Contacts, documents and full notice history are available with a subscription.
Solicitation HZC Expired 4 notices

Tate County, MS, MDHP, LD-21-01, FC/MR&T, Yazoo River Basin, Hickahala Senatobia Watershed W912EE25BA012

Solicitation W912EE25BA012 Copied Notice ID 1f98df9a48264fed8504e3aad96e7f7e Copied DEPT OF DEFENSE — W07V ENDIST VICKSBURG
SAM.gov
Posted
Jul 16, 2025
Deadline
Jul 31, 2025
Set-aside
HZC
NAICS
237990
PSC
Y1PZ

Summary

AI-generated · Aug 24, 2025

Construct a low drop grade control structure in Tate County, MS, within the Yazoo River Basin/Hickahala Senatobia Watershed. The work covers clearing and grubbing, excavation and fills (including spoil bank fill and backfill), demolition, water control, stone protection, sheet piling, erosion control, lime treatment, welding, stormwater pollution prevention, and environmental protection. Plans and specifications will be posted on SAM.gov; bid documents must be accessed there, and bidders should register on the Interested Vendors List (IVL). No CDs or hard copies are available, and bidders should monitor for amendments.

New information in the formal solicitations confirms the project is a HUBZone-certified small-business set-aside with an estimated construction value between $1,000,000 and $5,000,000. This is an explicit HUBZone total small business set-aside, updating the prior presolicitation notice which indicated a HUBZone set-aside and web-based posting, and reinforces that only HUBZone-certified small businesses may compete.

DESCRIPTION OF WORK: The work consists of constructing a low drop grade control structure. Principle features of the work include clearing and grubbing, excavation, fill, backfill, spoil bank fill, demolition, control of water, stone protection, sheet pile, erosion control, lime treatment, welding, storm water pollution prevention and environmental protection. Plans and specifications will be available on the Web Page at https://sam.gov/. Bidders may register on the Interested Vendor's List (IVL) at https://sam.gov and retrieve an IVL from the same location. Compact disc and hard copies will not be available. Bidders are encouraged to check often for changes (AMENDMENTS) to posted solicitations. This requirement will be set-aside for HUBZone Small Businesses.

From Presolicitation posted on Jul 16, 2025

TATE COUNTY, MS, MDHP, LD-21-01, FC/ MR&T, YAZOO RIVER BASIN, HICKAHALA SENATOBIA WATERSHED DESCRIPTION OF WORK: The work consists of constructing a low drop grade control structure. Principle features of the work include clearing and grubbing, excavation, fill, backfill, spoil bank fill, demolition, control of water, stone protection, sheet pile, erosion control, lime treatment, welding, storm water pollution prevention and environmental protection. PURSUANT TO FAR 36.204, THE MAGNITUDE OF THIS CONSTRUCTION PROJECT IS BETWEEN $1,000,000.00 AND $5,000,000.00. THIS IS A HUBZONE TOTAL SMALL BUSINESS SET-ASIDE.

From Solicitation posted on Jul 31, 2025

TATE COUNTY, MS, MDHP, LD-21-01, FC/ MR&T, YAZOO RIVER BASIN, HICKAHALA SENATOBIA WATERSHED DESCRIPTION OF WORK: The work consists of constructing a low drop grade control structure. Principle features of the work include clearing and grubbing, excavation, fill, backfill, spoil bank fill, demolition, control of water, stone protection, sheet pile, erosion control, lime treatment, welding, storm water pollution prevention and environmental protection. PURSUANT TO FAR 36.204, THE MAGNITUDE OF THIS CONSTRUCTION PROJECT IS BETWEEN $1,000,000.00 AND $5,000,000.00. THIS IS A HUBZONE TOTAL SMALL BUSINESS SET-ASIDE.

From Solicitation posted on Aug 01, 2025

TATE COUNTY, MS, MDHP, LD-21-01, FC/ MR&T, YAZOO RIVER BASIN, HICKAHALA SENATOBIA WATERSHED DESCRIPTION OF WORK: The work consists of constructing a low drop grade control structure. Principle features of the work include clearing and grubbing, excavation, fill, backfill, spoil bank fill, demolition, control of water, stone protection, sheet pile, erosion control, lime treatment, welding, storm water pollution prevention and environmental protection. PURSUANT TO FAR 36.204, THE MAGNITUDE OF THIS CONSTRUCTION PROJECT IS BETWEEN $1,000,000.00 AND $5,000,000.00. THIS IS A HUBZONE TOTAL SMALL BUSINESS SET-ASIDE.

From Solicitation posted on Sep 04, 2025

Notice history

4
  1. Presolicitation Posted Jul 16, 2025
  2. Solicitation Posted Jul 31, 2025
    • Title: Tate County, MS, MDHP, LD-21-01, FC/MR&T, Yazoo River Basin, Hickahala Senatobia WatershedTATE COUNTY, MS, MDHP, LD-21-01, FC/ MR&T, YAZOO RIVER BASIN, HICKAHALA SENATOBIA WATERSHED
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Jul 31, 2025Sep 03, 2025
  3. Solicitation Posted Aug 01, 2025
    No changes from previous notice
  4. Solicitation LATEST Posted Sep 04, 2025
    No changes from previous notice

Details

Solicitation number W912EE25BA012
Notice ID 1f98df9a48264fed8504e3aad96e7f7e
Notice type Presolicitation
Product / Service (PSC) Y1PZ
NAICS 237990
Set-aside HUBZone Set Aside
Place of performance Vicksburg, Mississippi
Archive date Aug 15, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Kasey Davis

Email

Phone

secondary
Robert Ellis Screws

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION MISSISSIPPI VALLEY
W07V ENDIST VICKSBURG

Place of Performance

Vicksburg, Mississippi 39183
USA

Dates

Posted Jul 16, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 31, 2025 1 year ago