AI-generated · Sep 17, 2025Widen and reconstruct 0.71 miles of CR203 (Fish Hatchery Road) to provide northern access to the Uvalde National Fish Hatchery and eight adjacent private properties. The road will be widened from 15 feet to 24 feet on one side, using the existing roadway for project phasing, with a level terrain. Work includes embankment and aggregate base, asphalt paving, grading of ditches, culverts, signing, and striping. The project is planned in two phases: Phase 1 widens the west half with embankment and aggregate construction; Phase 2 shifts traffic onto the west-side base while full-depth reclamation embankment and remaining aggregate work are completed, followed by paving.
Principal quantities include embankment 1,300 cubic yards; roadway aggregate 3,800 tons; asphalt pavement 2,000 tons; culverts consisting of one 36-inch diameter pipe (45 linear feet) and one 24-inch diameter pipe (45 linear feet) with flared end sections. This is a presolicitation; plans and specifications are not available. Estimated cost range is $700,000 to $2,000,000.
THIS IS NOT A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER: TX FLAP UV CR203(1) PROJECT NAME: Fish Hatchery Road PROJECT DESCRIPTION: Widening and reconstruction of 0.71 miles of CR203 (Fish Hatchery Road) for access to the US Fish and Wildlife Service (USFWS) Uvalde National Fish Hatchery, in Uvalde, Texas, beginning at the intersection of US 90 and ending at the Fish Hatchery gate. The project terrain is level. There are no optional schedules or optional project termini. SCOPE OF THE WORK: The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while Full Depth Reclamation embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required. PRINCIPAL WORK ITEMS: Embankment Construction: 1,300 CY Roadway aggregate: 3,800 Tons Asphalt Pavement: 2,000 Tons Culverts: One 36 diameter pipe (45 LF), one 24 diameter pipe (45 LF), and flared end sections for both ANTICIPATED SCHEDULE: Advertisement: October 2025 Award: November-December 2025 Construction: Jan 2026 thru April 2026 ESTIMATED COST RANGE: $700,000.00 to $2,000,000.00.
From Presolicitation posted on Sep 15, 2025TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.
From Solicitation posted on Oct 21, 2025TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.
From Solicitation posted on Oct 22, 2025TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.
From Solicitation posted on Oct 23, 2025TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.
From Solicitation posted on Oct 29, 2025TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.
From Solicitation posted on Nov 10, 2025TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.
From Solicitation posted on Nov 12, 2025TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.
From Solicitation posted on Nov 13, 2025TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.
From Solicitation posted on Dec 22, 2025Notice history
9-
-
Solicitation Posted Oct 21, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Not set → Nov 13, 2025
-
Solicitation Posted Oct 22, 2025No changes from previous notice
-
Solicitation Posted Oct 23, 2025No changes from previous notice
-
Solicitation Posted Oct 29, 2025No changes from previous notice
-
Solicitation Posted Nov 10, 2025No changes from previous notice
-
Solicitation Posted Nov 12, 2025No changes from previous notice
-
Solicitation Posted Nov 13, 2025No changes from previous notice
-
Solicitation LATEST Posted Dec 22, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA