SOURCES SOUGHT MARKET SURVEY - Asbestos Abatement - QKK Air Route Surveillance Radar Site - Koke'e State Park, Kauai HI 6973GH-26-R-45729
Summary
AI-generated · Jan 10, 2026Engage to plan and execute a site-specific asbestos abatement project at the QKK ARSR radar site inside Koke’e State Park, Kauai, Hawaii. The contractor will provide all labor, materials, equipment, and supervision to complete the removal in designated areas per drawings and specifications, while coordinating with FAA to avoid impacting the facility’s 24/7 operations; outages or access restrictions must be approved at least 24 hours in advance.
Key requirements include storing materials and staging only in FAA-approved areas, supplying any temporary utilities, and cleaning up and restoring the site and disposing of waste properly. Access is restricted and must comply with facility requirements, which may include providing a list of employees for access and coordinating all access through the project COR/Implementer. Davis-Bacon prevailing wage requirements apply, and all clauses applicable to the contract per the QVL will be included in the award.
SITE VISIT SCHEDULED ON LOCATION ON 13 JANUARY 2026 FROM 10AM-2PM HAWAII TIME The Davis Bacon Act will apply. All other applicable clauses per the QVL will apply and all applicable clauses will be present in the contract once awarded. 1.0 GENERAL SCOPE The selected Contractor shall furnish all labor, product, equipment, materials, and supervision for the planning and execution associated with the QKK (Koke e) Asbestos Abatement Project at the Radar site located within Koke e State Park in Kauai, Hawaii. The extent of the work will be specific to certain areas outlined within this package. The following items are a summary of the project and are provided solely for the purpose of describing the general nature of the work. The Contractor is responsible for accomplishing all items of work identified in the applicable drawings, specifications, and provisions of the contract: A. General 1. QKK ARSR is an active facility that supports operations 24 hours a day, 7 days a week. 2. All work shall be coordinated with the FAA and be accomplished on a Not to interfere with operations basis. 3. Any outages or access restrictions shall be approved at least 24 hours prior to the associated work 4. Construction material shall be stored only in FAA approved areas. 5. Construction staging shall be allowed only in the FAA approved areas. 6. The Contractor shall provide all temporary services required for construction. 7. The Contractor shall clean up and restore the site grounds to its original condition after the work has been performed and properly dispose of any project waste. 8. The site has access restrictions, and contractor shall comply with facility requirements. This may include providing a list of employees for access prior to beginning work. All access requirements will be coordinate through the project COR/Implementer.
From Sources Sought posted on Jan 09, 2026SITE VISIT SCHEDULED ON LOCATION ON 13 JANUARY 2026 FROM 10AM-2PM HAWAII TIME The Davis Bacon Act will apply. All other applicable clauses per the QVL will apply and all applicable clauses will be present in the contract once awarded. 1.0 GENERAL SCOPE The selected Contractor shall furnish all labor, product, equipment, materials, and supervision for the planning and execution associated with the QKK (Koke e) Asbestos Abatement Project at the Radar site located within Koke e State Park in Kauai, Hawaii. The extent of the work will be specific to certain areas outlined within this package. The following items are a summary of the project and are provided solely for the purpose of describing the general nature of the work. The Contractor is responsible for accomplishing all items of work identified in the applicable drawings, specifications, and provisions of the contract: A. General 1. QKK ARSR is an active facility that supports operations 24 hours a day, 7 days a week. 2. All work shall be coordinated with the FAA and be accomplished on a Not to interfere with operations basis. 3. Any outages or access restrictions shall be approved at least 24 hours prior to the associated work 4. Construction material shall be stored only in FAA approved areas. 5. Construction staging shall be allowed only in the FAA approved areas. 6. The Contractor shall provide all temporary services required for construction. 7. The Contractor shall clean up and restore the site grounds to its original condition after the work has been performed and properly dispose of any project waste. 8. The site has access restrictions, and contractor shall comply with facility requirements. This may include providing a list of employees for access prior to beginning work. All access requirements will be coordinate through the project COR/Implementer.
From Sources Sought posted on Jan 14, 2026Notice history
2-
Sources Sought Posted Jan 09, 2026
-
Sources Sought LATEST Posted Jan 14, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA