Uninterruptable Power Supply (UPS) - 140th Wing - COANG W50S6V25Q0012
Summary
AI-generated · Aug 24, 2025A 30KVA Uninterruptible Power Supply (UPS) must be furnished and installed in an interior room that is not accessible from the outside and is not environmentally controlled. An existing UPS location with installed infrastructure and circuit breakers is in place; the contractor will provide all necessary equipment, labor, and materials to perform the general and electrical work for the project. Quotes must follow the attached format, and a mandatory site visit is required (the initial notice listed 23 July 2025; updated notices place the site visit on 24 July 2025 at 0900 MDT). Base access forms must be submitted by the specified deadline, which was 14 July 2025 in the first notice and updated to 18 July 2025 in later notices.
Changes across notices include the site-visit date being updated from 23 July to 24 July 2025, and base-access form deadlines shifting from 14 July to 18 July 2025. Additional “Updated CAO” notes appeared on later notices (CAO dated 31 July 2025 and 5 August 2025), signaling updated administrative details while the core project requirements remain the same.
The Colorado Air National Guard (COANG) requires a 30KVA Uninterrupted Power Supply (UPS). The UPS is to be in an interior room that is not accessible from the outside and is not environmentally controlled. (Currently, there is a UPS located in this location with installed infrastructure and circuit breakers). The vendor who is awarded the contract is to provide all necessary equipment, labor, and materials as required to perform the general and electrical phases of this project. All quotes must be provided in the manner and format outlined in the attached combined synopsis/solicitation. Failure to do so will render your quote nonresponsive. There will be a site visit held on 23 July 2025 @ 0900 MDT. Base access forms must be received by 14 July 2025 @ 1200 MDT.
From Combined Synopsis/Solicitation posted on Jul 08, 2025The Colorado Air National Guard (COANG) requires a 30KVA Uninterrupted Power Supply (UPS). The UPS is to be in an interior room that is not accessible from the outside and is not environmentally controlled. (Currently, there is a UPS located in this location with installed infrastructure and circuit breakers). The vendor who is awarded the contract is to provide all necessary equipment, labor, and materials as required to perform the general and electrical phases of this project. All quotes must be provided in the manner and format outlined in the attached combined synopsis/solicitation. Failure to do so will render your quote nonresponsive. Updated*** There will be a site visit held on 24 July 2025 @ 0900 MDT. Base access forms must be received by 18 July 2025 @ 1200 MDT.
From Combined Synopsis/Solicitation posted on Jul 17, 2025The Colorado Air National Guard (COANG) requires a 30KVA Uninterrupted Power Supply (UPS). The UPS is to be in an interior room that is not accessible from the outside and is not environmentally controlled. (Currently, there is a UPS located in this location with installed infrastructure and circuit breakers). The vendor who is awarded the contract is to provide all necessary equipment, labor, and materials as required to perform the general and electrical phases of this project. All quotes must be provided in the manner and format outlined in the attached combined synopsis/solicitation. Failure to do so will render your quote nonresponsive. Updated CAO 31 July 2025*** There will be a site visit held on 24 July 2025 @ 0900 MDT. Base access forms must be received by 18 July 2025 @ 1200 MDT.
From Combined Synopsis/Solicitation posted on Jul 31, 2025The Colorado Air National Guard (COANG) requires a 30KVA Uninterrupted Power Supply (UPS). The UPS is to be in an interior room that is not accessible from the outside and is not environmentally controlled. (Currently, there is a UPS located in this location with installed infrastructure and circuit breakers). The vendor who is awarded the contract is to provide all necessary equipment, labor, and materials as required to perform the general and electrical phases of this project. All quotes must be provided in the manner and format outlined in the attached combined synopsis/solicitation. Failure to do so will render your quote nonresponsive. Updated CAO 5 August 2025*** There will be a site visit held on 24 July 2025 @ 0900 MDT. Base access forms must be received by 18 July 2025 @ 1200 MDT.
From Combined Synopsis/Solicitation posted on Aug 05, 2025Notice history
4-
Combined Synopsis/Solicitation Posted Jul 08, 2025
-
Combined Synopsis/Solicitation Posted Jul 17, 2025View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation Posted Jul 31, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 04, 2025 → Aug 07, 2025
-
Combined Synopsis/Solicitation LATEST Posted Aug 05, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 07, 2025 → Aug 14, 2025