St. Louis District Civil Works and Flood Recovery Projects IDIQ W912P926DA008
Summary
AI-generated · Nov 05, 2025Furnish all equipment, labor, operators, supervision, quality control, supplies, materials, and incidentals to perform Civil Works and Flood Recovery construction activities under an IDIQ for the St. Louis District. Work includes surveying, earthwork and borrow operations, lime-treated embankment, water control, stone surfacing and access road repairs, installation of stone armored protection, and the installation, rehabilitation, and abandonment of drainage structures (including relief wells, camera inspections, and slip-lining), plus establishment of turf to repair landside, riverside, and crown levee sections, in accordance with base and task-order plans and specifications.
Amendments address administrative and submittal changes: minimum single-contract bonding increased to $5 million; removal of Pre-Award Survey Form 1403; addition of a Proposal Cover Page Template; technical-approach page limit increased to 30 pages; wage determinations updated; and the proposal due date extended by one week. The contract was awarded to Legacy Corporation of IL for about $95 million to execute the work under this IDIQ.
The work covered by this contract consist of furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Projects to include, but not limited to surveying, earthwork operations, borrow operations, lime treated embankment operations, care of water, various stone surfacing placement, various access road repairs, installation of stone armored protection, installation, rehabilitation and abandonment of drainage structures and associated apertures, relief well rehabilitation and replacement, camera inspection and slip lining existing drainage structures, and establishment of turf for repairs of compromised landside, riverside, and crown levee sections in accordance with both base contract and task order specific supplemental plans and specifications. ------ AMENDMENT 0001 corrects the Bidder Inquiry Key, provides missing Appendix B - Project Detail Sheet, and updates Wage Determinations MO20250001 and IL20250016. SEE ATTACHMENTS -----AMENDMENT 0002 revise the minimum single contract bonding capacity requirement to $5 million, remove the requirement for the Pre-Award Survey Form 1403, provide the Proposal Cover Page Template, Increase the allowable page limit for Factor 1 ? Technical Approach, Sub-Factor (a) to 30 pages and extend the proposal due date by one (1) week to August 12, 2025 at 10:00 AM CDT.
From Award Notice posted on Nov 04, 2025Notice history
1Details
Award Information
Award Notices
Posted: Nov 04, 2025
The work covered by this contract consist of furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Proje...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| LEGACY CORPORATION OF IL | Y7XGK8ARPMR6 | 54CW0 | East Moline, IL |