St. Louis District Civil Works and Flood Recovery Projects IDIQ W912P926DA005
Summary
AI-generated · Nov 05, 2025A multi-year IDIQ contract to perform Civil Works and Flood Recovery construction in the St. Louis District, requiring the contractor to furnish all equipment, labor, supervision, quality control, materials, and related incidentals to complete a broad range of activities. Work includes surveying, earthwork and borrow operations, lime-treated embankment, water control, stone surfacing placement, access road repairs, installation of stone armored protection, and the installation, rehabilitation, and abandonment of drainage structures (including relief wells and camera inspections with slip lining), plus turf establishment to repair landside, riverside, and crown levee sections, in accordance with base contract and task-order plans and specifications.
Amendments updated several procurement requirements: the minimum single-contract bonding capacity was raised to $5 million; the Pre-Award Survey Form 1403 was removed; a Proposal Cover Page Template is provided; the page limit for Technical Approach, Sub-Factor (a) was increased to 30 pages; and the proposal due date was extended by one week. The award was issued for $95 million to DaVinroy Mechanical Contractor, Inc.
The work covered by this contract consist of furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Projects to include, but not limited to surveying, earthwork operations, borrow operations, lime treated embankment operations, care of water, various stone surfacing placement, various access road repairs, installation of stone armored protection, installation, rehabilitation and abandonment of drainage structures and associated apertures, relief well rehabilitation and replacement, camera inspection and slip lining existing drainage structures, and establishment of turf for repairs of compromised landside, riverside, and crown levee sections in accordance with both base contract and task order specific supplemental plans and specifications. ------ AMENDMENT 0001 corrects the Bidder Inquiry Key, provides missing Appendix B - Project Detail Sheet, and updates Wage Determinations MO20250001 and IL20250016. SEE ATTACHMENTS -----AMENDMENT 0002 revise the minimum single contract bonding capacity requirement to $5 million, remove the requirement for the Pre-Award Survey Form 1403, provide the Proposal Cover Page Template, Increase the allowable page limit for Factor 1 ? Technical Approach, Sub-Factor (a) to 30 pages and extend the proposal due date by one (1) week to August 12, 2025 at 10:00 AM CDT.
From Award Notice posted on Nov 04, 2025Notice history
1Details
Award Information
Award Notices
Posted: Nov 04, 2025
The work covered by this contract consist of furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Proje...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| DAVINROY MECHANICAL CONTRACTOR, INC | JY2UDDXQM716 | 1CVM5 | Belleville, IL |
Contacts
Agency
Place of Performance
63103