Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 3 notices 3 documents

Amendment 2 to Solicitation for Ultra-High Vacuum Sample Backout Chamber Extension of Time 1333ND26QNB030068

Solicitation 1333ND26QNB030068 Copied Notice ID 8b21caab1f9c46bfae4243b4f64c40da Copied COMMERCE, DEPARTMENT OF — DEPT OF COMMERCE NIST
SAM.gov
Posted
Feb 23, 2026
Deadline
Mar 04, 2026
Set-aside
SBA
NAICS
334516
PSC
6640

Summary

AI-generated · Feb 13, 2026

Ultra-High Vacuum Sample Backout Chamber is being procured; full scope, technical requirements, and contractual terms are defined in the attached Combined Synopsis/Solicitation, Statement of Work, and applicable clauses and provisions.

Review those attachments for the complete requirements and any procurement-specific terms.

As defined in the attached Combined Synopsis Solicitation, Statement of Work and applicable Clauses and Provisions.

From Combined Synopsis/Solicitation posted on Feb 12, 2026

AMENDMENT TO SOLICITATION FOR VENDOR QUESTIONS Solicitation 1333ND26QNB030068 Ultra High Vacuum Sample Backout Chamber Vendor Question 1: To accurately provide a quote for the chamber and frame, I would need a drawing, STEP file, and/or sketch, as a written description alone is not sufficient for an accurate quote. NIST Response: There are many ways to design and assemble a system with the capabilities that we are requesting. We have not provided a technical drawing to allow the vendor the flexibility to design a system to meet our specifications as they see fit. We will evaluate on conformance to specifications, not a particular design. Vendor Question 2: Regarding Technical Specification b. Partial pressure for masses >44 AMU: <5e-11 Torr : How is this intended to be controlled / measured with a base pressure of 1e-8 Torr. NIST Response: We will verify the stated specification with an RGA unit in our lab. Ultimately, this specification is to ensure that the UHV system is not contaminated with higher amu contaminants. The overall pressure is allowed to be 1e-8 Torr due to lower amu components (e.g. water) that we can more readily get rid of with a bake-out. We are not equipped to do the requisite UHV cleaning for higher mass contaminants (silicones, oils, etc.) so this requirement ensures the vendor provides us with a UHV-clean system. Vendor Question 3: Will a cylindrical chamber work rather than a cube or a sphere, so long as the volume requirements are met and there are enough ports? NIST Response: A cylindrical chamber with the same 12 opening dimensions would also suffice. Vendor Question 4: What is the geometry of the sample types to be going into the chamber? Is it like a wafer? NIST Response: We will be using this chamber on a variety of sample sizes and shapes. As defined in the attached Combined Synopsis Solicitation, Statement of Work and applicable Clauses and Provisions.

From Combined Synopsis/Solicitation posted on Feb 18, 2026

AMENDMENT 2: Extension of time 1 week from February 25,2026 to new date for responses March 4,2026. AMENDMENT TO SOLICITATION FOR VENDOR QUESTIONS Solicitation 1333ND26QNB030068 Ultra High Vacuum Sample Backout Chamber Vendor Question 1: To accurately provide a quote for the chamber and frame, I would need a drawing, STEP file, and/or sketch, as a written description alone is not sufficient for an accurate quote. NIST Response: There are many ways to design and assemble a system with the capabilities that we are requesting. We have not provided a technical drawing to allow the vendor the flexibility to design a system to meet our specifications as they see fit. We will evaluate on conformance to specifications, not a particular design. Vendor Question 2: Regarding Technical Specification b. Partial pressure for masses >44 AMU: <5e-11 Torr : How is this intended to be controlled / measured with a base pressure of 1e-8 Torr. NIST Response: We will verify the stated specification with an RGA unit in our lab. Ultimately, this specification is to ensure that the UHV system is not contaminated with higher amu contaminants. The overall pressure is allowed to be 1e-8 Torr due to lower amu components (e.g. water) that we can more readily get rid of with a bake-out. We are not equipped to do the requisite UHV cleaning for higher mass contaminants (silicones, oils, etc.) so this requirement ensures the vendor provides us with a UHV-clean system. Vendor Question 3: Will a cylindrical chamber work rather than a cube or a sphere, so long as the volume requirements are met and there are enough ports? NIST Response: A cylindrical chamber with the same 12 opening dimensions would also suffice. Vendor Question 4: What is the geometry of the sample types to be going into the chamber? Is it like a wafer? NIST Response: We will be using this chamber on a variety of sample sizes and shapes. As defined in the attached Combined Synopsis Solicitation, Statement of Work and applicable Clauses and Provisions.

From Combined Synopsis/Solicitation posted on Feb 23, 2026

Notice history

3
  1. Combined Synopsis/Solicitation Posted Feb 12, 2026 View
  2. Combined Synopsis/Solicitation Posted Feb 18, 2026
    • Title: Ultra-High Vacuum Sample Backout ChamberAmendment to Solicitation for Ultra-High Vacuum Sample Backout Chamber
    • Description: Description was updated
  3. Combined Synopsis/Solicitation LATEST Posted Feb 23, 2026
    • Title: Amendment to Solicitation for Ultra-High Vacuum Sample Backout ChamberAmendment 2 to Solicitation for Ultra-High Vacuum Sample Backout Chamber Extension of Time
    • Description: Description was updated
    • Response Deadline: Feb 25, 2026Mar 04, 2026

Details

Solicitation number 1333ND26QNB030068
Notice ID 8b21caab1f9c46bfae4243b4f64c40da
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 6640
NAICS 334516
Place of performance Boulder, Colorado
Archive date Mar 19, 2026

Award Information

Not yet awarded

Contacts

primary
Elizabeth Timberlake

Email

secondary
Tracy Retterer

Email

Agency

COMMERCE, DEPARTMENT OF
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
DEPT OF COMMERCE NIST

Place of Performance

Boulder, Colorado 80305
USA

Dates

Posted Feb 23, 2026 5 months ago
Last Updated Aug 06, 2026 1 day ago
Due Mar 04, 2026 5 months ago