Swimming Pool & Splash Park Seasonal Maintenance FA4497-Swimming_Pool_Mx
Summary
AI-generated · Mar 09, 2026Provide all management, labor, tools, equipment, and supplies needed to open and close the swimming pool and splash park for the season. The government will supply CO2 and liquid chlorine; the contractor is responsible for startup water-balancing chemicals and all winterization chemicals for closure. A pre-opening site meeting must occur two weeks before opening with Base Safety, Bioenvironmental, WFSM, the FSS Pool Manager, the contractor, and the Contracting Officer Representative. Final opening approval will be given by the base Bioenvironmental section based on their independent water-quality testing of pH and chlorine residual.
Bioenvironmental will test seven days prior to opening to determine if any chemistry adjustments are necessary. Refer to the attached Performance Work Statement for detailed requirements. Respondents should indicate their current business size standard and small-business status, and provide applicable NAICS codes.
THIS IS A SOURCES SOUGHT ANNOUNCEMENT ONLY 436th Contracting Squadron is seeking information concerning the availability of small business concern contractors capable of providing the following services. Description of Services - The contractor shall provide all management, tools, supplies, equipment and labor necessary to open and close the swimming pool and splash park facility. The government will supply all CO2 and liquid chlorine and the contractor will supply all the startup water balancing chemicals to use for pool/splash park startup operations. Additionally, the contractor is responsible for providing all winterization chemicals for pool and splash park closure. A site meeting will need to be conducted two weeks prior to the opening day of the pool season to include Base Safety Office Representative, Base Public Health (Bioenvironmental), WFSM Representative, FSS Pool Manager, Contractor, and the CES Contracting Officer Representative. Final approval for opening of the pool for the season will be accomplished by the Dover AFB Bioenvironmental section through their own independent water quality testing for proper pH and chlorine residual. Bioenvironmental will need to conduct the water quality testing seven days prior to the season opening of the swimming pool facility and splash park in case water quality chemistry adjustments are necessary. Please see the attached Performance Work Statement (PWS) for a more in depth overview of the required services. Please provide current business size standard (e.g. Large or Small Business), Small business socioeconomic status (if applicable), and applicable NAICS codes. USE PDF VERSION OF PWS TITLED "Swimming Pool Mx PWS (DRAFT).pdf" TO ACCESS FILE.
From Sources Sought posted on Mar 05, 2026Notice history
1-
Sources Sought LATEST Posted Mar 05, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA