verify system alignments are within factory specifications. Verify DC currents on output of each inverter power stage. Static Switch: Record Inverter input voltage and currents to Static Switch. Record Bypass input voltage and currents to Static Switch. Record Static Switch output voltages and currents. Verify proper operation of the static switch. Verify system alignments are within factory specifications. Power Supplies: Verify proper output voltage of each internal power supply. Check for proper filtering of power supply output voltage. Confirm power supply redundancy if applicable. General: Check for proper fan operation. Inspect general overall condition of battery plant. Confirm acceptable environmental conditions exist for applicable parts coverage. Not all items are applicable to all systems. System functional tests: perform a full functional test of the UPS, including transferring the load from utility power to battery power and back to utility power to stimulate a power outage. Verify functionality of all system alarms, indicators, and communication interfaces. Calibrate the system as necessary to ensure all operational readings are within acceptable tolerances. The contractor will provide annual battery maintenance to be scheduled at the convenience of the Government. Battery maintenance includes but is not limited to the following: Review Customer battery maintenance logs and make entries into customer logs. Perform semi-annual preventive maintenance inspection as follows: Measure and record the voltage of each individual battery cell. Measure and record total voltage per cabinet / rack Measure and record ambient room temperature and humidity of the operating environment. Conduct an impedance test on each battery to assess its internal condition and ability to hold a charge. Perform a load test to verify the battery system can support the critical load for the specified runtime. Measure and record AC ripple current. Measure and record AC milli-volt per unit. Visual inspection: Check jar and cover for signs of leakage. Check for corrosion on terminal post or connector. Check for general appearance and cleanliness of battery room. Clean all battery terminals and posts. Apply protective coating to all terminals to prevent corrosion. Re-torque all battery connections to manufacturer specifications. The contractor shall provide a detailed report and quotation for the replacement of any battery that fails testing or shows signs of impending failure. Warning/hazard labels. Operational information and placards. Eye wash and deluge shower (if applicable). Goggles, gloves and aprons (if applicable). The contractor shall contain, collect, and dispose of hazardous and non-hazardous wastes and residues generated as a result of this contract, and dispose of all wastes off Fort Indiantown Gap, PA at disposal sites authorized by federal, state, and local laws and regulations for no additional cost. Contractor shall conduct any sampling necessary to properly characterize any waste prior to disposal and shall properly document all such waste determinations. Work shall be performed in accordance with all federal, state, and local laws and regulations. The contractor shall take responsibility for the cleanup for spills that may occur from their supplies or equipment during the operation, at no cost to the Government. The contractor will provide, in writing, to the POC the following information 15 days prior to the execution of this contract: Local Contractor POC Details. Name and location of the contractor. POC and contact information of the contractor. Hours of operation of the contractor. Government Responsibilities. The government will provide POC information, in writing, to the contractor with the following information 15 days prior to the execution of this contract: Name and location of the Government POC.

From Combined Synopsis/Solicitation posted on Apr 20, 2026

Notice history

2
  1. Combined Synopsis/Solicitation Posted Apr 06, 2026 View
  2. Combined Synopsis/Solicitation LATEST Posted Apr 20, 2026
    • Response Deadline: Apr 20, 2026Apr 23, 2026

Details

Solicitation number W912KC26RA004
Notice ID 5c517562b57247d98bc1a584ce0918bb
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) J061
NAICS 518210
Place of performance Annville, Pennsylvania
Archive date May 08, 2026

Award Information

Not yet awarded

Contacts

primary
Michael Hancock

Email

Phone

secondary
John M O'Boyle

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
JFHQ USPFO PA
USPFO PA PROCUREMENT
W7NX USPFO ACTIVITY PA ARNG

Place of Performance

Annville, Pennsylvania 17003
USA

Dates

Posted Apr 20, 2026 3 months ago
Last Updated Aug 06, 2026 1 day ago
Due Apr 23, 2026 3 months ago