Steel Material for Fabrication of Miter Gate Anchorages W912ES25QA039

Solicitation W912ES25QA039 Copied Notice ID 7f52f4f0cb3d484da786956dfa5b079f Copied DEPT OF DEFENSE — W07V ENDIST ST PAUL
SAM.gov
Posted
Jul 25, 2025
Deadline
Jul 28, 2025
Set-aside
NONE
NAICS
331110
PSC
9515

Summary

AI-generated · Aug 25, 2025

Provide three ASTM A709 HPS 70WF steel plates, each 4 inches thick and 8 by 20 feet, cut into three equal pieces approximately 80" x 96" for delivery to US Army Corps of Engineers Service Base, Pleasant Valley, IA. Intended for miter gate anchorage components for Locks 5, 6, and 9 on the upper Mississippi River. Compliance includes Buy American Act and DFARS 252.225-7030; per-piece sampling options vary by notice (one allows a 4" x 4" coupon from any corner, another specifies sampling from each piece with coupon locations identified in an attached PDF). Required tests and markings include tensile and hardness per ASTM A709 Table 1 for HPS70W, fracture control with impact testing per A673/A673M and ASTM A709 Table 12 Zone 3, chemical composition per ASTM A709 Table 7 for HPS 70W, surface cleanliness and welding-ready edge finish, legible marking of designation, heat number, size, thickness, and manufacturer, plus mill certificates matching the material tag. Submittals consist of verifiable mill certification emailed prior to shipment; packaging must allow offloading with forklift/crane, with 24 hours’ advance notice for escorted facility entry during business hours.

Between notices, the change is limited to coupon-location requirements (one notice allows any corner vs. others directing coupon locations per attached PDF and sampling from each piece); all other technical and delivery requirements remain the same.

SCOPE OF WORK Steel Material for Fabrication of Miter Gate Anchorages U.S. Army Corps of Engineers, St. Paul District 1. General Description. The Contractor shall provide three (3) ASTM A709 HPS 70WF 4" thick x 8' x 20' steel plates cut into three (3) equal pieces (80" x 96") and include delivery to US Army Corps of Engineers Service Base in Pleasant Valley, IA. The intended use is for the fabrication of miter gate anchorage components for Locks 5, 6 and 9 along the upper Mississippi River. Delivery MUST be no later than October 20, 2025. 2. ASTM A 709 HPS 70WF Plate Specifications. (See ASTM Attachment A 709-24) A. Steel must be compliant with DF ARS 252.225-7030, Restriction on Acquisition of Carbon, Alloy, and Armor Steel Plate. B. Dimensions of master plate is 4" thick x 8' x20' and then cut into three equal sections of 4" x 6' 8" x 8' (plus/minus 1/2"). See attached drawing. C. A 4" x 4" sample of steel to be cut from any of the four comers of each piece is acceptable to conduct testing. D. Tensile and hardness testing must meet minimums described in ASTM A 709 Table 1 for HPS70W E. The plate is a tension component of a member that requires fracture control practice. Impact test the plate in accordance with A673/A673M. Results must meet the requirements of ASTM A709 Table 12 for Zone 3 for HPS 70WF. F. Chemical Requirements must conform to ASTM A709 Table 7 for HPS 70W. G. Must conform to Buy American Act. H. Final product shall be clean and free of any oil or grease, dross, slag or burrs. All cut edges (regardless of method) shall have a surface roughness acceptable for welding. I. Final product shall be legibly marked with the applicable designation, grade, heat number, size and thickness, name brand, or trademark of the manufacturer for identification and shipment. J. Bundle and band the steel material as required for shipping, with cribbing at minimum six inches above the base of the shipping platform to allow offloading with a forklift and/or crane. Covering of the material during shipment is not required. K. Mill Certificates shall be submitted after the Contractor verifies the material meets all the aforementioned test requirements. 3. Submittals The Contractor shall submit a verifiable mill certification electronically in pdf format via email to both the Government Contracting Officer's representative and the Government technical point of contact prior to shipment of the material. The mill certificate must match the tag on the material. The Government technical point of contact is: Available at award. 4. Delivery Schedule Delivery of the ASTM A709 HPS 70WF shall be no later than October 20th, 2025. Soonest possible delivery is requested if possible. All material shall be delivered to the following address during business hours of07:00am to 03:00pm, Monday through Thursday, excluding federal holidays. Please give the POC listed below 24 hours advance notice and request ESCORTED entry to the facility. US Army Corps of Engineers MRPO-Service Base 25549, 182nd St. Pleasant Valley, IA, 52767 POC: Available at award.

From Combined Synopsis/Solicitation posted on Jul 14, 2025

SCOPE OF WORK Steel Material for Fabrication of Miter Gate Anchorages U.S. Army Corps of Engineers, St. Paul District 1. General Description. The Contractor shall provide three (3) ASTM A709 HPS 70WF 4" thick x 8' x 20' steel plates cut into three (3) equal pieces (80" x 96") and include delivery to US Army Corps of Engineers Service Base in Pleasant Valley, IA. The intended use is for the fabrication of miter gate anchorage components for Locks 5, 6 and 9 along the upper Mississippi River. Delivery MUST be no later than October 20, 2025. 2. ASTM A 709 HPS 70WF Plate Specifications. (See ASTM Attachment A 709-24) A. Steel must be compliant with DF ARS 252.225-7030, Restriction on Acquisition of Carbon, Alloy, and Armor Steel Plate. B. Dimensions of master plate is 4" thick x 8' x20' and then cut into three equal sections of 4" x 6' 8" x 8' (plus/minus 1/2"). See attached drawing. C. A 4" x 4" sample of steel to be cut from each piece (see attached pdf for acceptable coupon locations) is acceptable to conduct testing. D. Tensile and hardness testing must meet minimums described in ASTM A 709 Table 1 for HPS70W E. The plate is a tension component of a member that requires fracture control practice. Impact test the plate in accordance with A673/A673M. Results must meet the requirements of ASTM A709 Table 12 for Zone 3 for HPS 70WF. F. Chemical Requirements must conform to ASTM A709 Table 7 for HPS 70W. G. Must conform to Buy American Act. H. Final product shall be clean and free of any oil or grease, dross, slag or burrs. All cut edges (regardless of method) shall have a surface roughness acceptable for welding. I. Final product shall be legibly marked with the applicable designation, grade, heat number, size and thickness, name brand, or trademark of the manufacturer for identification and shipment. J. Bundle and band the steel material as required for shipping, with cribbing at minimum six inches above the base of the shipping platform to allow offloading with a forklift and/or crane. Covering of the material during shipment is not required. K. Mill Certificates shall be submitted after the Contractor verifies the material meets all the aforementioned test requirements. 3. Submittals The Contractor shall submit a verifiable mill certification electronically in pdf format via email to both the Government Contracting Officer's representative and the Government technical point of contact prior to shipment of the material. The mill certificate must match the tag on the material. The Government technical point of contact is: Available at award. 4. Delivery Schedule Delivery of the ASTM A709 HPS 70WF shall be no later than October 20th, 2025. Soonest possible delivery is requested if possible. All material shall be delivered to the following address during business hours of07:00am to 03:00pm, Monday through Thursday, excluding federal holidays. Please give the POC listed below 24 hours advance notice and request ESCORTED entry to the facility. US Army Corps of Engineers MRPO-Service Base 25549, 182nd St. Pleasant Valley, IA, 52767 POC: Available at award.

From Combined Synopsis/Solicitation posted on Jul 23, 2025

SCOPE OF WORK Steel Material for Fabrication of Miter Gate Anchorages U.S. Army Corps of Engineers, St. Paul District 1. General Description. The Contractor shall provide three (3) ASTM A709 HPS 70WF 4" thick x 8' x 20' steel plates cut into three (3) equal pieces (80" x 96") and include delivery to US Army Corps of Engineers Service Base in Pleasant Valley, IA. The intended use is for the fabrication of miter gate anchorage components for Locks 5, 6 and 9 along the upper Mississippi River. Delivery MUST be no later than October 20, 2025. 2. ASTM A 709 HPS 70WF Plate Specifications. (See ASTM Attachment A 709-24) A. Steel must be compliant with DF ARS 252.225-7030, Restriction on Acquisition of Carbon, Alloy, and Armor Steel Plate. B. Dimensions of master plate is 4" thick x 8' x20' and then cut into three equal sections of 4" x 6' 8" x 8' (plus/minus 1/2"). See attached drawing. C. A 4" x 4" sample of steel to be cut from each piece (see attached pdf for acceptable coupon locations) is acceptable to conduct testing. D. Tensile and hardness testing must meet minimums described in ASTM A 709 Table 1 for HPS70W E. The plate is a tension component of a member that requires fracture control practice. Impact test the plate in accordance with A673/A673M. Results must meet the requirements of ASTM A709 Table 12 for Zone 3 for HPS 70WF. F. Chemical Requirements must conform to ASTM A709 Table 7 for HPS 70W. G. Must conform to Buy American Act. H. Final product shall be clean and free of any oil or grease, dross, slag or burrs. All cut edges (regardless of method) shall have a surface roughness acceptable for welding. I. Final product shall be legibly marked with the applicable designation, grade, heat number, size and thickness, name brand, or trademark of the manufacturer for identification and shipment. J. Bundle and band the steel material as required for shipping, with cribbing at minimum six inches above the base of the shipping platform to allow offloading with a forklift and/or crane. Covering of the material during shipment is not required. K. Mill Certificates shall be submitted after the Contractor verifies the material meets all the aforementioned test requirements. 3. Submittals The Contractor shall submit a verifiable mill certification electronically in pdf format via email to both the Government Contracting Officer's representative and the Government technical point of contact prior to shipment of the material. The mill certificate must match the tag on the material. The Government technical point of contact is: Available at award. 4. Delivery Schedule Delivery of the ASTM A709 HPS 70WF shall be no later than October 20th, 2025. Soonest possible delivery is requested if possible. All material shall be delivered to the following address during business hours of07:00am to 03:00pm, Monday through Thursday, excluding federal holidays. Please give the POC listed below 24 hours advance notice and request ESCORTED entry to the facility. US Army Corps of Engineers MRPO-Service Base 25549, 182nd St. Pleasant Valley, IA, 52767 POC: Available at award.

From Combined Synopsis/Solicitation posted on Jul 25, 2025

Notice history

3
  1. Combined Synopsis/Solicitation Posted Jul 14, 2025 View
  2. Combined Synopsis/Solicitation Posted Jul 23, 2025
    • Description: Description was updated
  3. Combined Synopsis/Solicitation LATEST Posted Jul 25, 2025
    No changes from previous notice

Details

Solicitation number W912ES25QA039
Notice ID 7f52f4f0cb3d484da786956dfa5b079f
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 9515
NAICS 331110
Set-aside No Set aside used
Place of performance Pleasant Valley, Iowa
Archive date Aug 12, 2025

Award Information

Not yet awarded

Contacts

primary
Karl Just

Email

Phone

secondary
Jesse Onkka

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION MISSISSIPPI VALLEY
W07V ENDIST ST PAUL

Place of Performance

Pleasant Valley, Iowa 52767
USA

Dates

Posted Jul 25, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 28, 2025 1 year ago