Synopsis AGE Parking Pad. FA446125Q0154
Summary
AI-generated · Aug 24, 2025Design and construct a new PCC parking area and the associated stormwater drainage systems. Conceptual site plans indicate rough spaces and sizes, but the contractor must deliver a complete design that functions within existing spaces, accommodates limitations, and complies with code requirements defined in the SOW, developing both preliminary and final designs and construction details from current dimensions and field measurements.
Attachments and the SOW will be provided with the solicitation. The project magnitude is expected to be between $1,000,000 and $5,000,000. This posting does not obligate the Government or the contractor.
The work shall consist of designing and constructing a new PCC parking area and associated storm water drainage systems. The Conceptual Site Plan layouts indicated in the Attachments only conceptually define the spaces and approximate square footages required. The Contractor shall provide a COMPLETE design to function in existing spaces, limitations, & Code requirements additionally defined by this SoW. The Contractor shall develop preliminary & final designs, & details based off existing dimensions, field measurements, existing limitations, and design limitations. *Note: The attachments and Statement of Work (SOW) will be provided in the solicitation phase. 1. This Synopsis will close 12 July 2025 at 2:00 PM CST. 2. A solicitation will be posted on or around 14 July 2025. 3. In accordance with FAR 36.204(f), the disclosure of magnitude is between $1,000,000 and $5,000,000. 4. This post does not obligate the Government or Contractor in any way shape or form.
From Presolicitation posted on Jun 27, 2025Notice history
1-
Presolicitation LATEST Posted Jun 27, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
N/A
Phone
N/A
Agency
Place of Performance
USA