Stanley Admin Site Warehouse Bldg Heating Improvement at Sawtooth NF 1240LT26Q044
Summary
AI-generated · Apr 07, 2026Install new liquid-propane unit heaters at the Stanley Admin Site Warehouse Building. Heaters must be ceiling- or wall-mounted, connect to the existing propane service and to existing electrical, and include new thermostat controls and wiring. The contractor shall complete all work to render the systems fully operational, including interior finish repairs and final cleanup from construction.
Location is the Stanley Ranger Station Administrative Site, just south of Stanley, Idaho. Work should minimize disturbance to existing building elements and finishes; electrical service exists and may be used during construction, with contractor providing necessary connections and extensions. Water is available via exterior hose bibs. Restroom and sink facilities are off limits to contractor personnel. Construction hours are 7:00 a.m. to 7:00 p.m., Monday through Saturday.
Project Description: This project will install new liquid propane unit heaters at the Stanley Admin Site Warehouse Building. Unit heaters shall be ceiling or wall mounted, shall connect to existing propane service, shall connect to existing electrical, and shall include new thermostat controls/wiring for operation. Installations shall include all required work to render fully operational unit heater systems along with any interior finish repairs and final cleanup from the construction activities. Project Location: This project will take place at the Stanley Ranger Station Administrative Site located just south of Stanley, Idaho. Northing and Easting coordinate locations are provided for reference on the Plans. Site Information and Limitations: The work shall be completed to limit disturbance to existing building elements and finishes. Electrical service exists at the warehouse building. Contractors may use existing electrical service during construction. Contractor shall provide connections and extensions of services as required for construction operations. Water service is also available for use at each building site via exterior hose bibbs. Restroom and sink facilities are off limits to the Contractor s personnel. Allowable Construction Hours 7:00 a.m. to 7:00 p.m. Monday through Saturday for all work activities. POP Dates: 6/1/2026 - 7/3/2026
From Presolicitation posted on Apr 06, 2026Notice history
1-
Presolicitation LATEST Posted Apr 06, 2026
Details
Award Information
Not yet awarded