SOUTH PARK DISTRICT OFFICE REHAB 1240LT25R0039
Summary
AI-generated · Aug 24, 2025Scope requires complete rehab of the South Park District Office, including removal and replacement of a standing seam metal roof with underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts; installation of an ice/snow melt system for the roof, valleys, gutters, and downspouts with electrical circuits; interior and exterior work such as removing carpet and installing carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, sealing windows, and adding eight new telecom outlets with associated electrical for communications. An optional item adds a chain-link fence, a pedestrian walk-through gate, a motorized gate with operator and keypad, and related electrical and safety features. The contractor must provide all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete the project per final drawings and specifications, with a site visit to be announced.
Amendments have updated the Specifications and Drawings (Amendment 0001 updating Attachments 3 and 4) and added a Summary of Changes with contractor questions and revisions to the solicitation documents (Amendment 0002), including updates to the specifications attachment. A forthcoming amendment will publish answers to vendor questions and the attendee list for the site visit.
SOUTH PARK DISTRICT OFFICE REHAB - FAIRPLAY, COLORADO - PSICC NF and NATIONAL GRASSLANDS The project scope of work includes, but is not limited to, the following: Mobilization, quality control, removal and installation of a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom. Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. See the SOW, SOI, Specifications, and Drawings for more details. Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions. See the SOW, SOI, Specifications, and Drawings for more details. An upcoming amendment will provide answers to questions from vendors and include the site visit's attendee's list.
From Solicitation posted on Jul 29, 2025SOUTH PARK DISTRICT OFFICE REHAB - FAIRPLAY, COLORADO - PSICC NF and NATIONAL GRASSLANDS 07/31/2025: Amendment 0001 (A0001): See and read the following in association with Amendment 0001: Amendment 0001 (A0001) and the Updated Attachments 3 and 4 for updates to the Specifications and Drawings. The Updated Attachments along with A0001 are located in the Attachments/Links. The project scope of work includes, but is not limited to, the following: Mobilization, quality control, removal and installation of a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom. Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. See the SOW, SOI, Specifications, and Drawings for more details. Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions. See the SOW, SOI, Specifications, and Drawings for more details. An upcoming amendment will provide answers to questions from vendors and include the site visit's attendee's list.
From Solicitation posted on Jul 31, 2025SOUTH PARK DISTRICT OFFICE REHAB - FAIRPLAY, COLORADO - PSICC NF and NATIONAL GRASSLANDS 08/14/2025: Amendment 00002 (A0002): See and read the following in association with Amendment 0002: Amendment 0002 (A0002) - read in its entirety as it includes the Summary of Changes with answers to contractor's questions and revsions to supporting solicitation documents. Also included in this Amendment as an attachment is Updated Attach _3 Specifications_08.14.2025. A0002 and the Updated Attachment are located in the Attachments/Links. 07/31/2025: Amendment 0001 (A0001): See and read the following in association with Amendment 0001: Amendment 0001 (A0001) and the Updated Attachments 3 and 4 for updates to the Specifications and Drawings. The Updated Attachments along with A0001 are located in the Attachments/Links. The project scope of work includes, but is not limited to, the following: Mobilization, quality control, removal and installation of a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom. Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. See the SOW, SOI, Specifications, and Drawings for more details. Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions. See the SOW, SOI, Specifications, and Drawings for more details. An upcoming amendment will provide answers to questions from vendors and include the site visit's attendee's list.
From Solicitation posted on Aug 14, 2025Notice history
3-
-
Solicitation Posted Jul 31, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 25, 2025 → Aug 29, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA