Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 2 notices 4 documents

Small Business Set Aside - Comprehensive service coverage of a Bruker Avance III 400 MHz Nuclear Magnetic Resonance Spectrometer (NMR). W911QX26QA048

Solicitation W911QX26QA048 Copied Notice ID 5775ece1ae364cdf9dec0d16a6a4913a Copied DEPT OF DEFENSE — W6QK ACC-APG ADELPHI
SAM.gov
Posted
Apr 23, 2026
Deadline
Apr 29, 2026
Set-aside
SBA
NAICS
811210
PSC
J066

Summary

AI-generated · Mar 24, 2026

Provide comprehensive service coverage for a Bruker Avance III 400 MHz NMR spectrometer, including all related hardware, electronics, accessories, and MAS probes. The contract must include routine maintenance of the magnet and associated components, replacement of consumables (e.g., filters) at recommended intervals, and at least one annual performance maintenance visit. Include on-site assistance for liquid helium fills when levels are at or below 50% (the Army Research Laboratory will provide cryogen; typical fills occur about every 4.5 months and up to three fills may be needed per contract term). The contractor must re-energize and re-set magnets after a quench, provide on-site diagnostics and service for performance degradation or component failures with repairs or replacements as needed, and service probes on-site or at the contractor’s facility.

Security and access requirements apply for work on an Army-controlled installation: contractor personnel must pass required background checks and comply with personal identity verification and installation security policies (including NCIC-III/TSDB adjudication if not CAC-equipped). The work will be performed at Army Research Laboratory, Aberdeen Proving Ground, MD, under a base year with two option years, for a total contract period of three years.

Performance Work Statement (PWS) Service Contract for NMR Spectrometer & Related Equipment 23 March 2026 C.1 Background Comprehensive service coverage is required to ensure continuous, uninterrupted operation of the Bruker Avance III 400 Megahertz (MHz) Nuclear Magnetic Resonance Spectrometer (NMR), in service at the Weapons and Materials Research Directorate of the Army Research Lab (ARL), Aberdeen Proving Ground (APG), MD. The system is equipped with broadband probes and ancillary hardware and electronics to permit acquisition of both liquids and solid samples (i.e. magic-angle spinning, or MAS). C.2 Objective The NMR system is used daily by a wide variety of programs and projects, primarily to assess the outcomes of material or chemical synthesis efforts. With multiple users on any given day, a period without access to the NMR would hinder multiple research programs. A service plan is required to ensure the continued operation of the NMR, to ensure timely performance of routine maintenance, to ensure timely completion of cryogen fills, and to ensure proper function of both the liquids and solids probes. C.3 Requirement The respondent shall provide service and maintenance coverage of the indicated NMR system, (Serial Number # 10215255), and all associated hardware, electronics, accessories, and probes. C.3.1: The contractor shall provide routine maintenance of NMR magnet, electronics, accessories, probes, and other related items; replace consumables such as filters at recommended intervals. This includes at least one performance maintenance (PM) visit each year of coverage. C.3.2: The contractor shall provide a technician or engineer to assist with liquid cryogen (liquid He) fills as necessary, defined as liquid He level at 50% or less. A typical fill interval is every ~4.5 months, meaning that up to three (3) fills may be required in any contract term. ARL is responsible for providing the cryogen. Weekly fills of liquid nitrogen are to be handled by ARL staff. C.3.3: The contractor shall be responsible for re-energization and setup of magnets in case of a quench event. C.3.4: The contractor shall provide on-site (APG) diagnostics and instrument service in case of performance degradation or component failure. Remedies may include component repair/refurbishment or component replacement as needed. C.3.5: The contractor shall provide service for probes, when necessary, either on-site (APG) or at the provider s facility. C.4 AT-OPSEC Requirements C.4.1: Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204.9, Personal Identify Verification of Contractor Personnel) as directed by DoD, HQA and/or local policy. In addition to the installation change, the Government may require changes in contractor security matters or processes. C.4.2: For contractors that DO NOT require CAC but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local Security policies and procedures (provided by Government Representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. C.5 Distribution Statement C.5.1: Determination of Contract Submission Documents: DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. C.5.2: Determination of Information Generated from the Performance of the Contract: DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. C.6 Period of Performance (PoP) The Government intends to award a contract with one (1) base year plus two (2) additional option years for a total PoP of three years. The Contractor shall perform and comply with the full scope of this PWS for the option years if exercised. C.7 Place of Performance The service and maintenance coverage to be provided under this contract shall be accomplished at: Army Research Laboratory 6300 Rodman Road, Building 4600 Aberdeen Proving Ground, MD 21005

From Sources Sought posted on Mar 23, 2026

See attached documents for full description of requirement.

From Combined Synopsis/Solicitation posted on Apr 23, 2026

Notice history

2
  1. Sources Sought Posted Mar 23, 2026 View
  2. Combined Synopsis/Solicitation LATEST Posted Apr 23, 2026
    • Title: Sources Sought for Comprehensive service coverage of a Bruker Avance III 400 MHz Nuclear Magnetic Resonance Spectrometer (NMR).Small Business Set Aside - Comprehensive service coverage of a Bruker Avance III 400 MHz Nuclear Magnetic Resonance Spectrometer (NMR).
    • Description: Description was updated
    • Notice Type: Sources SoughtCombined Synopsis/Solicitation
    • Response Deadline: Mar 27, 2026Apr 29, 2026
    • Set-Aside: No Set aside usedTotal Small Business Set-Aside (FAR 19.5)

Details

Solicitation number W911QX26QA048
Notice ID 5775ece1ae364cdf9dec0d16a6a4913a
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) J066
NAICS 811210
Place of performance Aberdeen Proving Ground, Maryland
Archive date May 14, 2026

Award Information

Not yet awarded

Contacts

primary
Kevin Manley

Email

Phone

secondary
Melissa M Murphy

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
ACC-CTRS
ACC-APG
W6QK ACC-APG ADELPHI

Place of Performance

Aberdeen Proving Ground, Maryland 21005
USA

Dates

Posted Apr 23, 2026 3 months ago
Last Updated Aug 06, 2026 1 day ago
Due Apr 29, 2026 3 months ago