Contacts, documents and full notice history are available with a subscription.
Justification 1 notice

Third Generation Forward Looking Infrared (3GEN FLIR) Dewar Cooler Bench (DCB) W909MY22C0023_JA

Solicitation W909MY22C0023_JA Copied Notice ID ead99161fed5478898b1efad45676940 Copied DEPT OF DEFENSE — W6QK ACC-APG CONT CT WASH OFC
SAM.gov
Posted
May 01, 2026
Deadline
No deadline
Set-aside
None
NAICS
334511
PSC
1240

Summary

AI-generated · May 02, 2026

The DCB (Dewar Cooler Bench) requirement supports the Army’s 3GEN FLIR program (an ACAT II effort) to upgrade FLIR sensor technology and provide enhanced reconnaissance, surveillance, and target acquisition. FLIR is a passive infrared imaging method used for targeting and fire control in day, night, through smoke, and in degraded battlefield conditions. The 3GEN FLIR initiative aims for greater compatibility and commonality of components to deliver advanced thermal imaging while significantly reducing lifecycle costs, with the B-Kit Production and Deployment phase focused on ground-based platforms.

The contract structure is hybrid: firm-fixed-price (FFP) for DCB hardware production, plus cost-plus-fixed-fee (CPFF) or completion for technical and engineering work, testing, and logistics services.

The DCB requirement is necessary to support the U.S. Army s 3GEN FLIR program, an Acquisition Category (ACAT) II program, and improve the Army's existing FLIR sensor technology and provide enhanced capabilities for reconnaissance, surveillance and target acquisition. The Army approved the Improved the Improved FLIR (I-FLIR) Capability Development Document Update (CDD-U) Revision 1 on 149 December August 201822. FLIR is a passive imaging technology that senses infrared radiation and allows targeting and fire control operations during day or night, in the presence of smoke and in overall degraded battlefield conditions. The 3GEN FLIR seeks to maximize compatibility and commonality of components to deploy advanced thermal imaging capabilities to the Army and vastly reduce lifecycle costs. The 3GEN FLIR B-Kit Production and Deployment phase is focused on ground-based platforms. The contract is a hybrid FFP for DCB hardware production and CPFF/Completion for technical & engineering, test, and logistics services.

From Justification posted on May 01, 2026

Notice history

1
  1. Justification LATEST Posted May 01, 2026 View

Details

Solicitation number W909MY22C0023_JA
Notice ID ead99161fed5478898b1efad45676940
Award number W909MY22C0023
Notice type Justification
Product / Service (PSC) 1240
NAICS 334511
Place of performance Texas
Archive date May 31, 2026

Award Information

Awardees
0
Award Date
Apr 30, 2026

Documents

No files available

View on SAM.gov

Contacts

primary
Taylor Venanzi

Email

Phone

secondary
Alexis Williams

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
ACC-CTRS
ACC-APG
W6QK ACC-APG CONT CT WASH OFC

Place of Performance

Texas 75243
USA

Dates

Posted May 01, 2026 3 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Apr 30, 2026 3 months ago