TESSERACT Dilution Refrigerator BZ-2025-13
Summary
AI-generated · Aug 28, 2025Provide a dilution refrigeration system capable of supporting a highly sensitive low-temperature detector system (TESSERACT) that must operate at around 10 millikelvin while minimizing radioactive backgrounds. The design must be compatible with layered external shielding enclosures surrounding the detector and sensors, addressing the dual challenge of ultra-low temperature and radiation shielding.
The refrigerator must feature shielding cans with a narrow-neck geometry to allow the detector-containing lower section to extend into a pre-installed room-temperature shielding assembly, and it must include internal shielding materials. These shielding requirements will impose substantial static loads on the cold plate and mixing chamber. See the attached RFI for full details and response instructions.
Lawrence Berkeley National Laboratory (LBNL) is conducting market research to identify sources that possess the capabilities and experience necessary to provide a dilution refrigeration system for a low-temperature application. The TESSERACT project involves the development of a highly sensitive low-temperature detector system aimed at probing extremely rare physical events. To achieve the necessary performance, the system must operate at temperatures on the order of 10 mK while also minimizing radioactive backgrounds. This dual requirement presents a unique set of technical challenges for the dilution refrigerator design. Specifically, the detector target and sensors must be enclosed within layered shielding enclosures to suppress environmental radiation. To integrate with these enclosures, the refrigerator must be equipped with shielding cans that feature a narrow-necked geometry. This allows the lower section housing the detector to extend into a pre-installed room-temperature shielding assembly. Additionally, internal shielding materials must be incorporated into the refrigerator itself, resulting in substantial static loads on the cold plate and mixing chamber. Please see the attached RFI document for more detail and response instructions.
From Sources Sought posted on Aug 27, 2025Notice history
1-
Sources Sought LATEST Posted Aug 27, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA