Stratton ANGB - Replace RTU W50S8J25QA016
Summary
AI-generated · Aug 23, 2025Stratton ANGB requires replacing the rooftop unit (RTU). The latest amendment posts the site visit sign-in sheet and provides answers to questions raised during the visit. Bids must include both a price and a material submittal, and the full evaluation criteria and site visit details can be found on the referenced page of the solicitation; quotes should be submitted to the contracting office as directed in the solicitation.
Key clarifications from the Q&A indicate the base has previously worked with Energy Management Technologies, LLC and Johnson Controls for controls work; a BACnet card is not required because the system uses MSTP. A FAA permit is not needed for crane work, but crane location coordinates must be provided and cranes must be properly flagged.
The purpose of amendment 01 is to post the site visit sign in sheet and answer questions which were submitted as a result of the site visit. Email quotes directly to 109.AW.FAL.MSC.CONTRACTING@US.AF.MIL Note that contractor quotes must include both a price and a material submittal. See page 6 of the solicitation for complete evaluation as well as site visit details.
From Solicitation posted on Jun 18, 2025The purpose of this update is to provide the following questions and answers (Q&A) dated 30 June 2025: Question 1) I was wondering if you could share the contact information for your controls contractor? I was looking for the person who may be familiar with this project. Answer 1) In the past, the base has worked with both Energy Management Technologies, LLC and Johnson Controls. Question 2) Do we need to include a BACnet card in the unit or can the control company tie in directly? Answer 2) No, we do not need it. We havea MSTP. Question 3) I assume we will need an FAA permit for the crane? Answer 3) A permit is not necessary but we will need crane location coordinates and cranes will need to be properly flagged. - End Q&A dated 30 June 2025. The purpose of amendment 01 is to post the site visit sign in sheet and answer questions which were submitted as a result of the site visit. Email quotes directly to 109.AW.FAL.MSC.CONTRACTING@US.AF.MIL Note that contractor quotes must include both a price and a material submittal. See page 6 of the solicitation for complete evaluation as well as site visit details.
From Solicitation posted on Jun 30, 2025Notice history
2Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA