Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 3 notices 4 documents

Solicitation DUE DATE EXTENSION - ASR-9 Centrifugal Blowers - MMAC OKC 6973GH-25-Q-00157_ASR-9_Blowers

Solicitation 6973GH-25-Q-00157_ASR-9_Blowers Copied Notice ID caf86a83659e4cec86829bfb73b54203 Copied TRANSPORTATION, DEPARTMENT OF — 6973GH FRANCHISE ACQUISITION SVCS
SAM.gov
Posted
Aug 15, 2025
Deadline
Aug 21, 2025
Set-aside
SBA
NAICS
334419
PSC
4410

Summary

AI-generated · Aug 24, 2025

Procure and upgrade 200 Kooltronics blowers for the FAA: 100 H03 Exhaust Blowers (K3BB58-3) and 100 H01 Centrifugal Blowers (K3BB58-2). Units are to be shipped to Electro Mechanex LLC for comprehensive refurbishment, including dismantling, cleaning, and component inspection; windings must be tested for condition and integrity (Resistance, Hi-Pot, Surge, Inductance, and Ground Capacitance); mechanical fits measured and recorded; rotor/blower dynamically balanced to G2.5 (ISO 1940-1) to reduce vibration; endbells bore/sleeve to manufacturer specs; bearings fitted per ABMA procedures; windings cleaned and baked with BMG Polyurea EM lubricant; assembled and test-run at full rated voltage (60 Hz) for full output speed; all electrical and mechanical test measurements recorded; motor painted gray; end bearing cups re-machined with steel sleeves to precisely locate center and reduce EMF imbalance; bearing upgrade to premium NTN sealed ball bearing C3; install high-temperature bearing thrust washers; use BMG Gen 2 Polyurea motor grease rated for temperatures above 200F; dynamic balancing to G2.5; add grommets to flange mounting holes. Production units must be delivered beginning no later than 300 days after receipt of order, with preservation, packaging, and packing in accordance with Provision 61.

A subsequent notice indicates a due date extension, but the scope and requirements remain unchanged.

2. SCOPE OF WORK The contractor must furnish all labor, facilities, equipment, and materials to procure and upgrade the Kooltronics Blowers for the FAA as outlined in each section that follows. The specific quantities of units include the following: 1. One Hundred (100) H03 Exhaust Blowers - K3BB58-3 2. One Hundred (100) H01 Centrifugal Blowers - K3BB58-2 3. Ship Blowers to Electro Mechanex LLC to perform the following updates: a. Dismantle, Clean Parts & Inspect all components. b. Check Windings for condition and integrity (Resistance, Hi-Pot, Surge Comparison Inductance testing & Ground Capacitance). c. Measure all Mechanical fits and record the dimensions. d. Dynamically Balance Rotor/Blower to a balance quality grade G2.5 (ISO 1940-1), for reduced vibration during operation. e. Bore & Sleeve DE/NDE Endbell to Mfg specifications. f. Fit Bearings in accordance with ABMA fitting procedures. g. Clean and Bake Windings with fresh BMG Polyurea EM lubricant. h. Assemble Motor and Test run at full rated voltage at 60HZ for full output speed. i. Record and Document All Electrical and Mechanical test measurements. j. Spray Paint the Motor Machinery Gray. k. Re-machine motor end bearing cups; adding steel sleeves and precisely locating center to reduce electromagnetic force (EMF) imbalance. l. Bearing Upgrade: Premium NTN Sealed Ball Bearing C3 m. Install high temperature, bearing thrust washers. n. Bearing lubricant (BMG Gen 2 Polyurea Motor Grease) rated for temperatures above 200F o. Blowers dynamically balanced to a G2.5 grade. p. Add grommets to the mounting holes on the flange. 3. REQUIREMENTS 3.1 Production Units Delivery of production units shall begin NLT 300 days after receipt of order. 4. PREPARATION FOR DELIVERY 4.1 Preservation, Packaging, and Packing Preservation, packaging, and packing shall be IAW Provision 61.

From Solicitation posted on Jul 24, 2025

2. SCOPE OF WORK The contractor must furnish all labor, facilities, equipment, and materials to procure and upgrade the Kooltronics Blowers for the FAA as outlined in each section that follows. The specific quantities of units include the following: 1. One Hundred (100) H03 Exhaust Blowers - K3BB58-3 2. One Hundred (100) H01 Centrifugal Blowers - K3BB58-2 3. Ship Blowers to Electro Mechanex LLC to perform the following updates: a. Dismantle, Clean Parts & Inspect all components. b. Check Windings for condition and integrity (Resistance, Hi-Pot, Surge Comparison Inductance testing & Ground Capacitance). c. Measure all Mechanical fits and record the dimensions. d. Dynamically Balance Rotor/Blower to a balance quality grade G2.5 (ISO 1940-1), for reduced vibration during operation. e. Bore & Sleeve DE/NDE Endbell to Mfg specifications. f. Fit Bearings in accordance with ABMA fitting procedures. g. Clean and Bake Windings with fresh BMG Polyurea EM lubricant. h. Assemble Motor and Test run at full rated voltage at 60HZ for full output speed. i. Record and Document All Electrical and Mechanical test measurements. j. Spray Paint the Motor Machinery Gray. k. Re-machine motor end bearing cups; adding steel sleeves and precisely locating center to reduce electromagnetic force (EMF) imbalance. l. Bearing Upgrade: Premium NTN Sealed Ball Bearing C3 m. Install high temperature, bearing thrust washers. n. Bearing lubricant (BMG Gen 2 Polyurea Motor Grease) rated for temperatures above 200F o. Blowers dynamically balanced to a G2.5 grade. p. Add grommets to the mounting holes on the flange. 3. REQUIREMENTS 3.1 Production Units Delivery of production units shall begin NLT 300 days after receipt of order. 4. PREPARATION FOR DELIVERY 4.1 Preservation, Packaging, and Packing Preservation, packaging, and packing shall be IAW Provision 61.

From Solicitation posted on Jul 29, 2025

2. SCOPE OF WORK The contractor must furnish all labor, facilities, equipment, and materials to procure and upgrade the Kooltronics Blowers for the FAA as outlined in each section that follows. The specific quantities of units include the following: 1. One Hundred (100) H03 Exhaust Blowers - K3BB58-3 2. One Hundred (100) H01 Centrifugal Blowers - K3BB58-2 3. Ship Blowers to Electro Mechanex LLC to perform the following updates: a. Dismantle, Clean Parts & Inspect all components. b. Check Windings for condition and integrity (Resistance, Hi-Pot, Surge Comparison Inductance testing & Ground Capacitance). c. Measure all Mechanical fits and record the dimensions. d. Dynamically Balance Rotor/Blower to a balance quality grade G2.5 (ISO 1940-1), for reduced vibration during operation. e. Bore & Sleeve DE/NDE Endbell to Mfg specifications. f. Fit Bearings in accordance with ABMA fitting procedures. g. Clean and Bake Windings with fresh BMG Polyurea EM lubricant. h. Assemble Motor and Test run at full rated voltage at 60HZ for full output speed. i. Record and Document All Electrical and Mechanical test measurements. j. Spray Paint the Motor Machinery Gray. k. Re-machine motor end bearing cups; adding steel sleeves and precisely locating center to reduce electromagnetic force (EMF) imbalance. l. Bearing Upgrade: Premium NTN Sealed Ball Bearing C3 m. Install high temperature, bearing thrust washers. n. Bearing lubricant (BMG Gen 2 Polyurea Motor Grease) rated for temperatures above 200F o. Blowers dynamically balanced to a G2.5 grade. p. Add grommets to the mounting holes on the flange. 3. REQUIREMENTS 3.1 Production Units Delivery of production units shall begin NLT 300 days after receipt of order. 4. PREPARATION FOR DELIVERY 4.1 Preservation, Packaging, and Packing Preservation, packaging, and packing shall be IAW Provision 61.

From Solicitation posted on Aug 15, 2025

Notice history

3
  1. Solicitation Posted Jul 24, 2025 View
  2. Solicitation Posted Jul 29, 2025
    • Response Deadline: Aug 01, 2025Aug 15, 2025
  3. Solicitation LATEST Posted Aug 15, 2025
    • Title: Solicitation - ASR-9 Centrifugal Blowers - MMAC OKCSolicitation DUE DATE EXTENSION - ASR-9 Centrifugal Blowers - MMAC OKC
    • Response Deadline: Aug 15, 2025Aug 21, 2025

Details

Solicitation number 6973GH-25-Q-00157_ASR-9_Blowers
Notice ID caf86a83659e4cec86829bfb73b54203
Notice type Solicitation
Product / Service (PSC) 4410
NAICS 334419
Place of performance Oklahoma City, Oklahoma
Archive date Sep 05, 2025

Award Information

Not yet awarded

Contacts

primary
Raymond Lena

Email

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL AVIATION ADMINISTRATION
6973GH FRANCHISE ACQUISITION SVCS

Place of Performance

Oklahoma City, Oklahoma 73169
USA

Dates

Posted Aug 15, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 21, 2025 11 months ago