Two new PT6A-60A Engines to support the King Air 3 1305M225Q0217
Summary
AI-generated · Aug 25, 2025Procure two PT6A-60A engines for the King Air 350/360 fleet and two PT6A-27 engines (overhauled with core exchanges) for the DHC-6 Twin Otter fleet, to support long-term fleet sustainability and align with the Aircraft Allocation Plan. This aims to ensure mission readiness and minimize aircraft downtime, protecting life and property through reliable, on-hand propulsion spares.
Engines must be supplied on a core-exchange basis, delivered within six months of award, and shipped to the NOAA Aircraft Operations Center in Lakeland, FL for on-site inventory storage to support scheduled and unscheduled maintenance. The besoin emphasizes newly overhauled condition, with 0 hours Time Since Overhaul specified for the PT6A-27 engines.
AOC requires the procurement of Two new PT6A-60A Engines to support the King Air 350/360 aircraft fleet, ensuring long-term fleet sustainability and alignment with the Aircraft Allocation Plan (AAP). AOC also requires the procurement of Two PT6A-27 Overhauled Engine with Core Exchanges to support the DHC-6 Twin Otter aircraft fleet, ensuring long-term fleet sustainability and alignment with the Aircraft Allocation Plan (AAP). Requirements NOAA's King Air aircraft support the FY25 Aircraft Allocation Plan (AAP), which has a direct impact on protecting life and property. At present, AOC does not have any spare PT6A-60A engine available in its inventory. To ensure mission continuity, fleet sustainability, and minimize the risk of aircraft downtime due to scheduled or unscheduled maintenance, AOC requires the procurement of at least two (2) overhauled PT6A-60A engines. Establishing engine availability is critical to preventing potential part shortages and delays that could impact NOAA s operational readiness. NOAA's Twin Otter aircraft support the FY25 Aircraft Allocation Plan (AAP), which has a direct impact on protecting life and property. To maintain operational readiness and ensure fleet sustainability, AOC requires two (2) additional overhauled PT6A-27 engines (0 TSO) through core exchange. This replenishment is essential to support both scheduled and unscheduled engine maintenance events. A lack of spare engines poses a significant risk to mission capability and may result in extended aircraft downtime, delaying critical NOAA operations. AOC requires a vendor capable of supplying two newly overhauled PT6A-60A and newly overhauled PT6A-27 engines (0 hours Time Since Overhaul) on a core exchange basis engines, with delivery required within six (6) months of contract award preferably as soon as practical. The engines will be shipped to AOC in Lakeland, FL, for on-site inventory storage to support scheduled and unscheduled maintenance. Delivery Date NOAA requires the engine to be delivered upon availability, no later than 6 months from contract award. Estimated award and purchase in FY25 Q3 or Q4.
From Combined Synopsis/Solicitation posted on Aug 22, 2025AOC requires the procurement of Two new PT6A-60A Engines to support the King Air 350/360 aircraft fleet, ensuring long-term fleet sustainability and alignment with the Aircraft Allocation Plan (AAP). AOC also requires the procurement of Two PT6A-27 Overhauled Engine with Core Exchanges to support the DHC-6 Twin Otter aircraft fleet, ensuring long-term fleet sustainability and alignment with the Aircraft Allocation Plan (AAP). Requirements NOAA's King Air aircraft support the FY25 Aircraft Allocation Plan (AAP), which has a direct impact on protecting life and property. At present, AOC does not have any spare PT6A-60A engine available in its inventory. To ensure mission continuity, fleet sustainability, and minimize the risk of aircraft downtime due to scheduled or unscheduled maintenance, AOC requires the procurement of at least two (2) overhauled PT6A-60A engines. Establishing engine availability is critical to preventing potential part shortages and delays that could impact NOAA s operational readiness. NOAA's Twin Otter aircraft support the FY25 Aircraft Allocation Plan (AAP), which has a direct impact on protecting life and property. To maintain operational readiness and ensure fleet sustainability, AOC requires two (2) additional overhauled PT6A-27 engines (0 TSO) through core exchange. This replenishment is essential to support both scheduled and unscheduled engine maintenance events. A lack of spare engines poses a significant risk to mission capability and may result in extended aircraft downtime, delaying critical NOAA operations. AOC requires a vendor capable of supplying two newly overhauled PT6A-60A and newly overhauled PT6A-27 engines (0 hours Time Since Overhaul) on a core exchange basis engines, with delivery required within six (6) months of contract award preferably as soon as practical. The engines will be shipped to AOC in Lakeland, FL, for on-site inventory storage to support scheduled and unscheduled maintenance. Delivery Date NOAA requires the engine to be delivered upon availability, no later than 6 months from contract award. Estimated award and purchase in FY25 Q3 or Q4.
From Combined Synopsis/Solicitation posted on Aug 25, 2025Notice history
2-
Combined Synopsis/Solicitation Posted Aug 22, 2025
-
Combined Synopsis/Solicitation LATEST Posted Aug 25, 2025View changes (1)
- Title: Two new PT6A-60A Engines to support the King Air 3 → 28--Two new PT6A-60A Engines to support the King Air 3
Details
Award Information
Not yet awarded
Contacts
Phone