Contacts, documents and full notice history are available with a subscription.
Sources Sought Expired 1 notice 1 document

Sources Sought: Tangier Island Beneficial Use W9123626SA002

Solicitation W9123626SA002 Copied Notice ID 120e1871f2ec456e9cb9470d8c51ef28 Copied DEPT OF DEFENSE — W2SD ENDIST NORFOLK
SAM.gov
Posted
Mar 11, 2026
Deadline
Mar 26, 2026
Set-aside
None
NAICS
237990
PSC
Y1KF

Summary

AI-generated · Mar 12, 2026

Evaluate the beneficial use of shoaled sediments in the Tangier Island navigation channel for shoreline stabilization by placing the material inside geotextile tubes. Current data indicate about 100,000 cubic yards of material in the channel, and the effort aims to reuse this sediment rather than disposing of it offshore or placing it directly along the shoreline. The related geotechnical and coastal summaries are provided to inform the assessment.

Respondents are asked to complete an industry survey addressing both geotechnical feasibility and coastal design considerations: whether the fine-grained dredged material can fill geotextile tubes and the expected losses, shrinkage, and final consolidated volume; anticipated dewatering times and the period to achieve required strength; and whether additional geotechnical data are needed. Coastal questions cover recommended wave heights for single and stacked tube systems, performance under elevated water levels and overtopping, anchoring/toe stabilization in sandy sediments (including anchor depth and foundation material), scour mitigation during storms, and whether tubes can be placed nearshore or must be placed on the beach. This is a sources sought to inform acquisition strategy; no solicitation is available yet. Prospective bidders should be SAM-registered and respond via the designated points of contact with relevant data.

THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSALS. ALL AVAILABLE INFORMATION IS INCLUDED IN THIS NOTICE. Purpose: USACE is evaluating the beneficial use of shoaled sediments within the Tangier Island navigation channel. The volume of shoaled material varies depending on dredging frequency; however, the most recent survey indicates that approximately 100,000 cubic yards are currently present within the channel. Instead of disposing of this material offshore or placing it directly along the shoreline, USACE proposes to use it for shoreline stabilization by placing it within geotextile tubes (i.e. Geotubes). Additional details regarding sediment characteristics are provided in the Geotechnical Summary, and design information is included in the Coastal Summary sections. The attached document contains both the Geotechnical Summary and the Coastal Summary. Please answer the survey questions below using the data from this document. Industry Survey: Given the details provided in the attached document, is it feasible to construct geotextile tubes given the fine grained nature of the soil and is there enough material available for the proposed design? Geotechnical Summary Survey Based on the fine-grained nature of the dredge material, it is feasible to fill geotextile tubes effectively? What are the anticipated losses during the dredging and infilling process of the geotextile tubes based on our geotechnical data? What is the expected "shrinkage" factor? Specifically, for every cubic yard of material dredged, what is the anticipated final, consolidated volume of material inside the tube? What are the anticipated dewatering times for the geotextile tubes, particularly when filled with material having a high percentage of fines? How long is the anticipated dewatering and consolidation period to achieve the required strength for the design? Should additional geotechnical data be collected to better inform your analysis? Coastal Summary Survey What are the recommended wave heights for single and stacked systems? How does the product perform during elevated water levels and overtopping conditions? What anchoring or toe stabilization measures are recommended in the sandy sediment? How deep do the anchors go to stabilize the geotextile tubes and is it pertinent to know the type of material the anchors are founded in? Surface grab samples indicate >98% sand. How is scour addressed during storm events that produce medium-high wave energy? Can the geotubes be placed in the nearshore (-3 ft MLLW), or do they need to be placed on the beach? This Sources Sought Synopsis should not be construed in any manner to be an obligation on the part of the U.S. Army Corps of Engineers Norfolk District to issue a contract or result in any claim for reimbursement of costs for any effort you expand responding to this request. No solicitation is currently available. The Government will utilize this information in determining an acquisition strategy. Please submit responses to the above questions via email to Caleb Bookout at brian.c.bookout@usace.army.mil, copying Tiffany N. Kirtsey at tiffany.n.kirtsey@usace.army.mil. Responses must be submitted no later than Close of Business 25 March 2026. All prospective contractors are required to be registered in the System for Award Management (SAM) database prior to contract award. Offerors and contractors may obtain information on registration and annual confirmation requirements by calling 1-866-606-8220 or via the Internet at https://www.sam.gov. Representations and Certifications Applications apply to this solicitation. Representations and Certifications may be completed online via the SAM.

From Sources Sought posted on Mar 11, 2026

Notice history

1
  1. Sources Sought LATEST Posted Mar 11, 2026

Details

Solicitation number W9123626SA002
Notice ID 120e1871f2ec456e9cb9470d8c51ef28
Notice type Sources Sought
Product / Service (PSC) Y1KF
NAICS 237990
Place of performance Tangier, Virginia
Archive date Apr 10, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
CALEB BOOKOUT

Email

Phone

secondary
Tiffany Kirtsey

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTH ATLANTIC
ENDIST NORFOLK
W2SD ENDIST NORFOLK

Place of Performance

Tangier, Virginia 23440
USA

Dates

Posted Mar 11, 2026 4 months ago
Last Updated Aug 06, 2026 2 days ago
Due Mar 26, 2026 4 months ago