Contacts, documents and full notice history are available with a subscription.
Sources Sought Expired 3 notices 23 documents

SSRL B116 & B132 BPM HVAC Replacement SLAC_RFP_363431

Solicitation SLAC_RFP_363431 Copied Notice ID 8fb85a4ddb944e00a7c3e53cdd85ec97 Copied ENERGY, DEPARTMENT OF — SLAC Natl Accel Lab -DOE Contractor
SAM.gov
Posted
Mar 30, 2026
Deadline
Apr 13, 2026
Set-aside
None
NAICS
N/A
PSC
N/A

Summary

AI-generated · Mar 31, 2026

Remove and replace the HVAC systems servicing the Beam Position Monitor rooms in Buildings 116 and 132 in their entirety. Provide all labor, supervision, tools, materials, equipment, and services, and perform the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards.

Work is to be carried out primarily during the facility’s summer shutdown window. If equipment lead times prevent full completion within that window, the project may be phased to complete as much work as possible during the shutdown, with any remaining work addressed during the next year’s summer shutdown.

The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132. All construction activities must be performed primarily during SSRL s Summer 2026 shutdown, scheduled from July 21, 2026 through October 1, 2026, with the HVAC system operational no later than September 19, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown.

From Sources Sought posted on Mar 30, 2026

The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132. All construction activities must be performed primarily during SSRL s Summer 2026 shutdown, scheduled from July 21, 2026 through October 1, 2026, with the HVAC system operational no later than September 19, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown. NOTE: The SOW is currently being revised, and I expect to upload an updated version to this posting this week. The site walk has been POSTPONED and is currently TBD; I will notify all interested vendors once the date is confirmed.

From Sources Sought posted on Mar 31, 2026

The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132. All construction activities must be performed primarily during SSRL s Summer 2026 shutdown, scheduled from July 21, 2026 through August 31, 2026, with the HVAC system operational no later than September, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown. THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest by sending their capabilities statement to Doreen Agbayani at doreena@slac.stanford.edu.

From Sources Sought posted on Apr 02, 2026

Notice history

3
  1. Sources Sought Posted Mar 30, 2026
  2. Sources Sought Posted Mar 31, 2026
    • Description: Description was updated
  3. Sources Sought LATEST Posted Apr 02, 2026
    • Description: Description was updated

Details

Solicitation number SLAC_RFP_363431
Notice ID 8fb85a4ddb944e00a7c3e53cdd85ec97
Notice type Sources Sought
Place of performance Menlo Park, California
Archive date Apr 28, 2026

Award Information

Not yet awarded

Contacts

primary
doreen agbayani

Email

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
SLAC Natl Accel Lab -DOE Contractor

Place of Performance

Menlo Park, California 94025
USA

Dates

Posted Mar 30, 2026 4 months ago
Last Updated Aug 06, 2026 2 days ago
Due Apr 13, 2026 3 months ago