SOURCES SOUGHT ONLY: PURCHASE AND INSTALL TRAFFIC LIGHT CONTROL PANEL (REPLACEMENT) FA461325Q00019
Summary
AI-generated · Aug 26, 2025Replace the traffic light control panel at F.E. Warren Air Force Base, providing all management, labor, tools, supplies, and equipment to complete the replacement in accordance with federal, state, and local laws and the performance work statement. The panel must be a standard aluminum P Cabinet with plug-ins, containing the specified components (MMU216Leip 510 Load Switches, 810 Flasher BIU 700 Flash Transfer Relays, Yunex Blade Traffic Controller, Marathon UPS Battery Backup with piggyback cabinet) or approved equivalents, operate automatically, and be functional 24/7/365. The contractor must supply all products, parts, equipment, and installation, subject to government approval.
Brand-name components are specified, or approved equal. The panel system must have a proven record of at least five years in similar conditions, with examples of other facilities using it. This is a sources-sought notice to assess industry capability to provide the replacement and related installation.
**BRAND NAME** The contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform a traffic light control panel replacement service at F.E. Warren Air Force Base, Wyoming, in accordance with all applicable federal, state, local laws and regulations and this performance work statement (PWS). Product Details: The traffic light control panel shall include the following functions/characteristics: Each panel shall have a new standard aluminum P Cabinet with associated plug ins Within each panel shall have the following components or approved equal: MMU216Leip 510 Load Switches 810 Flasher BIU 700 Flash Transfer Relays Yunex Blade Traffic Controller Marathon UPS Battery Backup with piggyback cabinet Panels must function 24 hours a day, 365 days a year. Panels must have positive track record of at least 5 years with examples of otherfacilities using it in similar conditions. Panels must have automated operation and activation. Contractor must provide all products, parts, equipment, and installation, subject toGovernment approval.
From Sources Sought posted on Jun 23, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA