Summary
AI-generated · Sep 27, 2025A two-phase design-build Indefinite-Quantity Multiple-Award Task Order Contract (IDIQ MATOC) is planned to design and construct floodproofing for up to 371 structures as part of the Southwest Coastal Louisiana Nonstructural Storm Risk Management Project (SWCLA), with total shared capacity not to exceed $99 million.
Phase I is expected in Fall 2025, with no firm date yet. The selection will follow FAR 36.301 two-phase design-build procedures and applicable USACE design-build contracting regulations. This is a pre-solicitation; proposals submitted in response to this notice will not be reviewed. The current MATOC scope is smaller than a related prior MATOC, but a second, larger MATOC could be issued later if there is a bona fide need. An Industry Day may be held if feasible, and vendors must be logged into SAM.gov to receive updates. This notice references a related draft RFP notice W912EK25RA001 issued in April 2025.
The US Army Corps of Engineers (USACE) - Rock Island District intends to issue a two-phased solicitation for establishing a design-build construction Indefinite-Quantity Multiple-Award Task Order Contract (IDIQ MATOC) with a total shared capacity not to exceed $99M (million) to provide the design and construction of floodproofing for up to 371 individual structures as part of the Southwest Coastal Louisiana Nonstructural Storm Risk Management Project (SWCLA). Please note that the acquisition strategy has not changed since the related notice was issued. This source selection will be carried out in accordance with FAR 36.301 Use of two-phase design-build selection procedures , which can be found at www.acquisition.gov, and Engineering Regulation ER 1180-1-9 Design-Build Contracting which can be found at https://www.publications.usace.army.mil/USACE-Publications/Engineer-Regulations/udt_43546_param_orderby/Pub_x0020_Number/udt_43546_param_direction/descending/ USACE anticipates issuing Phase I in fall of 2025 but there is no set date at this time. This notice is related to the draft-RFP notice W912EK25RA001 that was issued in April 2025. While the scope of this planned MATOC is smaller, it is possible that USACE may issue a solicitation for a second larger MATOC should there be a bona fide need for it in the future. If USACE determines that an Industry Day is feasible within the solicitation schedule either this notice will be updated, or a related notice will be issued. Please be sure to Follow this notice, which requires vendors to be logged into their SAM.gov account, so as to be notified when this notice is updated, or a related notice is issued. This is a pre-solicitation notice only, and proposals submitted in response to this notice will NOT be reviewed or accepted.
From Presolicitation posted on Sep 17, 2025Updated 18-Nov-2025: This pre-solicitation is being cancelled. A new pre-solicitation will be published at least 15 days prior to a solicitation for subject requirement being issued in accordance with FAR 5.203 "Publicizing and response time" and FAR 36.213-2 "Presolicitation notices". The estimated solicitation date is unknown at this time. The US Army Corps of Engineers (USACE) - Rock Island District intends to issue a two-phased solicitation for establishing a design-build construction Indefinite-Quantity Multiple-Award Task Order Contract (IDIQ MATOC) with a total shared capacity not to exceed $99M (million) to provide the design and construction of floodproofing for up to 371 individual structures as part of the Southwest Coastal Louisiana Nonstructural Storm Risk Management Project (SWCLA). Please note that the acquisition strategy has not changed since the related notice was issued. This source selection will be carried out in accordance with FAR 36.301 Use of two-phase design-build selection procedures , which can be found at www.acquisition.gov, and Engineering Regulation ER 1180-1-9 Design-Build Contracting which can be found at https://www.publications.usace.army.mil/USACE-Publications/Engineer-Regulations/udt_43546_param_orderby/Pub_x0020_Number/udt_43546_param_direction/descending/ USACE anticipates issuing Phase I in fall of 2025 but there is no set date at this time. This notice is related to the draft-RFP notice W912EK25RA001 that was issued in April 2025. While the scope of this planned MATOC is smaller, it is possible that USACE may issue a solicitation for a second larger MATOC should there be a bona fide need for it in the future. If USACE determines that an Industry Day is feasible within the solicitation schedule either this notice will be updated, or a related notice will be issued. Please be sure to Follow this notice, which requires vendors to be logged into their SAM.gov account, so as to be notified when this notice is updated, or a related notice is issued. This is a pre-solicitation notice only, and proposals submitted in response to this notice will NOT be reviewed or accepted.
From Presolicitation posted on Nov 18, 2025Notice history
2-
Presolicitation Posted Sep 17, 2025
-
Presolicitation LATEST Posted Nov 18, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Oct 30, 2025 → Nov 30, 2025