J012--Sprinkler Inspection 36C24426Q0619
Summary
AI-generated · May 29, 2026Contractor shall provide all labor, materials, equipment, and supervision to perform a five-year obstruction inspection, testing, and maintenance of the facility's sprinkler systems in accordance with NFPA 25 and applicable codes.
Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of 40 sprinkler gauges. Review attachments for detailed requirements; questions must be submitted by the due date stated in the RFQ.
Please review all attachments and solicitation in detail. No questions will be accepted past the due date stated in the RFQ. Please provide all required information. The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility s sprinkler systems in accordance with NFPA (National Fire Protection Association s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of 40 sprinkler gauges.
From Solicitation posted on May 28, 2026Notice history
2-
-
Award Notice LATEST Posted Jun 23, 2026
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| MCCRAY GROUP VENTURES LLC | PTMVMM1BZEJ3 | 9QCV7 | CHARLOTTE |
Contacts
Contracting Officer