Synopsis for Overhaul of CH-47 Control Assembly, Quadrant W58RGZ-26-B-0019
Summary
AI-generated · Mar 09, 2026Identify potential sources capable of performing an overhaul of the CH-47 Control Assembly, Quadrant Input/Output (NSN 1680-01-549-4959, P/N 145ES010-8). The effort contemplates a five-year Firm-Fixed-Price IDIQ contract to overhaul 9–54 units, including Foreign Military Sales. The item is not a Critical Safety Item, and the overhaul must restore unserviceable units to like-new, fully serviceable, and air-worthy condition per DMWR 1-1680-391 (Rev. 7/21/2017, Change 0). This work is essential to sustain the CH-47 fleet. The notice is for market research planning and does not constitute a commitment or solicitation.
Respondents should demonstrate capability and identify business size and socio-economic status, and must provide full company name and points of contact. Submissions should be sent by electronic mail to the contract specialist by the stated deadline. No reimbursements will be provided for responses, and a solicitation synopsis will be issued later; the government reserves the right to pursue alternative acquisition strategies.
This is a sources sought. This announcement is in support of market research to determine the feasibility of a competitive acquisition and to identify potential sources that can provide the Overhaul of the following item: NOMENCLATURE: CH-47 Control Assembly, Quadrant Input/Output NSN: 1680-01-549-4959 Input/Output P/N: 145ES010-8 ESTIMATED QUANTITY RANGE: Minimum 9 Maximum 54 each Maximum of 54 each includes a quantity of 9 each Foreign Military Sales (FMS). The applicable North American Industry Classification System (NAICS) code is 336411 and the size standard is 1,500 employees. Interested parties who have the capability to perform the above effort should respond to this notice and identify your business size and socio-economic status as applicable. All submissions must include full company name, Point of Contracts (POCs) to include name, position, office, and mobile telephone numbers and email address. This requirement is to fulfill the government s need for the overhaul of the Control Assembly, Quadrant, NSN 1680-01-549-4959. The proposed contractual action is a five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract. The Control Assembly, Quadrant is not a Critical Safety Item (CSI). The overhaul shall be accomplished in accordance with Government specifications. The overhaul requires the complete restoration of unserviceable assets to a like-new, fully serviceable, and air-worthy condition in accordance with the specifications outlined in the Depot Maintenance Work Requirement (DMWR) 1-1680-391, Revision date 7/21/2017, Change # 0. This effort is essential for the ongoing sustainment and operational readiness of the CH-47 fleet. This announcement is for information and planning purposes only and should not be construed as a commitment by the Government for any purpose. This announcement does not constitute a IFB. A synopsis will be issued at a later date for this requirement. Requests for a solicitation will not receive a response. No reimbursement will be made for any costs associated with providing information in response to this announcement and any follow-up information requested. No basis for claim against the Government shall arise as a result of a response to this announcement or Government use of any information provided. This announcement does not restrict the Government to an ultimate acquisition strategy. The Government reserves the right to consider acquisition strategies as deemed appropriate. Submittal of information is requested via electronic mail only to Cameron Maclin, Contract Specialist cameron.a.maclin.civ@army.mil no later than 10 March 2025.
From Sources Sought posted on Mar 03, 2026This is a 100% Small Business Set-Aside. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul of the following assets: NOMENCLATURE: CH-47 Control Assembly, Quadrant INPUT/OUTPUT NSN: 1680-01-549-4959 INPUT/OUTPUT P/N: 145ES010-8 ESTIMATED QUANTITY RANGE: Minimum 9 each Maximum 54 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 9 each) This requirement is to fulfill the government s need for the overhaul of the Control Assembly, Quadrant, NSN 1680-01-549-4959. The proposed contractual action is a five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract. The Control Assembly, Quadrant is not a Critical Safety Item (CSI). The overhaul shall be accomplished in accordance with Government specifications. The overhaul requires the complete restoration of unserviceable assets to a like-new, fully serviceable, and air-worthy condition in accordance with the specifications outlined in the Depot Maintenance Work Requirement (DMWR) 1-1680-391, Revision date 7/21/2017, Change # 0. This effort is essential for the ongoing sustainment and operational readiness of the CH-47 fleet. An RFP will be issued at a later date for this requirement. No reimbursement will be made for any costs associated with providing information in response to this announcement and any follow-up information requested. No basis for claim against the Government shall arise as a result of a response to this announcement or Government use of any information provided. All responsible sources may submit an offer which shall be considered by the agency. The closing date annotated is an estimated date dependent upon the date of the release of the solicitation; however, the solicitation will not open prior to the closing date stated on the synopsis. No telephone requests for the solicitation will be accepted. Foreign firms are reminded that all request for solicitation must be processed through their respective embassies. All responsible sources may submit a proposal which shall be considered by the Agency. This requirement is currently unfunded. Award will be withheld pending receipt of sufficient funds. Point of Contact is Cameron Maclin, cameron.a.maclin.civ@army.mil.
From Presolicitation posted on Mar 17, 2026Notice history
2-
-
Presolicitation LATEST Posted Mar 17, 2026View changes (5)
- Title: Sources Sought for Overhaul of CH-47 Control Assembly, Quadrant → Synopsis for Overhaul of CH-47 Control Assembly, Quadrant
- Description: Description was updated
- Notice Type: Sources Sought → Presolicitation
- Response Deadline: Mar 10, 2026 → Apr 01, 2026
- Set-Aside: None → Total Small Business Set-Aside (FAR 19.5)
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA