SOUTH PARK DISTRICT OFFICE REHAB 1150434
Summary
AI-generated · Aug 25, 2025Rehabilitation of the South Park District Office in Fairplay, Colorado includes removing and replacing the standing-seam metal roof with all required components (underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts) and installing a roof/valley/ gutter ice and snow melt system with electrical circuits. Interior and exterior work involves removing carpet and installing carpet tiles, replacing stained or damaged acoustical panels and ceiling tiles, sealing windows, and installing eight additional telecom outlets with associated electrical work.
An optional add-on includes installing a chain-link fence, a pedestrian walk-through gate, a motorized gate with operator and keypad, and related electrical and safety features. The contractor must supply all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete the project per approved drawings, specifications, and provisions. A mandatory site visit will be held at the project location—the South Park Ranger District Office, Fairplay, CO—with details coordinated through the contracting officer’s representative.
SOUTH PARK DISTRICT OFFICE REHAB in FAIRPLAY, COLORADO Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands Pikes Peak Ranger District ****************READ ALL OF THE INFORMATION BELOW - THERE WILL BE A SITE VISIT FOR THIS PROJECT***************** The project scope of work includes, but is not limited to, the following: Mobilization, quality control, removal and installation of a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom. Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions. A site visit is scheduled for July 22, 2025, at 2:00 p.m. Mountain Time. Contact the COR, Samantha Labella, at (719) 251-7182 or via email at Samantha.Labella@usda.gov by July 21, 2025, at 2:00 Mountain Time regarding attending the site visit. The project is located at the South Park Ranger District Office on the Pike National Forest, South Park Ranger District in South Park County, Colorado, directly north of the intersection of US Highway 285 and CO-9 in Fairplay, CO. (Physical address: 320 US Hwy 285, Fairplay, CO 80440.)
From Presolicitation posted on Jul 03, 2025Notice history
1-
Presolicitation LATEST Posted Jul 03, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA