Contacts, documents and full notice history are available with a subscription.
Sources Sought NONE Expired 3 notices

Sources Sought Notice for High-Speed Fiber-Optic Wi-Fi FA2543FitnessCenterWi-Fi

Solicitation FA2543FitnessCenterWi-Fi Copied Notice ID 87ad7606b17248e9a19b03867048847c Copied DEPT OF DEFENSE — FA2543 460 CONS
SAM.gov
Posted
Feb 18, 2026
Deadline
Feb 27, 2026
Set-aside
NONE
NAICS
5171
PSC
N/A

Summary

AI-generated · Feb 19, 2026

Provide a turnkey, managed high-density Wi-Fi solution for a government base fitness center (~80,000 sq ft) that must support more than 1,500 simultaneous users. Deliver a 1 Gbps symmetric fiber internet circuit and all required hardware, installation, and ongoing support, including an enterprise-grade firewall, a 24-port PoE switch, and high-density Wi‑Fi 6/6E access points. The solution is offered on a monthly subscription basis with all hardware, licenses, and support included, plus 24/7/365 proactive monitoring and a no-fault warranty covering repair or replacement of hardware.

Scope includes professional installation with a predictive site survey and network design, installation of all cabling and devices, and determination of the network demarcation point; placement of the router, switches, and access points; interconnecting wiring; verification of power; final system turn‑up, testing, and user training. The contractor must provide all tools and equipment, manage all software licenses, and ensure the system is fully installed and operational by the required date. Responses should be capability statements describing ability to meet the requirements, including past performance, and indicate whether you can meet the delivery deadline, submitted by the specified due date via email with the designated subject line.

Sources Sought Notice: Managed Wi-Fi Solution Reference Number: FA2543FitnessCenterWi-Fi Agency: Department of the Air Force, Buckley Space Force Base, Colorado Disclaimer: This is a Sources Sought Notice for market research purposes only and does not constitute a solicitation for proposals or a commitment to award a contract. The Government will not reimburse any costs associated with providing a response to this notice. 1. Introduction The 460th Force Support Squadron at Buckley Space Force Base (SFB), located in the Denver-metro area, is seeking sources capable of providing a turnkey, managed high-speed Wi-Fi solution for the base fitness center. The facility is approximately 80,000 sq. ft., constructed with a steel frame and concrete floors. The desired solution must support a high-density environment of over 1,500 simultaneous users. 2. Summary of Requirements The Government requires a comprehensive solution that includes a 1 Gbps fiber optic internet circuit and all associated hardware, installation, and ongoing support. Category Key Requirement Internet Service 1 Gbps symmetrical (1000 Mbps download/upload) dedicated fiber optic circuit. Core Hardware Enterprise-grade firewall, 24-Port Managed PoE Switch, and high-density Wi-Fi 6/6E Access Points. Service Model Monthly subscription basis, including all hardware, licensing, and support to eliminate upfront capital costs. Support & Warranty 24/7/365 proactive network monitoring and a "no-fault" warranty covering repair or replacement of all hardware. Project Completion The system must be fully installed, tested, and operational no later than March 29, 2026. 3. Scope of Work & Services The contractor shall provide all necessary hardware, software, engineering, and installation services for a complete 1 Gbps Managed Wi-Fi System. Core Service Features (Monthly Subscription): Turnkey Solution: Provide, manage, and maintain all components required for the service. Professional Installation: Includes a predictive site survey, network design to ensure optimal coverage, and professional installation of all cabling and hardware. Hardware Provision: All necessary equipment, including a firewall/controller, 24-port PoE+ switch, and Wi-Fi Access Points, provided on a subscription basis. Total Warranty & Replacement: All equipment is fully covered against failure, damage, or obsolescence for the duration of the contract term. License Management: Contractor is responsible for managing all required software and service licenses. Installation Tasks: The contractor shall perform all tasks required for a successful installation, including but not limited to: General site and Wi-Fi predictive surveys. Determination of network demarcation point. Placement and installation of router, switches, and Wi-Fi Access Points. Installation of all interconnecting wiring. Verification of adequate power sources. Final system turn-up, testing, and user training. General Requirements: The contractor is responsible for providing all tools and equipment necessary for installation (e.g., scissor lifts, ladders, cabling tools). 4. Response Submission Instructions Interested parties are requested to submit a capability statement in response to this notice. Submissions should be sent via email to travis.fritts.1@spaceforce.mil, with the subject line "Response to: FA2543FitnessCenterWi-Fi". Response Due Date: No later than 4:00 PM MST on February 25, 2026. Your capability statement should include: Company Information: Company name, address, point of contact, phone number, email address, CAGE code, and UEI number. Business Size: Please indicate your business size status (e.g., Small Business, 8(a), HUBZone, SDVOSB, etc.). Statement of Capability: A brief description of your company's ability to meet the requirements outlined in this notice. Please confirm your ability to meet the delivery deadline of March 29, 2026. Past Performance: A brief description of similar projects your company has completed for government or commercial clients.

From Sources Sought posted on Feb 18, 2026

UPDATE: A site visit to the Buckley Fitness Center (for the Wi-Fi project) is being offered to interested parties on Wednesday, February 25, at 10:30am MST. If you are planning to attend, please send an email to travis.fritts.1@spaceforce.mil with name/company of the attendee(s) for escort onto the base. Attendees will go to the Visitor Center, 1140 Aspen Street, Aurora, Colorado, 80017 to get a visitor pass. please arrive no later than 10:15am on February 25. *** Access to Buckley Space Force Base requires Real-ID compliant identification OR a current and valid US Passport. If you do not have either, you will not be able to enter the base. ---------------------------------------------------------------------- Sources Sought Notice: Managed Wi-Fi Solution Reference Number: FA2543FitnessCenterWi-Fi Agency: Department of the Air Force, Buckley Space Force Base, Colorado Disclaimer: This is a Sources Sought Notice for market research purposes only and does not constitute a solicitation for proposals or a commitment to award a contract. The Government will not reimburse any costs associated with providing a response to this notice. 1. Introduction The 460th Force Support Squadron at Buckley Space Force Base (SFB), located in the Denver-metro area, is seeking sources capable of providing a turnkey, managed high-speed Wi-Fi solution for the base fitness center. The facility is approximately 80,000 sq. ft., constructed with a steel frame and concrete floors. The desired solution must support a high-density environment of over 1,500 simultaneous users. 2. Summary of Requirements The Government requires a comprehensive solution that includes a 1 Gbps fiber optic internet circuit and all associated hardware, installation, and ongoing support. Category Key Requirement Internet Service 1 Gbps symmetrical (1000 Mbps download/upload) dedicated fiber optic circuit. Core Hardware Enterprise-grade firewall, 24-Port Managed PoE Switch, and high-density Wi-Fi 6/6E Access Points. Service Model Monthly subscription basis, including all hardware, licensing, and support to eliminate upfront capital costs. Support & Warranty 24/7/365 proactive network monitoring and a "no-fault" warranty covering repair or replacement of all hardware. Project Completion The system must be fully installed, tested, and operational no later than March 29, 2026. 3. Scope of Work & Services The contractor shall provide all necessary hardware, software, engineering, and installation services for a complete 1 Gbps Managed Wi-Fi System. Core Service Features (Monthly Subscription): Turnkey Solution: Provide, manage, and maintain all components required for the service. Professional Installation: Includes a predictive site survey, network design to ensure optimal coverage, and professional installation of all cabling and hardware. Hardware Provision: All necessary equipment, including a firewall/controller, 24-port PoE+ switch, and Wi-Fi Access Points, provided on a subscription basis. Total Warranty & Replacement: All equipment is fully covered against failure, damage, or obsolescence for the duration of the contract term. License Management: Contractor is responsible for managing all required software and service licenses. Installation Tasks: The contractor shall perform all tasks required for a successful installation, including but not limited to: General site and Wi-Fi predictive surveys. Determination of network demarcation point. Placement and installation of router, switches, and Wi-Fi Access Points. Installation of all interconnecting wiring. Verification of adequate power sources. Final system turn-up, testing, and user training. General Requirements: The contractor is responsible for providing all tools and equipment necessary for installation (e.g., scissor lifts, ladders, cabling tools). 4. Response Submission Instructions Interested parties are requested to submit a capability statement in response to this notice. Submissions should be sent via email to travis.fritts.1@spaceforce.mil, with the subject line "Response to: FA2543FitnessCenterWi-Fi". Response Due Date: No later than 4:00 PM MST on February 25, 2026. Your capability statement should include: Company Information: Company name, address, point of contact, phone number, email address, CAGE code, and UEI number. Business Size: Please indicate your business size status (e.g., Small Business, 8(a), HUBZone, SDVOSB, etc.). Statement of Capability: A brief description of your company's ability to meet the requirements outlined in this notice. Please confirm your ability to meet the delivery deadline of March 29, 2026. Past Performance: A brief description of similar projects your company has completed for government or commercial clients.

From Sources Sought posted on Feb 20, 2026

UPDATE: A site visit to the Buckley Fitness Center (for the Wi-Fi project) is being offered to interested parties on Wednesday, February 25, at 10:30am MST. If you are planning to attend, please send an email to travis.fritts.1@spaceforce.mil with name/company of the attendee(s) for escort onto the base. Attendees will go to the Visitor Center, 1140 Aspen Street, Aurora, Colorado, 80017 to get a visitor pass. please arrive no later than 10:15am on February 25. *** Access to Buckley Space Force Base requires Real-ID compliant identification OR a current and valid US Passport. If you do not have either, you will not be able to enter the base. ---------------------------------------------------------------------- Sources Sought Notice: Managed Wi-Fi Solution Reference Number: FA2543FitnessCenterWi-Fi Agency: Department of the Air Force, Buckley Space Force Base, Colorado Disclaimer: This is a Sources Sought Notice for market research purposes only and does not constitute a solicitation for proposals or a commitment to award a contract. The Government will not reimburse any costs associated with providing a response to this notice. 1. Introduction The 460th Force Support Squadron at Buckley Space Force Base (SFB), located in the Denver-metro area, is seeking sources capable of providing a turnkey, managed high-speed Wi-Fi solution for the base fitness center. The facility is approximately 80,000 sq. ft., constructed with a steel frame and concrete floors. The desired solution must support a high-density environment of over 1,500 simultaneous users. 2. Summary of Requirements The Government requires a comprehensive solution that includes a 1 Gbps fiber optic internet circuit and all associated hardware, installation, and ongoing support. Category Key Requirement Internet Service 1 Gbps symmetrical (1000 Mbps download/upload) dedicated fiber optic circuit. Core Hardware Enterprise-grade firewall, 24-Port Managed PoE Switch, and high-density Wi-Fi 6/6E Access Points. Service Model Monthly subscription basis, including all hardware, licensing, and support to eliminate upfront capital costs. Support & Warranty 24/7/365 proactive network monitoring and a "no-fault" warranty covering repair or replacement of all hardware. Project Completion The system must be fully installed, tested, and operational no later than March 29, 2026. 3. Scope of Work & Services The contractor shall provide all necessary hardware, software, engineering, and installation services for a complete 1 Gbps Managed Wi-Fi System. Core Service Features (Monthly Subscription): Turnkey Solution: Provide, manage, and maintain all components required for the service. Professional Installation: Includes a predictive site survey, network design to ensure optimal coverage, and professional installation of all cabling and hardware. Hardware Provision: All necessary equipment, including a firewall/controller, 24-port PoE+ switch, and Wi-Fi Access Points, provided on a subscription basis. Total Warranty & Replacement: All equipment is fully covered against failure, damage, or obsolescence for the duration of the contract term. License Management: Contractor is responsible for managing all required software and service licenses. Installation Tasks: The contractor shall perform all tasks required for a successful installation, including but not limited to: General site and Wi-Fi predictive surveys. Determination of network demarcation point. Placement and installation of router, switches, and Wi-Fi Access Points. Installation of all interconnecting wiring. Verification of adequate power sources. Final system turn-up, testing, and user training. General Requirements: The contractor is responsible for providing all tools and equipment necessary for installation (e.g., scissor lifts, ladders, cabling tools). 4. Response Submission Instructions Interested parties are requested to submit a capability statement in response to this notice. Submissions should be sent via email to travis.fritts.1@spaceforce.mil, with the subject line "Response to: FA2543FitnessCenterWi-Fi". Response Due Date: No later than 4:00 PM MST on February 27, 2026. Your capability statement should include: Company Information: Company name, address, point of contact, phone number, email address, CAGE code, and UEI number. Business Size: Please indicate your business size status (e.g., Small Business, 8(a), HUBZone, SDVOSB, etc.). Statement of Capability: A brief description of your company's ability to meet the requirements outlined in this notice. Please confirm your ability to meet the delivery deadline of March 29, 2026. Past Performance: A brief description of similar projects your company has completed for government or commercial clients.

From Sources Sought posted on Feb 23, 2026

Notice history

3
  1. Sources Sought Posted Feb 18, 2026
  2. Sources Sought Posted Feb 20, 2026
    • Description: Description was updated
  3. Sources Sought LATEST Posted Feb 23, 2026
    • Description: Description was updated

Details

Solicitation number FA2543FitnessCenterWi-Fi
Notice ID 87ad7606b17248e9a19b03867048847c
Notice type Sources Sought
NAICS 5171
Set-aside No Set aside used
Place of performance Aurora, Colorado
Archive date Mar 04, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Travis Fritts

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
FA2543 460 CONS

Place of Performance

Aurora, Colorado 80011
USA

Dates

Posted Feb 18, 2026 5 months ago
Last Updated Aug 06, 2026 1 day ago
Due Feb 27, 2026 5 months ago