SPE4A726R0150 - 1560 – SHAFT, INPUT, GEARBOX / WSIC T SPE4A726R0150
Summary
AI-generated · Nov 06, 2025Indefinite Delivery/Indefinite Quantity contract for the 1560-000342468 Shaft, Input, Gearbox (structural support) with WSIC T. Approved sources are Aerometals Inc, Farwest Aircraft, Applied Mechanical Energy, Thomas Instrument Inc, Derco Aerospace Inc, and Northrop Grumman Systems Corp (under part-number 3-51232-501). The base term is five years with no options, targeting an estimated 159 units per year (delivery orders may range from 65 to 159 units). A Government First Article Test is required.
Delivery spans 635 days: 180 days to deliver the GFAT, 150 days for government review, and 305 days to deliver production units. Inspections and acceptance occur at the origin, with FOB destination. This is a DLA direct procurement and a 100% small business set-aside; the item is a critical safety product. Final award will weight price, past performance, and delivery (along with SPRS and other factors). The solicitation will be issued on or around November 20, 2025 on DIBBS; quotes must be written and submitted; no paper copies will be provided; all responsible small businesses may submit offers.
NSN 1560-000342468; SUPPORT STRUCTURAL; WSIC: T; IQC PR: 1000215305. THE APPROVED SOURCES FOR THIS PARTS ARE: AEROMETALS INC (32664), FARWEST AIRCRAFT, INC (34107), APPLIED MECHANICAL ENERGY (0BNH4), THOMAS INSTRUMENT INC (5H860), DERCO AEROSPACE INC (8X044) and NOTHROP GRUMMAN SYSTEMS CORP (79U29) UNDER PART-NUMBER 3-51232-501. THIS SOLICITATION WILL RESULT IN AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 5 YEARS WITH ZERO (0) OPTIONS. THE ESTIMATED ANNUAL QUANITTY IS 159 EACH; THE MINIMUM DELIVERY ORDER QUANTITY IS 65 EACH; THE MAXIMUM DELIVERY ORDER QUANTITY IS 159 EACH. GOVERNMENT FIRST ARTICLE TEST APPLIES. THE TOTAL DELIVERY DATE WILL BE 635 DAYS INCLUDE: 180 DAYS TO DELIVER THE GFAT, 150 DAYS FOR GOVENRMENT TO REVIEW AND 305 DAYS TO DELIVER THE PRODUCTION UNITS TO THE GOVERNMENT. INSPECTION AND ACCPETANCE WILL BE AT ORIGIN, FOB IS AT DESTINATION. THIS IS A DLA DIRECT PROCUREMENT. THE SOLICITATION WILL BE ISSUED AS 100% SMALL BUSINESS SET-ASIDE. THIS IS A CRITICAL SAFETY ITEM. PRICE, PAST PERFORMANCE AND DELIVERY WILL BE EQUALLY WEIGHTED. THE FINAL CONTRACT AWARD DECISION MAY BE BASED UPON A COMBINATION OF PRICE, PAST PERFORMANCE, SPRS AND OTHER EVALUATION FACTORS AS DESCRIBED IN THE SOLICITATION. THIS REQUEST IS FOR A WIRTTEN QUOTE. PLEASE SUBMIT OFFERES IN WRITING. A COPY OF THE SOLICITATION WILL BE AVAILABLE VIA THE DLA INTERNET BID BOARD SYSTEM (DIBBS) AT HTTPS://WWW.DIBBS.BSM.DLA.MIL/RFP ON THE ISSUE DATE CITED IN THE SOLICITATION. FROM THE DIBBS HOMEPAGE, SELECT "REQUESTS FOR PROPOSAL (RFP) / INVITATION FOR BID (IFB)" FROM THE MENU UNDER THE TAB "SOLICITATIONS." THEN SEARCH FOR AND CHOOSE THE RFP YOU WISH TO DOWNLOAD. SOLICITATIONS ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT READER. THIS SOFTWARE IS AVAILABLE FREE AT HTTP://WWW.ADOBE.COM. A PAPER COPY OF THE SOLICITATION WILL NOT BE AVAILABLE TO REQUESTORS. THE SOLICITATION WILL BE ISSUED ON OR AROUND NOVEMBER 20, 2025. ALL RESPONSIBLE SOURCES MAY SUBMIT AN OFFER, WHICH WILL BE CONSIDERED.
From Presolicitation posted on Nov 05, 2025Notice history
1-
Presolicitation LATEST Posted Nov 05, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA