Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation NONE Expired 4 notices 4 documents

Special Support Equipment (SSE) Machined Parts N6660425Q0437

Solicitation N6660425Q0437 Copied Notice ID 1850be62a4de4ad394b02f58d2ca07d3 Copied DEPT OF DEFENSE — NUWC DIV NEWPORT
SAM.gov
Posted
Aug 05, 2025
Deadline
Aug 15, 2025
Set-aside
NONE
NAICS
334511
PSC
5995

Summary

AI-generated · Aug 23, 2025

Special Support Equipment (SSE) Machined Parts is a procurement for a broad set of machined components with coordinated measurement data requirements. A CMM test data deliverable (CDRL A001) is required, with 1 CMM report per unit for certain part numbers (07093372, 07093377, 07093378, 07093316, 07093339-1, 077093339-2, 07093303, 07093359) and 1 CMM report per PN for all other PNs, totaling 91 reports. Drawings and STEP files are part of the package; 07093347 is obsolete per the latest TDP and replaced by 07093339-2, for which a drawing/STEP file is attached.

Amendments have introduced industry Q&A, updated attachments, and a new RFQ; the solicitation is being resolicited under full and open competition. Revised CDRLs are forthcoming, and it has been clarified that the specific CDRL A001 CMM data requirements apply as described, with the replacement part and related drawings STEP files provided in attachments.

Amendment 002: The purpose of this amendment is to post question and answer from industry and to add additional required drawings documents. Q2: Can you send the drawings and step files for the following? CLIN 0026 07093347 HOUSING,BLANK-FBG COUPLER CLIN 0031 07093361 MOUNT,HORN A2: See attached. 07093347 is obsolete in our latest TDP. I’ve attached the drawing/STEP file for 07093339-2, which is its replacement. Amendment 001: The purpose of this amendment is to post question and answer from industry. Q1: I'd like to verify CDRL A001 CMM Test Data is only required for the 7 items listed in Block 10 and not for all 1-46 CLINS. Correct? A1: Correct. Please see attached synopsis/solicitation for full details.

From Combined Synopsis/Solicitation posted on Jun 23, 2025

Amendment 003: The purpose of this amednment is to post new RFQ N6660425Q0437 and to update all attachments. Amendment 002: The purpose of this amendment is to post question and answer from industry and to add additional required drawings documents. Q2: Can you send the drawings and step files for the following? CLIN 0026 07093347 HOUSING,BLANK-FBG COUPLER CLIN 0031 07093361 MOUNT,HORN A2: See attached. 07093347 is obsolete in our latest TDP. I ve attached the drawing/STEP file for 07093339-2, which is its replacement. Amendment 001: The purpose of this amendment is to post question and answer from industry. Q1: I'd like to verify CDRL A001 CMM Test Data is only required for the 7 items listed in Block 10 and not for all 1-46 CLINS. Correct? A1: Correct. Please see attached synopsis/solicitation for full details.

From Combined Synopsis/Solicitation posted on Jul 17, 2025

Amendment 004: The purpose of this amendment is to resolicit under full and open competition. As a result, the solicitation closing date and time is extended to 1400 EST, 15 August 2025. All other terms and conditions remain unchanged. Amendment 003: The purpose of this amednment is to post new RFQ N6660425Q0437 and to update all attachments. Amendment 002: The purpose of this amendment is to post question and answer from industry and to add additional required drawings documents. Q2: Can you send the drawings and step files for the following? CLIN 0026 07093347 HOUSING,BLANK-FBG COUPLER CLIN 0031 07093361 MOUNT,HORN A2: See attached. 07093347 is obsolete in our latest TDP. I ve attached the drawing/STEP file for 07093339-2, which is its replacement. Amendment 001: The purpose of this amendment is to post question and answer from industry. Q1: I'd like to verify CDRL A001 CMM Test Data is only required for the 7 items listed in Block 10 and not for all 1-46 CLINS. Correct? A1: Correct. Please see attached synopsis/solicitation for full details.

From Combined Synopsis/Solicitation posted on Aug 01, 2025

Amendment 005: The purpose of this amendment is to post question and answer. Revised CDRLs forthcoming. All other terms and conditions remain unchanged. Q3: Can you clarify CDRL A001 & the Performance Specification requirement? Is the requirement for 1 CMM report for each PN (83 reports per CDRL A001) or for each UNIT of each PN (404 reports per Performance Specification)? A3: The Government requires 1 CMM report per unit for the following PNs: 07093372, 07093377, 07093378, 07093316, 07093339-1, 077093339-2, 07093303, & 07093359. For all other PNs, the Government requires 1 CMM report per PN. This would come out to a total of 91 reports. Amendment 004: The purpose of this amendment is to resolicit under full and open competition. As a result, the solicitation closing date and time is extended to 1400 EST, 15 August 2025. All other terms and conditions remain unchanged. Amendment 003: The purpose of this amednment is to post new RFQ N6660425Q0437 and to update all attachments. Amendment 002: The purpose of this amendment is to post question and answer from industry and to add additional required drawings documents. Q2: Can you send the drawings and step files for the following? CLIN 0026 07093347 HOUSING,BLANK-FBG COUPLER CLIN 0031 07093361 MOUNT,HORN A2: See attached. 07093347 is obsolete in our latest TDP. I ve attached the drawing/STEP file for 07093339-2, which is its replacement. Amendment 001: The purpose of this amendment is to post question and answer from industry. Q1: I'd like to verify CDRL A001 CMM Test Data is only required for the 7 items listed in Block 10 and not for all 1-46 CLINS. Correct? A1: Correct. Please see attached synopsis/solicitation for full details.

From Combined Synopsis/Solicitation posted on Aug 05, 2025

Notice history

4
  1. Combined Synopsis/Solicitation Posted Jun 23, 2025 View
  2. Combined Synopsis/Solicitation Posted Jul 17, 2025
    • Description: Description was updated
    • Response Deadline: Jun 23, 2025Jul 30, 2025
  3. Combined Synopsis/Solicitation Posted Aug 01, 2025
    • Description: Description was updated
    • Response Deadline: Jul 30, 2025Aug 15, 2025
    • Set-Aside: Total Small Business Set-Aside (FAR 19.5)No Set aside used
  4. Combined Synopsis/Solicitation LATEST Posted Aug 05, 2025
    • Description: Description was updated

Details

Solicitation number N6660425Q0437
Notice ID 1850be62a4de4ad394b02f58d2ca07d3
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 5995
NAICS 334511
Set-aside No Set aside used
Archive date Aug 30, 2025

Award Information

Not yet awarded

Contacts

primary
Elizabeth Peckham

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSEA
NAVSEA WARFARE CENTER
NUWC DIV NEWPORT

Dates

Posted Aug 05, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Aug 15, 2025 11 months ago