Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 3 notices 3 documents

STATION ATLANTIC CITY EXTERNAL DOOR REPLACEMENT 37050PR26EXTERNALDOORS

Solicitation 37050PR26EXTERNALDOORS Copied Notice ID 8e6f2e60d89a478a8155097188878d7d Copied HOMELAND SECURITY, DEPARTMENT OF — TRACEN CAPE MAY(00042)
SAM.gov
Posted
Mar 31, 2026
Deadline
May 01, 2026
Set-aside
SBA
NAICS
236220
PSC
Z2AA

Summary

AI-generated · Apr 01, 2026

Remove and replace ten exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Provide all labor, materials, equipment, and supervision necessary to complete the replacement. Detailed requirements are in the Scope of Work labeled "SOW STA Atlantic City door replacement."

Provide all labor, materials, equipment, and supervision necessary to remove and replace all ten (10) existing exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Details contained within the Scope of Work labeled "SOW STA Atlantic City door replacement".

From Solicitation posted on Mar 31, 2026

Provide all labor, materials, equipment, and supervision necessary to remove and replace all ten (10) existing exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Details contained within the Scope of Work labeled "SOW STA Atlantic City door replacement".

From Solicitation posted on Apr 01, 2026

As per the SOW, 3.e exterior grade hollow metal doors are to be provided giving mention to consideration for exterior use and corrosion resistance but does not provide clear specification on the desired product. Does the government intend to receive grade 316 stainless steel doors, marine-grade powder coated doors, aluminum doors, or galvanized/zinc-coated steel doors? Answer: 316 stainless steel coated for weather. In coordination with the previous question, is it desired for all hardware to be 316 stainless steel where applicable to resist corrosion? Answer: Yes As per SOW, 3.f it is requested to provide new push-button door locks handles at all 10 door locations. It was noted at the site visit that this is desired only at two (2) locations. Can you please confirm if all doors shall receive the Kaba Simplex Series locks or only the two? Answer: Two push button style locks If only the two locks, can you please confirm all others should be a lever lockset with BEST 7-Pin cylinders to match existing? Answer: All other will be lever lock 7-pin to match what is existing Should locksets be mortised lockset or cylindrical? Answer: Cylindrical Does the government wish to have the northern door at the UPH housing with a lever lockset or blank plate as requested at the site visit? Answer: Blank back plate. Door is exit only As per SOW, 3.i, no fire rating was provided for the various doors, does the glazing require a 45-minute fire rating? Answer: no It was noted at the site visit that State Historic Preservation Office (SHPO) approvals were required for this project, will any documentation or coordination with SHPO be required from the contractor? Answer: Proposed materials and doors will be reviewed for compliance with SHIPO. During the site visit it was specified that all doors require to be similar or match what is being replaced. What will be the limitations of repair around the doors? Answer: It was noted at the site visit there are existing conditions presenting with considerable damage to walls, floors, and surrounds. Clean professional finish. Some require drywall repairs around the frames. Wall finish(paint) is required. Corner to corner of wall. Will limitations be only to that which is damaged by the replacement of the door? Answer: All doors and finishes are required within reason for the project. The SOW currently provides a 90-day performance period from the notice to proceed. Dependent upon the RFI for the type of doors desired, lead times could by themselves exceed this period of performance timeline. Can the POP be extended to allow for material lead times? Answer: I am unable to answer this question as I am not on that level in this process. Is there currently existing attic stock for the new exterior siding installed for use in repairs around the doors that would be available for use? Answer: The unit does have spare siding. Unit does not have the trim Provide all labor, materials, equipment, and supervision necessary to remove and replace all ten (10) existing exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Details contained within the Scope of Work labeled "SOW STA Atlantic City door replacement".

From Solicitation posted on May 01, 2026

Notice history

3
  1. Solicitation Posted Mar 31, 2026
  2. Solicitation Posted Apr 01, 2026
    No changes from previous notice
  3. Solicitation LATEST Posted May 01, 2026
    • Description: Description was updated
    • Response Deadline: May 01, 2026May 08, 2026

Details

Solicitation number 37050PR26EXTERNALDOORS
Notice ID 8e6f2e60d89a478a8155097188878d7d
Notice type Solicitation
Product / Service (PSC) Z2AA
NAICS 236220
Place of performance Atlantic City, New Jersey
Archive date May 01, 2026

Award Information

Not yet awarded

Contacts

primary
SERGIO COSBY

Email

Phone

secondary
Jon Christiansen

Email

Phone

Agency

HOMELAND SECURITY, DEPARTMENT OF
US COAST GUARD
TRACEN CAPE MAY(00042)

Place of Performance

Atlantic City, New Jersey 08401
USA

Dates

Posted Mar 31, 2026 4 months ago
Last Updated Aug 06, 2026 1 day ago
Due May 01, 2026 3 months ago