Tonopah Office Restroom Floor Replacement 140L3925Q0058
Summary
AI-generated · Aug 23, 2025Replace both restrooms’ flooring in the Tonopah Office by removing and discarding existing vinyl wall base boards and linoleum floor coverings, and installing new materials. Remove and reinstall all fixtures in the restrooms as part of the scope.
Remove, discard, and replace existing vinyl wall base boards, and linoleum floor covers in both restrooms in the BLM Office. Remove and reinstall all fixtures.
From Solicitation posted on Jun 17, 2025Remove, discard, and replace existing vinyl wall base boards, and linoleum floor covers in both restrooms in the BLM Office. Remove and reinstall all fixtures.
From Award Notice posted on Aug 26, 2025Notice history
2-
Solicitation Posted Jun 17, 2025
-
Award Notice LATEST Posted Aug 26, 2025
Details
Award Information
Award Notices
Posted: Aug 26, 2025
Remove, discard, and replace existing vinyl wall base boards, and linoleum floor covers in both restrooms in the BLM Office. Remove and reinstall all fixtures.
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| M. Fitts Construction Co | G7BXDECRE8K5 | 9PQE2 | Riverside, CA |
Contacts
Phone