TOUCHDOWN 08 - REPLACEMENT W912ER26RA014
Summary
AI-generated · Jan 24, 2026Remove and replace 13,504 square meters of Portland Cement Concrete pavement at the Touchdown 08 end of Runway 08/26, including transitions, with modified-heavy load concrete pavement to support modified-heavy load aircraft landing operations. Extend the touchdown zone by replacing 13,354 square meters of asphalt pavement with PCC.
Also replace threshold lighting infrastructure and taxiway exit lighting within the concrete touchdown area; perform all necessary airfield markings in the touchdown zone; include work related to Aircraft Arresting System (AAS) absorber shelters. The work must comply with ICAO standards. It is a sources sought to gather industry input for preliminary planning; no proposals or solicitations are requested, and no contract will be awarded from this notice; no solicitation, specifications, or drawings are available at this time.
The U.S. Army Corps of Engineers (USACE), through its Middle East District (SWM), is evaluating the ability of businesses to perform a comprehensive pavement repair by removal of 13,504 Square Meters (SM) of Portland Cement Concrete (PCC) pavement, to include transitions, and replace with modified-heavy load concrete pavement on the Touchdown 08 end of Runway 08/26. Pavement will support modified-heavy load aircraft landing operations. Repair shall include concrete extension of the touchdown zone to meet current mission-assigned platform requirements by replacing 13,354 SM of asphaltic concrete pavement of runway with PCC. Additionally, repair by replacement of threshold lighting infrastructure and those taxiways exit lighting infrastructure that are within the concrete touchdown. Work will include all necessary airfield markings on the touchdown zone. In addition, the Contractor will be responsible for the work associated with the Aircraft Arresting System (AAS) Absorber Shelters. This project will comply with applicable International Civil Aviation Organization (ICAO) standards. *****This announcement seeks information from industry, which will be used for preliminary planning purposes. No proposals are being requested or accepted with this announcement. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SOURCES SOUGHT. NO SOLICITATION, SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME. ******
From Sources Sought posted on Jan 23, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone