St. Louis District Civil Works and Flood Recovery Projects IDIQ W912P925R0006
Summary
AI-generated · Aug 24, 2025Furnish all equipment, labor, operators, supervision, quality control, supplies, materials, and incidentals to perform Civil Works and Flood Recovery Projects under an IDIQ for the St. Louis District. Work includes surveying, earthwork, borrow operations, lime-treated embankment, care of water, stone surfacing placement, access road repairs, installation of stone armored protection, and the installation, rehabilitation, and abandonment of drainage structures and apertures. Also included are relief well rehabilitation and replacement, camera inspection and slip lining of drainage structures, and turf establishment for repairs to landside, riverside, and crown levee sections, in accordance with base contract and task-order-specific supplemental plans and specifications.
Amendment updates: Amendment 0001 fixes the Bidder Inquiry Key, adds the missing Appendix B – Project Detail Sheet, and updates wage determinations. Amendment 0002 increases the minimum single-contract bonding requirement to $5 million, removes Pre-Award Survey Form 1403, provides a Proposal Cover Page Template, raises the page limit for the Technical Approach (Sub-Factor a) to 30 pages, and extends the proposal due date by one week.
The work covered by this contract consist of furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Projects to include, but not limited to surveying, earthwork operations, borrow operations, lime treated embankment operations, care of water, various stone surfacing placement, various access road repairs, installation of stone armored protection, installation, rehabilitation and abandonment of drainage structures and associated apertures, relief well rehabilitation and replacement, camera inspection and slip lining existing drainage structures, and establishment of turf for repairs of compromised landside, riverside, and crown levee sections in accordance with both base contract and task order specific supplemental plans and specifications.
From Solicitation posted on Jun 25, 2025The work covered by this contract consist of furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Projects to include, but not limited to surveying, earthwork operations, borrow operations, lime treated embankment operations, care of water, various stone surfacing placement, various access road repairs, installation of stone armored protection, installation, rehabilitation and abandonment of drainage structures and associated apertures, relief well rehabilitation and replacement, camera inspection and slip lining existing drainage structures, and establishment of turf for repairs of compromised landside, riverside, and crown levee sections in accordance with both base contract and task order specific supplemental plans and specifications. ------ AMENDMENT 0001 corrects the Bidder Inquiry Key, provides missing Appendix B - Project Detail Sheet, and updates Wage Determinations MO20250001 and IL20250016. SEE ATTACHMENTS
From Solicitation posted on Jul 02, 2025The work covered by this contract consist of furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Projects to include, but not limited to surveying, earthwork operations, borrow operations, lime treated embankment operations, care of water, various stone surfacing placement, various access road repairs, installation of stone armored protection, installation, rehabilitation and abandonment of drainage structures and associated apertures, relief well rehabilitation and replacement, camera inspection and slip lining existing drainage structures, and establishment of turf for repairs of compromised landside, riverside, and crown levee sections in accordance with both base contract and task order specific supplemental plans and specifications. ------ AMENDMENT 0001 corrects the Bidder Inquiry Key, provides missing Appendix B - Project Detail Sheet, and updates Wage Determinations MO20250001 and IL20250016. SEE ATTACHMENTS -----AMENDMENT 0002 revise the minimum single contract bonding capacity requirement to $5 million, remove the requirement for the Pre-Award Survey Form 1403, provide the Proposal Cover Page Template, Increase the allowable page limit for Factor 1 ? Technical Approach, Sub-Factor (a) to 30 pages and extend the proposal due date by one (1) week to August 12, 2025 at 10:00 AM CDT.
From Solicitation posted on Jul 23, 2025Notice history
3-
-
Solicitation LATEST Posted Jul 23, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 05, 2025 → Aug 12, 2025
Details
Award Information
Not yet awarded