Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 4 notices 11 documents

Tree Removal FA670325Q0023

Solicitation FA670325Q0023 Copied Notice ID ad428a9bffc54ed99d2a07d5684e5949 Copied DEPT OF DEFENSE — FA6703 94TH CONTRACTING FLIGHT PK
SAM.gov
Posted
Sep 09, 2025
Deadline
Sep 23, 2025
Set-aside
SBA
NAICS
561730
PSC
F014

Summary

AI-generated · Sep 10, 2025

Provide equipment and crew to cut down and remove trees at Dobbins ARB. Work includes stump and perimeter root removal by completely cutting and grinding all growth to a minimum of 8 inches below grade; stumps must be ground within 3 workdays of the tree removal date. Debris from trees and stump grinding shall be removed from the site and not allowed to accumulate, with complete removal at each location. Backfill with topsoil, compact, and match existing grades.

All trees/shrubbery to be removed must have identifiable markings (tape/ribbon/paint). The contractor shall supply an estimate in accordance with the marked areas.

The contractor shall provide equipment and crew to cut down and remove trees on Dobbins ARB. The estimate shall be supplied in accordance with the marked areas. Service shall include stump and perimeter roots removal by completely cutting and grinding all growth to a minimum of 8 inches below grade. Stumps shall begin to be ground within three (3) workdays of tree removal date. Trees and all stump-grinding debris shall not be allowed to accumulate and be completely removed from the base when tree removal work at each site is completed. The contractor shall backfill with topsoil, compact, and match existing grades. All trees/shrubbery to be removed shall have identifiable markings on them (tape/ribbon/paint).

From Combined Synopsis/Solicitation posted on Sep 09, 2025

The contractor shall provide equipment and crew to cut down and remove trees on Dobbins ARB. The estimate shall be supplied in accordance with the marked areas. Service shall include stump and perimeter roots removal by completely cutting and grinding all growth to a minimum of 8 inches below grade. Stumps shall begin to be ground within three (3) workdays of tree removal date. Trees and all stump-grinding debris shall not be allowed to accumulate and be completely removed from the base when tree removal work at each site is completed. The contractor shall backfill with topsoil, compact, and match existing grades. All trees/shrubbery to be removed shall have identifiable markings on them (tape/ribbon/paint).

From Combined Synopsis/Solicitation posted on Sep 10, 2025

The contractor shall provide equipment and crew to cut down and remove trees on Dobbins ARB. The estimate shall be supplied in accordance with the marked areas. Service shall include stump and perimeter roots removal by completely cutting and grinding all growth to a minimum of 8 inches below grade. Stumps shall begin to be ground within three (3) workdays of tree removal date. Trees and all stump-grinding debris shall not be allowed to accumulate and be completely removed from the base when tree removal work at each site is completed. The contractor shall backfill with topsoil, compact, and match existing grades. All trees/shrubbery to be removed shall have identifiable markings on them (tape/ribbon/paint).

From Combined Synopsis/Solicitation posted on Sep 22, 2025

The contractor shall provide equipment and crew to cut down and remove trees on Dobbins ARB. The estimate shall be supplied in accordance with the marked areas. Service shall include stump and perimeter roots removal by completely cutting and grinding all growth to a minimum of 8 inches below grade. Stumps shall begin to be ground within three (3) workdays of tree removal date. Trees and all stump-grinding debris shall not be allowed to accumulate and be completely removed from the base when tree removal work at each site is completed. The contractor shall backfill with topsoil, compact, and match existing grades. All trees/shrubbery to be removed shall have identifiable markings on them (tape/ribbon/paint).

From Combined Synopsis/Solicitation posted on Sep 23, 2025

Notice history

4
  1. Combined Synopsis/Solicitation Posted Sep 09, 2025
  2. Combined Synopsis/Solicitation Posted Sep 10, 2025
    No changes from previous notice
  3. Combined Synopsis/Solicitation Posted Sep 22, 2025
    • Response Deadline: Sep 23, 2025Sep 24, 2025
  4. Combined Synopsis/Solicitation LATEST Posted Sep 23, 2025
    No changes from previous notice

Details

Solicitation number FA670325Q0023
Notice ID ad428a9bffc54ed99d2a07d5684e5949
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) F014
NAICS 561730
Place of performance Marietta, Georgia
Archive date Oct 08, 2025

Award Information

Not yet awarded

Contacts

primary
Kevin Song

Email

Phone

secondary
Kenneth J. Jacob

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE RESERVE COMMAND
FA6703 94TH CONTRACTING FLIGHT PK

Place of Performance

Marietta, Georgia 30069
USA

Dates

Posted Sep 09, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 23, 2025 10 months ago