SSRL B116 & B132 BPM HVAC Replacement SLAC_RFP_363431
Summary
AI-generated · Mar 31, 2026Remove and replace the HVAC systems servicing the Beam Position Monitor rooms in Buildings 116 and 132 in their entirety. Provide all labor, supervision, tools, materials, equipment, and services, and perform the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards.
Work is to be carried out primarily during the facility’s summer shutdown window. If equipment lead times prevent full completion within that window, the project may be phased to complete as much work as possible during the shutdown, with any remaining work addressed during the next year’s summer shutdown.
The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132. All construction activities must be performed primarily during SSRL s Summer 2026 shutdown, scheduled from July 21, 2026 through October 1, 2026, with the HVAC system operational no later than September 19, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown.
From Sources Sought posted on Mar 30, 2026The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132. All construction activities must be performed primarily during SSRL s Summer 2026 shutdown, scheduled from July 21, 2026 through October 1, 2026, with the HVAC system operational no later than September 19, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown. NOTE: The SOW is currently being revised, and I expect to upload an updated version to this posting this week. The site walk has been POSTPONED and is currently TBD; I will notify all interested vendors once the date is confirmed.
From Sources Sought posted on Mar 31, 2026The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132. All construction activities must be performed primarily during SSRL s Summer 2026 shutdown, scheduled from July 21, 2026 through August 31, 2026, with the HVAC system operational no later than September, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown. THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest by sending their capabilities statement to Doreen Agbayani at doreena@slac.stanford.edu.
From Sources Sought posted on Apr 02, 2026Notice history
3-
Sources Sought Posted Mar 30, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA