Static Electricity Prevention Grounding Project at Ammunition Supply Point - Fort Riley W911RX25Q19A1
Summary
AI-generated · Aug 27, 2025Market research is being conducted to identify qualified electrical contractors with hazardous-environment electrical-safety capabilities to support a grounding project at Fort Riley, Kansas. The contractor must supply electricians, appropriate PPE, and any specialty equipment or materials needed to complete the grounding work.
Scope includes inspecting and installing or repairing grounding points and braided mesh straps on all interior equipment inside the Ammunition Surveillance Workshop (Building 929). Tasks involve replacing braided straps, cleaning existing grounding clamps as needed, and performing ground testing on all newly grounded items. Specific items to be serviced include 6 workshop tables, 2 shelving units, 1 storage cabinet, 4 floor mats, and 1 louver/window, with the goal of achieving complete grounding of interior equipment within the facility.
The Fort Riley Mission and Installation Contracting and Command (MICC) Office on behalf of the 1st Infantry Division, the Big Red One located in Fort Riley Kansas is issuing this source sought as a means of conducting market research to identify parties having an interest in and the resources to support the requirement for electrical services. The contractor shall provide an electrician(s) qualified in a hazardous work environment/electrical safety, required job performance equipment and materials, and any specialty equipment and supplies needed to perform and complete contract requirements. Performance and required duties include the inspection and installation or repair of proper grounding points, braided mesh webbing straps on all interior equipment within the facility and the ground testing of that equipment when completed at building 929 Installation Ammunition Supply Point Ammunition Surveillance workshop, Fort Riley, Kansas. The items being serviced within the Ammunition Surveillance Workshop consist of, but not limited to 6 workshop tables, 2 Shelving units, 1 Storage Cabinet, 4 Floor Mats, 1 Louver/Window, replacement of Braided Straps, Cleaning (as required) of existing grounding clamps, and the testing of all new grounded items. The services and actions your company will be required to perform to complete and fulfill this contract is the complete grounding of interior equipment within the facility.
From Sources Sought posted on Aug 05, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA