Trailer Pad/Housing Unit Improvements on the Kaibab National Forest in Northern AZ 127EAX26Q0017
Summary
AI-generated · May 23, 2026Trailer pad utility upgrades and housing/utility improvements for North Kaibab and Tusayan Ranger Districts focus on rehabilitating 11 RV pads (6 at Tanglefoot Work Center, 5 at Tusayan Ranger Station) to support on-site housing for firefighters and staff. Work includes clearing overgrown pads, subgrade preparation, new gravel with compaction, replacement of water and sewer connections (with limited water/sewer line work), and replacement of electrical components on existing service pedestals.
Optional scope adds rehabilitation of 13 additional pads (8 at Jacob Lake Work Center, 5 at Big Springs Work Center), plus subsurface utility locating, TV inspection and flow testing of the septic system, replacement of septic tank and leach field, and replacement or installation of propane lines for 24 pads, along with additional water and sewer line work. RFI responses are posted as an attachment, and bidders must acknowledge Amendment 0001 with their pricing package to submit a price quote.
*****UPDATE AS OF 5-22-2026 10:40AM MOUNTAIN TIME***** THE REQUEST FOR INFORMATION (RFI - QUESTIONS AND RESPONSES) IS POSTED AS AN ATTACHMENT. ANY CONTRACTOR WISHING TO SUBMIT A PRICE QUOTE MUST ACKNOWLEDGE THE AMENDEDMENT 0001 SOLICITATION WITH THEIR PRICING PACKAGE. TITLE OF NEWLY UPLOADED AMENDMENT DOCUMENT WITH RFI: "AMENDMENT_127EAX26Q0017_0001" ******************************************* Trailer pad utility upgrades and improvements for the North Kaibab and Tusayan Ranger Districts - Housing & Utility upgrades (on-site housing for firefighters and staff). This project will consist of the rehabilitation of eleven (11) RV camping pads, six (6) at the Tanglefoot Work Center and five (5) at Tusayan Ranger Station. Pad rehabilitation consists of clearing overgrown pads; subgrade preparation, new gravel placement and compaction for parking pads; replacement of water and sewer connections; limited replacement of water and sewer lines; and replacement of electrical components on existing electrical service pedestals. This project also includes optional work items for the rehabilitation of an additional thirteen (13) RV pads, eight (8) at Jacob Lake Work Center and five (5) at Big Springs Work Center; subsurface utility locating; television inspection and flow testing of an existing septic system; replacement of septic tank and leach field; replacement or installation of propane lines and connections for twenty-four (24) RV pads; and additional water and sewer line replacement.
From Combined Synopsis/Solicitation posted on May 22, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted May 22, 2026
Details
Award Information
Not yet awarded
Documents
8Contacts
Agency
Place of Performance
USA