Contacts, documents and full notice history are available with a subscription.
Special Notice Expired 5 notices

Soil Sampling and Analysis of Wastewater Lagoons W5J9JE25R0010

Solicitation W5J9JE25R0010 Copied Notice ID b5b111bcd1e74a608d6e41044e356d67 Copied DEPT OF DEFENSE — W31R ENDIST AFGHANISTAN NORTH
SAM.gov
Posted
Sep 11, 2025
Deadline
Sep 15, 2025
Set-aside
None
NAICS
541380
PSC
B533

Summary

AI-generated · Aug 24, 2025

Determine soil sampling and chemical analysis to define the extent of contamination within the wastewater lagoon system footprint at Camp Buehring, Kuwait. The system consists of three aeration lagoons, two evaporation ponds, and one drying bed pond, with a stockpile in the southeast corner believed to be dredged soil from within the water treatment components.

The wastewater treatment facility is outside the CBKU bounds and is surrounded by berms approximately 20 feet high. Include the stockpile area in the sampling plan and address any contamination boundaries and conditions within the lagoon system and related facilities.

Determine the extent of contamination within the wastewater lagoon system footprint at Camp Buehring, Kuwait (CBKU). The existing Wastewater Treatment Facility is located outside the bounds of CBKU and is surrounded by berms roughly 20 ft. high. It includes three aeration lagoons, two evaporation ponds, and one drying bed pond. Additionally, there is a stockpile in the southeast corner of the facility area that is assumed to be dredged soil from within the water treatment components.

From Combined Synopsis/Solicitation posted on Aug 10, 2025

This Amendment, 0001, is required to:1. Incorporate the attached Request for Information (RFI) Government responses.All other terms and conditions remain unchanged.

From Combined Synopsis/Solicitation posted on Aug 26, 2025

This Amendment, 0002, is required to extend the proposal due date and update the solicitation requirement (see attached). When submitting the proposal ensure you acknowledge Amendment 0001 and Amendment 0002 by signing both SF30 documents. Late proposals will not be accepted.

From Combined Synopsis/Solicitation posted on Sep 10, 2025

This Amendment, 0002, is required to extend the proposal due date and update the solicitation requirement (see attached). When submitting the proposal ensure you acknowledge Amendment 0001 and Amendment 0002 by signing both SF30 documents. Late proposals will not be accepted. Amendment 1000 required to remove the MSDS requirement from the PIEE Solicitation Module.

From Combined Synopsis/Solicitation posted on Sep 11, 2025

This Amendment, 0003, is required to cancel the subject requirement. Reason: Funding is not available.

From Special Notice posted on Sep 28, 2025

Notice history

5
  1. Combined Synopsis/Solicitation Posted Aug 10, 2025 View
  2. Combined Synopsis/Solicitation Posted Aug 26, 2025
    • Description: Description was updated
  3. Combined Synopsis/Solicitation Posted Sep 10, 2025
    • Description: Description was updated
    • Response Deadline: Sep 09, 2025Sep 15, 2025
  4. Combined Synopsis/Solicitation Posted Sep 11, 2025
    • Description: Description was updated
  5. Special Notice LATEST Posted Sep 28, 2025
    • Description: Description was updated
    • Notice Type: Combined Synopsis/SolicitationSpecial Notice
    • Response Deadline: Sep 15, 2025Sep 29, 2025
    • Set-Aside: NoneNo Set aside used
    • NAICS Codes: 541380None

Details

Solicitation number W5J9JE25R0010
Notice ID b5b111bcd1e74a608d6e41044e356d67
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) B533
NAICS 541380
Place of performance KWT
Archive date Sep 23, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Christopher R. Preston II

Email

secondary
Kisha Cook

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
SCO ALEXANDRIA
ENGINEER DIVISION TRANSATLANTIC
W31R ENDIST AFGHANISTAN NORTH

Place of Performance

Camp Buehring Kuwait

KWT

Dates

Posted Sep 11, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Due Sep 15, 2025 10 months ago