TX FLAP UV CR203(1) Fish Hatchery Road 6982AF25B000022

Solicitation 6982AF25B000022 Copied Notice ID 97ef7ba1fdc04d999157e9b3b1dc43cf Copied TRANSPORTATION, DEPARTMENT OF — 6982AF CENTRAL FEDERAL LANDS DIVISI
SAM.gov
Posted
Dec 22, 2025
Deadline
Nov 13, 2025
Set-aside
SBA
NAICS
237310
PSC
Y1LB

Summary

AI-generated · Sep 17, 2025

Widen and reconstruct 0.71 miles of CR203 (Fish Hatchery Road) to provide northern access to the Uvalde National Fish Hatchery and eight adjacent private properties. The road will be widened from 15 feet to 24 feet on one side, using the existing roadway for project phasing, with a level terrain. Work includes embankment and aggregate base, asphalt paving, grading of ditches, culverts, signing, and striping. The project is planned in two phases: Phase 1 widens the west half with embankment and aggregate construction; Phase 2 shifts traffic onto the west-side base while full-depth reclamation embankment and remaining aggregate work are completed, followed by paving.

Principal quantities include embankment 1,300 cubic yards; roadway aggregate 3,800 tons; asphalt pavement 2,000 tons; culverts consisting of one 36-inch diameter pipe (45 linear feet) and one 24-inch diameter pipe (45 linear feet) with flared end sections. This is a presolicitation; plans and specifications are not available. Estimated cost range is $700,000 to $2,000,000.

THIS IS NOT A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER: TX FLAP UV CR203(1) PROJECT NAME: Fish Hatchery Road PROJECT DESCRIPTION: Widening and reconstruction of 0.71 miles of CR203 (Fish Hatchery Road) for access to the US Fish and Wildlife Service (USFWS) Uvalde National Fish Hatchery, in Uvalde, Texas, beginning at the intersection of US 90 and ending at the Fish Hatchery gate. The project terrain is level. There are no optional schedules or optional project termini. SCOPE OF THE WORK: The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while Full Depth Reclamation embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required. PRINCIPAL WORK ITEMS: Embankment Construction: 1,300 CY Roadway aggregate: 3,800 Tons Asphalt Pavement: 2,000 Tons Culverts: One 36 diameter pipe (45 LF), one 24 diameter pipe (45 LF), and flared end sections for both ANTICIPATED SCHEDULE: Advertisement: October 2025 Award: November-December 2025 Construction: Jan 2026 thru April 2026 ESTIMATED COST RANGE: $700,000.00 to $2,000,000.00.

From Presolicitation posted on Sep 15, 2025

TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.

From Solicitation posted on Oct 21, 2025

TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.

From Solicitation posted on Oct 22, 2025

TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.

From Solicitation posted on Oct 23, 2025

TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.

From Solicitation posted on Oct 29, 2025

TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.

From Solicitation posted on Nov 10, 2025

TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.

From Solicitation posted on Nov 12, 2025

TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.

From Solicitation posted on Nov 13, 2025

TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.

From Solicitation posted on Dec 22, 2025

Notice history

9
  1. Presolicitation Posted Sep 15, 2025 View
  2. Solicitation Posted Oct 21, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Not setNov 13, 2025
  3. Solicitation Posted Oct 22, 2025
    No changes from previous notice
  4. Solicitation Posted Oct 23, 2025
    No changes from previous notice
  5. Solicitation Posted Oct 29, 2025
    No changes from previous notice
  6. Solicitation Posted Nov 10, 2025
    No changes from previous notice
  7. Solicitation Posted Nov 12, 2025
    No changes from previous notice
  8. Solicitation Posted Nov 13, 2025
    No changes from previous notice
  9. Solicitation LATEST Posted Dec 22, 2025
    No changes from previous notice

Details

Solicitation number 6982AF25B000022
Notice ID 97ef7ba1fdc04d999157e9b3b1dc43cf
Notice type Solicitation
Product / Service (PSC) Y1LB
NAICS 237310
Place of performance Uvalde, Texas
Archive date Jan 13, 2026

Award Information

Not yet awarded

Contacts

primary
Eric Grosskreuz

Email

secondary
Leslie Karsten

Email

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL HIGHWAY ADMINISTRATION
6982AF CENTRAL FEDERAL LANDS DIVISI

Place of Performance

Uvalde, Texas
USA

Dates

Posted Dec 22, 2025 7 months ago
Last Updated Aug 06, 2026 1 day ago
Due Nov 13, 2025 8 months ago