Transition Power Supply Installation IDIQ with the Radar Operations Center 1305M226Q0038
Summary
AI-generated · Jun 23, 2026A 5-year IDIQ contract for transition power supply installation covering Eaton 93PM UPS systems, maintenance bypass modules (MBMs), sidecars, and battery cabinets. Items include: (1) UPS with MBM and battery cabinet installed at sites listed in Table 3 of the SON, with installation travel costs included in the per-unit price; (2) UPS with MBM sidecar and battery cabinet with batteries installed at sites in Table 3, with installation travel costs included; and (3) UPS with sidecar w/MBM and battery cabinet without batteries, shipped to the National Logistics Support Center with no installation. Some configurations include batteries installed; others do not, and installation applies to the sites (travel costs must be built into pricing).
Proposals must include all documents listed in Sol_1305M226Q0038 (Volume I Technical Compliance, Volume II Installation Plan, Volume III Past Performance, Volume IV Price). Evaluation will use those volumes per Section M. Submissions failing to provide all required documents on time will be deemed non-responsive. The work is tied to the Radar Operations Center and requires adherence to the specified installation plans and documentation.
The Government is seeking a 5-year IDIQ for the following: Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed at sites specified in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed at the sites prescribed in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). and; Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center. (NO INSTALLATION) Vendors are responsible for providing all information and documentation listed in Section L- Instructions, Conditions, and Notices to Bidders of attachment Sol_1305M226Q0038, including Volume I: Technical Compliance, Volume II: Installation Plan, Volume Ill: Past Performance, and Volume 4: Price. Evaluation information for those volumnes are provided in Section M - Evaluation Factors for Award. Failure to provide ALL required documents on time will result in submissions being deemed non responsive.
From Solicitation posted on Jun 22, 2026The Government is seeking a 5-year IDIQ for the following: Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed at sites specified in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed at the sites prescribed in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). and; Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center. (NO INSTALLATION) Vendors are responsible for providing all information and documentation listed in Section L- Instructions, Conditions, and Notices to Bidders of attachment Sol_1305M226Q0038, including Volume I: Technical Compliance, Volume II: Installation Plan, Volume Ill: Past Performance, and Volume 4: Price. Evaluation information for those volumnes are provided in Section M - Evaluation Factors for Award. Failure to provide ALL required documents on time will result in submissions being deemed non responsive. Amendment 1: posted 7/1/26; includes questions submited during the inquiries period with their respective answers. Additionally, an Excel document is attached that is referenced in the Q&A document. Amendment 2: posted 7/6/26; no additional documents are included. This amendment only extends the response due date one week to 7/14/26 1:00pm ET.
From Solicitation posted on Jul 06, 2026The Government is seeking a 5-year IDIQ for the following: Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed at sites specified in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed at the sites prescribed in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). and; Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center. (NO INSTALLATION) Vendors are responsible for providing all information and documentation listed in Section L- Instructions, Conditions, and Notices to Bidders of attachment Sol_1305M226Q0038, including Volume I: Technical Compliance, Volume II: Installation Plan, Volume Ill: Past Performance, and Volume 4: Price. Evaluation information for those volumnes are provided in Section M - Evaluation Factors for Award. Failure to provide ALL required documents on time will result in submissions being deemed non responsive. Amendment 1: posted 7/1/26; includes questions submited during the inquiries period with their respective answers. Additionally, an Excel document is attached that is referenced in the Q&A document. Amendment 2: posted 7/6/26; no additional documents are included. This amendment only extends the response due date one week to 7/14/26 1:00pm ET. Amendment 3: posted 7/13/26; no additional documents are included. This amendment only extends the response due date one additional week to 7/21/26 1:00pm ET.
From Solicitation posted on Jul 13, 2026Notice history
3-
Solicitation Posted Jun 22, 2026
-
Solicitation Posted Jul 06, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jul 07, 2026 → Jul 14, 2026
-
Solicitation LATEST Posted Jul 13, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jul 14, 2026 → Jul 21, 2026
Details
Award Information
Not yet awarded
Documents
8Contacts
Phone
Phone
Agency
Place of Performance
USA