Town of Cairo – Water System Improvements Project W911WN26B1AZ5
Summary
AI-generated · Dec 10, 2025Provide all labor, equipment, devices, and materials to upgrade the Town of Cairo’s water distribution system in Cairo, WV. Work includes installing new water mains, replacing service line meter settings, rehabilitating and installing pressure reducing valve stations, cleaning and rehabilitating an existing storage tank, valve and fire hydrant replacements, leak detection, meter installation, and an interconnection project (Silver Run, High Street, Smith Hill) all on existing easements or ones obtained for the project. Construction is planned to occur roughly in 2026, with disposal to a landfill, and the total project window spans about one year.
This is a sources sought for planning, not a solicitation, and no contract will be awarded from this notice. If the eventual procurement is set aside for small businesses, the contractor must comply with a 75% subcontracting limit to similarly situated entities. The anticipated project magnitude is between $1 million and $5 million, with an expected duration of 365 calendar days. Respondents should submit by 10:00 AM ET on December 23, 2025: (1) intent to bid as prime and how the 75% subcontracting requirement would be met, and how subcontractors would be selected; (2) a capability statement showing relevant experience, trades, and self-performed vs. in-house work; (3) bonding capacity; (4) evidence of SB/8(a)/HUBZone/WOSB/EDWOSB/SDVOSB certification. Submissions should be directed to the contracting office.
USACE Pittsburgh District (LRP) requests the response of all capable contractors interested in furnishing all labor, equipment, devices, and materials to perform all work necessary to perform Water System Improvements at Town of Cairo in Cairo, Ritchie County, WV. The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to upgrade the water distribution system in the Town of Cairo by installing new water lines, replacing water service meter setting, rehabilitation an existing pressure reducing valve station, installing a new pressure reducing valve station, and cleaning, inspecting, and rehabilitation and existing water storage tank. The major features of the Project generally involves the following: In-Town Water Line Replacement Service Line and Meter Setting Replacement Silver Run Water Line Replacement & Extension High Street Smith Hill Interconnection & Pressure Reducing Valve Installation Valve Replacements Fire Hydrant Replacement Leak Detection Meter Installation Pressure Reducing Valve Rehabilitation Tank Cleaning, Inspection, and Rehabilitation The work is to be performed on existing utility easements or easements that have been obtained for the project. Project physical construction is proposed to take place in the period between April 2026 and September 2026. This would allow the Contractor to perform all necessary work. Disposal of construction waste material will be disposed of at a landfill. Note: This is not a solicitation. This is a Sources Sought Notice (SSN) for planning purposes only. The information obtained from responses to this SSN may be used in the development of an acquisition strategy and future solicitation. No contract will be awarded based on the SSN nor any reimbursement made for information submitted. If this effort is set aside, FAR clause 52.219-14(e)(4), Limitations on Subcontracting, will apply. The contractor agrees that it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded. The solicitation will be conducted under NAICS code 237110 - Water and Sewer Line and Related Structures Construction with an associated small business size standard of $45,000,000.00 average annual revenue. The Magnitude of Construction is Between $1,000,000 and $5,000,000. The anticipated period of performance is 365 calendar days from Notice to Proceed. No set-aside determination has been made at this time. The contractor shall furnish all labor, equipment, devices, and materials and perform all work in accordance with the specifications. The contractor shall comply with all applicable federal, regional, state, and local laws and commercial standards. The above description of work is for general information only and is not intended to include or describe every feature of the work or to define the complete scope of the work. RESPONSE PROCEDURE To assist with planning, the GOV requests interested contractors submit the following by 10:00AM ET, 23 December 2025: (1) A positive statement of intent to submit a bid or proposal for this solicitation as a prime contractor. Include a description of how the 75 percent subcontracting requirement would be met. Describe how anticipated subcontractors, if any, would be selected and which functions they would be responsible for. (2) A capability statement. This must include: relevant construction experience, addressing projects of similar size, scope and complexity trades involved percent of work self-performed vs. in-house (3) Indicate your firm s bonding capacity. (4) Dated letter, certification, or registration in the appropriate program repository from the appropriate competent jurisdiction that evidences SB, 8(a), HUBZone, WOSB, EDWOSB, and/or SDVOSB participation and/or certification, such as an SBA certification letter or other evidence. (For more information on the definition or requirements, refer to http://www.sba.gov.). All the above must be submitted in sufficient detail for a decision to be made on the availability of interested SB, 8(a), HUBZone, WOSB, EDWOSB, or SDVOSB concerns. Failure to submit all the information requested may result in a contractor being considered not interested in this requirement. Firms that meet the requirements described in this announcement are invited to submit their documentation to the attention of Aaron Barr, Contract Specialist, at aaron.m.barr@usace.army.mil , and copy Leanna Lesefka, Contracting Officer, at leanna.c.lesefka@usace.army.mil.
From Sources Sought posted on Dec 09, 2025Notice history
1-
Sources Sought LATEST Posted Dec 09, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA