St. Louis District Civil Works and Flood Recovery Projects IDIQ W912P926DA014
Summary
AI-generated · Nov 05, 2025A long-term IDIQ for Civil Works and Flood Recovery projects in the St. Louis District requires a contractor to furnish all labor, equipment, operators, supervision, quality control, materials, and incidentals to perform a broad range of construction activities. Tasks include surveying, earthwork and borrow operations, lime-treated embankment, water management, various stone surfacing and access road repairs, installation of stone armored protection, and the installation, rehabilitation, or abandonment of drainage structures (including relief wells, camera inspections, and slip lining), with turf restoration on compromised landside, riverside, and crown levee sections. Work is to be executed under base contract and task-order specific plans and specifications.
Award has been made to Supplied Industrial Solutions, Inc. for $95 million. Recent amendments update procurement requirements: Amendment 0001 adds missing project detail and updates wage determinations; Amendment 0002 increases the minimum single-contract bonding capacity to $5 million, removes the Pre-Award Survey Form 1403, provides a Proposal Cover Page Template, increases the technical approach page limit to 30 pages, and extends the proposal due date by one week. This signals a significant bid-breadth with stringent bonding and proposal formatting requirements.
The work covered by this contract consist of furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Projects to include, but not limited to surveying, earthwork operations, borrow operations, lime treated embankment operations, care of water, various stone surfacing placement, various access road repairs, installation of stone armored protection, installation, rehabilitation and abandonment of drainage structures and associated apertures, relief well rehabilitation and replacement, camera inspection and slip lining existing drainage structures, and establishment of turf for repairs of compromised landside, riverside, and crown levee sections in accordance with both base contract and task order specific supplemental plans and specifications. ------ AMENDMENT 0001 corrects the Bidder Inquiry Key, provides missing Appendix B - Project Detail Sheet, and updates Wage Determinations MO20250001 and IL20250016. SEE ATTACHMENTS -----AMENDMENT 0002 revise the minimum single contract bonding capacity requirement to $5 million, remove the requirement for the Pre-Award Survey Form 1403, provide the Proposal Cover Page Template, Increase the allowable page limit for Factor 1 ? Technical Approach, Sub-Factor (a) to 30 pages and extend the proposal due date by one (1) week to August 12, 2025 at 10:00 AM CDT.
From Award Notice posted on Nov 04, 2025Notice history
1Details
Award Information
Award Notices
Posted: Nov 04, 2025
The work covered by this contract consist of furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Proje...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| SUPPLIED INDUSTRIAL SOLUTIONS, INC. | NKFAQ2J467L3 | 3CX55 | Granite City, IL |
Contacts
Agency
Place of Performance
63103