TAB, TRIM, AIRCRAFT N0038325QH259
Summary
AI-generated · Aug 24, 2025Repairs/overhaul of aircraft-related items identified in the schedule are required. The contractor must repair/overhaul per the hard copy SOW, with a defined Repair Turnaround Time (RTAT) measured from the asset’s return to acceptance. Return is the physical receipt of the asset at the contractor’s facility, as reflected in the CAV system; all transactions must be reported by the end of the fifth regular business day after receipt, and the Action Date in CAV must reflect the actual receipt date. Final government inspection and acceptance must occur within the RTAT. The contract requires a throughput constraint for each NSN (monthly repair volume), with the option to indicate no throughput constraint; early and incremental deliveries are preferred.
Work must be performed under the SOW Rev Basic (dated 15 October 2018) and includes First Article Inspection requirements, packaging per MIL-STD 2073, and an Induction Expiration Date of 365 days after award (assets received after this date require bilateral agreement for repair). A reconciliation modification will be issued after final inspection and acceptance of all assets. Prices per unit are fixed on the schedule based on meeting the RTAT; failure to meet RTAT may lead to negotiated adjustments. The solicitation covers four scope items, all repair/overhaul per the specified SOW, and packaging and QA requirements apply as noted.
CONTACT INFORMATION|4|N722.30|B5F|771-229-0549|albert.j.russo17.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo) Type||DFAS|N00383|DCMA|DCMA|See Schedule|Source||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| This requirement is for the repair of the items herein thissolicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS)RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE ITEM WILL BE REPAIRED / OVERHAULED IN ACCORDANCE WITH HARD COPY STATEMENT OF WORK (SOW) REV BASIC, 15 OCTOBER 2018 CONTACT N231 THEOTIS WILLIAMS FOR HARD COPY SOW 2. APPLICABLE DOCUMENTS ITEM WILL BE REPAIRED / OVERHAULED IN ACCORDANCE WITH HARD COPY STATEMENT OF WORK (SOW) REV BASIC, 15 OCTOBER 2018 CONTACT N231 THEOTIS WILLIAMS FOR HARD COPY SOW 3. REQUIREMENTS ITEM WILL BE REPAIRED / OVERHAULED IN ACCORDANCE WITH HARD COPY STATEMENT OF WORK (SOW) REV BASIC, 15 OCTOBER 2018 CONTACT N231 THEOTIS WILLIAMS FOR HARD COPY SOW 4. QUALITY ASSURANCE SEE PARAGRAPH 5.0 IN STATEMENT OF WORK FOR FIRST ARTICLE INSPECTION REQUIREMENTS 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
From Solicitation posted on Jul 30, 2025Notice history
1Details
Award Information
Not yet awarded