Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 2 notices 6 documents

Steel Tower with glass facade for an elevator 19AU9025Q0021

Solicitation 19AU9025Q0021 Copied Notice ID 5b40575a4f1045faa572084099f40ae8 Copied STATE, DEPARTMENT OF — US EMBASSY VIENNA
SAM.gov
Posted
Aug 22, 2025
Deadline
Sep 08, 2025
Set-aside
None
NAICS
238190
PSC
Z2FA

Summary

AI-generated · Aug 24, 2025

Design and install a steel tower with a glass façade outside a U.S. Government-owned building to house an elevator with a vestibule, enabling accessibility from the main entrance to two upper floors in accordance with ABA guidelines. The work includes producing workshop drawings and factory/assembly planning for a ~10 m tower over three floors, delivering and assembling the tower and façade, coordinating design with the general planner and elevator contractor, and coordinating on-site with all project participants. It also requires temporary outdoor dust walls and weather protection, scaffolds and lifting equipment, and commissioning with certificates for fire protection, safety glass, and building physics (thermal, sun, and sound protection).

Bidders must be SAM-registered before submitting an offer, and the project is estimated at $100,000 to $250,000. This record represents a shift from presolicitation to a formal solicitation, but the scope and requirements are essentially the same, with no new requirements announced.

This solicitation covers the design of a steel tower with glass faade outside of a U.S. Government-owned building for an elevator with vestibule for accessibility from the main entrance to 2 upper floors, to meet the ABA (American Architectural Barriers Act) requirements. The project involves - but is not limited to - the following : Workshop drawings, factory and assembly planning of a steel tower with glass faade for an elevator over 3 floors (height ca.10m), outside of the building, according to the American Architectural Barriers Act (ABA guidelines). Delivery and assembly of the steel tower with glass faade according to the American Architectural Barriers Act (ABA guidelines). Coordinated design with the general planner s design team and the elevator contractor: The elevator will be mounted inside the steel-glass tower over 3 floors. Coordinated cooperation on site with all project participants. Temporary massive dust wall outdoor (weather protection) protection measures and materials, scaffolds, lifting platforms, material lifts, etc. Commissioning and Certificates for fire protection, safety glass qualification, building physics (thermal qualification, sun protection, sound-protection) All contractors must be registered n the SAM (System Award Management) Database https://www.sam.gov prior to submitting an offer pursuant to FAR provision 52.204-7. Therefore, prospective offerors are encouraged to register prior to the submittal of quotations/proposals. Estimate size of the project: estimated construction cost per range according to FAR 36-204: between $ 100,000 and $ 250,000.

From Presolicitation posted on Jul 22, 2025

This solicitation covers the design of a steel tower with glass faade outside of a U.S. Government-owned building for an elevator with vestibule for accessibility from the main entrance to 2 upper floors, to meet the ABA (American Architectural Barriers Act) requirements. The project involves - but is not limited to - the following : Workshop drawings, factory and assembly planning of a steel tower with glass faade for an elevator over 3 floors (height ca.10m), outside of the building, according to the American Architectural Barriers Act (ABA guidelines). Delivery and assembly of the steel tower with glass faade according to the American Architectural Barriers Act (ABA guidelines). Coordinated design with the general planner s design team and the elevator contractor: The elevator will be mounted inside the steel-glass tower over 3 floors. Coordinated cooperation on site with all project participants. Temporary massive dust wall outdoor (weather protection) protection measures and materials, scaffolds, lifting platforms, material lifts, etc. Commissioning and Certificates for fire protection, safety glass qualification, building physics (thermal qualification, sun protection, sound-protection) All contractors must be registered n the SAM (System Award Management) Database https://www.sam.gov prior to submitting an offer pursuant to FAR provision 52.204-7. Therefore, prospective offerors are encouraged to register prior to the submittal of quotations/proposals. Estimate size of the project: estimated construction cost per range according to FAR 36-204: between $ 100,000 and $ 250,000.

From Solicitation posted on Aug 22, 2025

Notice history

2
  1. Presolicitation Posted Jul 22, 2025 View
  2. Solicitation LATEST Posted Aug 22, 2025
    • Title: Steel tower and glass facade for an elevatorSteel Tower with glass facade for an elevator
    • Notice Type: PresolicitationSolicitation

Details

Solicitation number 19AU9025Q0021
Notice ID 5b40575a4f1045faa572084099f40ae8
Notice type Solicitation
Product / Service (PSC) Z2FA
NAICS 238190
Place of performance Vienna, Wien
Archive date Sep 23, 2025

Award Information

Not yet awarded

Contacts

primary
Charles Collins

Email

secondary
Norbert Tritscher

Email

Agency

STATE, DEPARTMENT OF
STATE, DEPARTMENT OF
US EMBASSY VIENNA

Place of Performance

Vienna, Wien
AUT

Dates

Posted Aug 22, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 08, 2025 10 months ago