Turbo HiPace 80 Neo DN63 C 401791
Summary
AI-generated · Aug 24, 2025Turbo HiPace 80 Neo DN63 C, power failure venting valve, MPT 200 PB, connection cable (RS 485), mains cable (115V AC, USA/J), HiScroll 12 Comfort Bundle, and a mains cable (115V AC, USA/J) are required by the Fusion Energy Division at Oak Ridge National Laboratory. Refer to Attachment C for the full specifications.
Two records contain identical solicitations; there are no changes in requirements or terms between notices.
Turbo HiPace 80 Neo DN63 C The Fusion Energy Division at Oak Ridge National Laboratory requires a Turbo HiPace 80 Neo DN63 C, Power failure venting valve, MPT 200 PB, Connection cable, RS 485, Mains cable, 115V AC, (USA/J), HiScroll 12 Comfort Bundle, and Mains cable, 115V AC (USA/J). Refer to Attachment C for specifications.
From Combined Synopsis/Solicitation posted on Aug 11, 2025Turbo HiPace 80 Neo DN63 C The Fusion Energy Division at Oak Ridge National Laboratory requires a Turbo HiPace 80 Neo DN63 C, Power failure venting valve, MPT 200 PB, Connection cable, RS 485, Mains cable, 115V AC, (USA/J), HiScroll 12 Comfort Bundle, and Mains cable, 115V AC (USA/J). Refer to Attachment C for specifications.
From Combined Synopsis/Solicitation posted on Aug 12, 2025Notice history
2-
Combined Synopsis/Solicitation Posted Aug 11, 2025
-
Combined Synopsis/Solicitation LATEST Posted Aug 12, 2025View changes (1)
- Response Deadline: Aug 20, 2025 → Aug 19, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA