Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 2 notices

SPRING,FLAT N0010425QXE32

Solicitation N0010425QXE32 Copied Notice ID 1394d8687ec74cbba0f8ed4eb941eee7 Copied DEPT OF DEFENSE — NAVSUP WEAPON SYSTEMS SUPPORT MECH
SAM.gov
Posted
Aug 08, 2025
Deadline
Aug 08, 2025
Set-aside
None
NAICS
332613
PSC
5360

Summary

AI-generated · Aug 24, 2025

Manufacture and supply the SPRING, FLAT per the referenced drawing package and contract documents, with production and quality controls that include 100% Production Lot Testing (PLT) at a Navy test facility and First Article Testing (FAT). Deliveries must be FOB destination and include all shipping costs. The contractor must prepare the item for government testing: deliver all units for PLT to the Navy’s Indian Head EOD Testing division for 100% inspection, with the EOD technician having up to 90 days to test/inspect/accept, and an additional 30 days for the government to notify the contractor of results (total 120 days). FAT requires delivery of five units to NSWC Indian Head EOD Technology Center for approval. The item must be produced according to MIL-DTL-19595 for inspection criteria (including applicable markings per MIL-STD-130) and other specified documents; production changes require formal government notification and approval. The government will evaluate bids on price, past performance, and supplier performance risk per DFARS 252.204-7024, with recordkeeping requirements for inspection results and certificates of conformance.

The second notice notes that the solicitation is currently closed due to an unexpected delay uploading drawings to sam.gov; it will reopen when the drawings are available. Interested vendors may request access to the drawings on sam.gov once the solicitation is active again. The core requirements (competitive award, non–small-business-set-aside, FAT, PLT, marking and packaging standards, and evaluation factors) remain the same once re-opened.

CONTACT INFORMATION|4|N774.4|BV4|(717) 605-3080|tyler.l.curfman.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|MIL-I-45208| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)||TBD|N00104|TBD|TBD|See Schedule|TBD|||N42794|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS Mechanicsburg| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332613|600|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This is a competitive Navy spare requirement and is not a small business set-aside. 2. Quotes shall be emailed to tyler.l.curfman.civ@us.navy.mil. Quotes shall be received no later than 5:00 pm Eastern on the response date specified in the solicitation in order to be considered. 3. FOB destination. Quotes shall include shipping costs for shipment of units to the destination. 4. Production Lot Testing (100% inspection) applies for the requirement. The EOD Technician has 90 days in which to test/inspect/accept the production quantity. The contract administrator has an additional 30 days in which to notify the contractor of the results; total 120 days. 5. First Article Testing applies for the requirement. 6. Evaluation factors: Evaluation Utilizing Simplified Acquisition Procedures The Government will issue an order resulting from this Request for Quotation to the responsible offeror whose quotation results in the best value to the Government, considering both price and non-price factors. The following factors will be used to evaluate quotations in order of relative importance: 1) Price. 2) Past Performance. The offeror's past performance on related contracts will be evaluated to determine the following as appropriate: successful performance of contract requirements, quality and timeliness of delivery of goods and services, cost management, communications between contracting parties, and customer satisfaction. 3) Supplier Performance Risk as described in DFARS 252.204-7024. (End of provision) 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the SPRING,FLAT . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=5762142 |53711| B| |C|0001 | B|00000|0000000 DOCUMENT REF DATA=MIL-DTL-19595 | | |D |030211|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The SPRING,FLAT furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;53711 5762142 ; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Production Lot Approval (Government Testing) - Production Lot Test and approval is required. 3.4 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.5 Non-Magnetic Inspection shall be in accordance with MIL-DTL-19595. 3.6 The contractor shall notify the Government testing activity ;30; days prior to shipment of material to be tested. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Production Lot Test - The Contractor shall deliver ;ALL; unit(s) to ;NAVAL SURFACE WARFARE CENTER INDIAN HEAD EXPLOSIVE ORDNANCE DISPOSAL TECHNOLOGY DIVISION INDIAN HEAD, MD 20640-5070, Attn: Cory Legagneux.; for 100% production lot testing in accordance with ;For all requirements for part number 5762142 and all associated Specifications.; . Upon satisfactory completion of the production lot test, the Government facility shall prepare and package the unit(s) for transshipment to final shipment destination(s) in accordance with the requirements of this contract/purchase order. 4.5 First Article Test/Inspection (Government) - The Contractor shall deliver ;5; unit(s) to ;NSWC Indian Head EOD Technology Center N42794 2008 Stump Neck Rd. Bldg 2195, Indian Head, MD 20640 ATTN: Terri Douglas or Cory Legagneux 301.744.5776 ; for First Article Tests in accordance with the ;drawing 5762142 and all other associated specifications and contract provisions. The government has 90 days upon receipt of material to test and inspect the first article units. Test/Inspection Report Reqd. Approved by: NSWCIH EODTECHCTR ISEA Phil Vass philip.r.vass.civ@us.navy.mil ; . 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer. 6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.4 ;All vendors are required to submit Material C of Cs on all First Article (FA) and Production Lot Testing (PLT) materials arriving for final acceptance inspection.; 6.5 ;All material items must pass dimensional requirement IAW Technical Drawing package. A request for variance (Waiver/Deviation) must be submitted via a DD form 1694 through NAVSUP's Contracting Officer. Please include copies of all Material CERTS (certificate of conformance) on materials. Material Certs are part of the overall acceptance creiteria/process. No Non-Magnetic Testing required for this material.;

From Solicitation posted on Aug 01, 2025

CONTACT INFORMATION|4|N774.4|BV4|(717) 605-3080|tyler.l.curfman.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|MIL-I-45208| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)||TBD|N00104|TBD|TBD|See Schedule|TBD|||N42794|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS Mechanicsburg| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332613|600|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The solicitation is currently closed. There is an unexpected delay in uploading drawings to sam.gov for the requirement. The solicitation will be reopened when the drawings are available. Interested vendors may request access to the drawings on sam.gov when they are available and when the solicitation is active. 1. This is a competitive Navy spare requirement and is not a small business set-aside. 2. Quotes shall be emailed to tyler.l.curfman.civ@us.navy.mil. Quotes shall be received no later than 5:00 pm Eastern on the response date specified in the solicitation in order to be considered. 3. FOB destination. Quotes shall include shipping costs for shipment of units to the destination. 4. Production Lot Testing (100% inspection) applies for the requirement. The EOD Technician has 90 days in which to test/inspect/accept the production quantity. The contract administrator has an additional 30 days in which to notify the contractor of the results; total 120 days. 5. First Article Testing applies for the requirement. 6. Evaluation factors: Evaluation Utilizing Simplified Acquisition Procedures The Government will issue an order resulting from this Request for Quotation to the responsible offeror whose quotation results in the best value to the Government, considering both price and non-price factors. The following factors will be used to evaluate quotations in order of relative importance: 1) Price. 2) Past Performance. The offeror's past performance on related contracts will be evaluated to determine the following as appropriate: successful performance of contract requirements, quality and timeliness of delivery of goods and services, cost management, communications between contracting parties, and customer satisfaction. 3) Supplier Performance Risk as described in DFARS 252.204-7024. (End of provision) 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the SPRING,FLAT . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=5762142 |53711| B| |C|0001 | B|00000|0000000 DOCUMENT REF DATA=MIL-DTL-19595 | | |D |030211|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The SPRING,FLAT furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;53711 5762142 ; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Production Lot Approval (Government Testing) - Production Lot Test and approval is required. 3.4 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.5 Non-Magnetic Inspection shall be in accordance with MIL-DTL-19595. 3.6 The contractor shall notify the Government testing activity ;30; days prior to shipment of material to be tested. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Production Lot Test - The Contractor shall deliver ;ALL; unit(s) to ;NAVAL SURFACE WARFARE CENTER INDIAN HEAD EXPLOSIVE ORDNANCE DISPOSAL TECHNOLOGY DIVISION INDIAN HEAD, MD 20640-5070, Attn: Cory Legagneux.; for 100% production lot testing in accordance with ;For all requirements for part number 5762142 and all associated Specifications.; . Upon satisfactory completion of the production lot test, the Government facility shall prepare and package the unit(s) for transshipment to final shipment destination(s) in accordance with the requirements of this contract/purchase order. 4.5 First Article Test/Inspection (Government) - The Contractor shall deliver ;5; unit(s) to ;NSWC Indian Head EOD Technology Center N42794 2008 Stump Neck Rd. Bldg 2195, Indian Head, MD 20640 ATTN: Terri Douglas or Cory Legagneux 301.744.5776 ; for First Article Tests in accordance with the ;drawing 5762142 and all other associated specifications and contract provisions. The government has 90 days upon receipt of material to test and inspect the first article units. Test/Inspection Report Reqd. Approved by: NSWCIH EODTECHCTR ISEA Phil Vass philip.r.vass.civ@us.navy.mil ; . 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer. 6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.4 ;All vendors are required to submit Material C of Cs on all First Article (FA) and Production Lot Testing (PLT) materials arriving for final acceptance inspection.; 6.5 ;All material items must pass dimensional requirement IAW Technical Drawing package. A request for variance (Waiver/Deviation) must be submitted via a DD form 1694 through NAVSUP's Contracting Officer. Please include copies of all Material CERTS (certificate of conformance) on materials. Material Certs are part of the overall acceptance creiteria/process. No Non-Magnetic Testing required for this material.;

From Solicitation posted on Aug 08, 2025

Notice history

2
  1. Solicitation Posted Aug 01, 2025 View
  2. Solicitation LATEST Posted Aug 08, 2025
    • Description: Description was updated
    • Response Deadline: Aug 11, 2025Aug 08, 2025

Details

Solicitation number N0010425QXE32
Notice ID 1394d8687ec74cbba0f8ed4eb941eee7
Notice type Solicitation
Product / Service (PSC) 5360
NAICS 332613
Archive date Aug 23, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Telephone: 7176053080

Email

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSUP
NAVSUP WEAPON SYSTEMS SUPPORT
NAVSUP WSS MECHANICSBURG
NAVSUP WEAPON SYSTEMS SUPPORT MECH

Dates

Posted Aug 08, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 08, 2025 11 months ago