TDA Auxiliary Water Supply Backup Debris Management PAN26P29505
Summary
AI-generated · Mar 09, 2026A market research Sources Sought is being conducted to assess industry interest, capabilities, and qualifications for a Design-Bid-Build construction project that will provide a predesigned mechanical method to dislodge debris from the trashracks at the EFL AWSB system intake. The goal is to enable automatic debris removal without requiring operations staff to shut down the AWSB system to let river currents clear accumulated debris; see attached files for full details.
Responses are invited from a broad range of firms, including small and large businesses and participants in programs such as 8(a), HUBZone, WOSB/EDWOSB, SDVOSB, and VOSB.
This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. The North American Industrial Classification Code (NAICS) for this requirement is: 237990, Other Heavy and Civil Engineering Construction. The related size standard is: $45.0 million. Formal Sources Sought Response Due before 10:00 am PDT on 16 March 2026. This project is a Design-Bid-Build construction requirement which will provide a predesigned mechanical method for dislodging debris from the trashracks at the EFL AWSB system intake. This will remove the need for operations staff to shut down the AWSB system to let river currents clear accumulated debris from the screens. See attached files for full details.
From Sources Sought posted on Mar 06, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA